US Army Corps of Engineers BUILDING STRONG ® Adult Outplant Site Improvement Update Jeremy Appt Technical Lead CENWP EC-DG David Leonhardt CENWP PM-E July.

Slides:



Advertisements
Similar presentations
Investigate Re-establishing Anadromous Fish Populations Above Man-made Barriers Oregon Department of Fish and Wildlife Willamette Basin.
Advertisements

Bull Trout Population and Habitat Surveys in the McKenzie and Middle Fork Willamette Presented by: Oregon Department of Fish and Wildlife February 22,
ISO Adult PIT Interrogation System Installations BPA Project Number July
CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Middle Fork Project AQ 6 – Fish Passage Technical Study February 3, 2009.
Unit 2 – Making Mountains – Earthquakes Geosc. 10 Earthquakes! Take a Quick Virtual Tour with Dr. Alley through the U.S. Forest Service Madison River Canyon.
Looking for Pieces of the Puzzle: LIFE HISTORY OF SPRING CHINOOK IN THE WILLAMETTE BASIN Kirk Schroeder Brian Cannon Luke Whitman Paul Olmsted Oregon Department.
Wetland Habitats: EMWMF Haul Road Remediation In 2005 a large haul road was constructed that resulted in loss of wetlands. To compensate for those losses,
Mindy Simmons US Army Corps of Engineers Dorie Welch, Daniel Spear
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
Overview of Current Production Programs Across the Columbia River Basin.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
* Winter flooding affect eggs/fry * Summer low flows affect migrating/spawning adults * Higher water temperatures stress all life stages * Increased opportunities.
US Army Corps of Engineers BUILDING STRONG ® RIVER RESOURCES ACTION TEAM BOAT TRIP Upper Mississippi River (Pools 24, 25, and Mel Price) St. Louis District.
US Army Corps of Engineers BUILDING STRONG ® St. Louis District Dredging Lance Engle Dredging Project Manager St. Louis District WEDA – Midwest 2012.
US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
Project Slide Show. This 1893 photograph is of the Prather pump in the Shasta River Canyon about five miles upstream of the mouth of the river. Large.
Clarence Cannon Dam and Mark Twain Lake Flood Control – damage reduction Navigation Hydropower Recreation Water supply Fish and Wildlife Conservation.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting July 21, 2008.
US Army Corps of Engineers BUILDING STRONG ® Temperature Target and Evaluation Criteria of the Middle Fork Willamette River Dan Turner Environmental Engineer.
Drought Impacts to Bull Trout in the Yakima Basin – 2001 (2005?) John Easterbrooks, Region 3 Fish Program Manager.
Gettysburg College Physics : Hiking the Grand Canyon, March 16-19, 2006 Next slide.
IDENTIFICATION citation: Swaney, D.P. & B. Hong Hudson SiO2 flux and site data presentation slides
Variation in Straying Patterns and Rates of Snake River Hatchery Steelhead Stocks in the Deschutes River Basin, Oregon Richard W. Carmichael and Tim Hoffnagle.
Stock Status of Steelhead In California Katie Perry, California Department of Fish and Game.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers US Geological Survey Lisa T Morales US Army Corps of Engineers Ward Staubitz US.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
US Army Corps of Engineers BUILDING STRONG ® Seattle SAME “Meet the Chiefs” COL Steve Miles, P.E., PMP 21 June, 2011.
US Army Corps of Engineers BUILDING STRONG ® Kansas Citys, Missouri and Kansas Flood Risk Management Project Presentation to Kansas City Industrial Council.
Abstract Background Conclusion Stream Bed Morphology and Discharge Rates of Deckers Creek Data was collected at 5 different points along a 100 meter transect.
The Willamette River n A look at the River n riverkeeper.org/theriver/
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Steelhead Stock Status Review and ESA Oregon Rhine Messmer ODFW District Staff Oregon Department of Fish and Wildlife Pacific Coast Steelhead Management.
Middle Fork Project Project Description April 25, 2006.
Lewis River Fish Passage Monitoring and Evaluation Plan (draft)
Clearwater Basin Collaborative Restoring America’s Forests Oct. 3-5, 2011, Truckee, CA Photo: William H. Mullins Kelly Creek CBC Landscape Assessment Preliminary.
US Army Corps of Engineers BUILDING STRONG ® JOINT FEDERAL PROJECT UPDATE for SAFCA Board US Army Corps of Engineers Pam Amie 19 May 2011.
US Army Corps of Engineers BUILDING STRONG ® Willamette High Head Bypass August 2014 FPT Brief Jeff Ament, Marie Phillips, Fenton Khan Portland District.
Water Supply at Beaver Lake, Arkansas Little Rock District US Army Corps of Engineers ® One Corps Serving The Army and the Nation.
IMPACTS OF DAM AND RESERVOIR PASSAGE ON OUTMIGRATING JUVENILE HATCHERY CHINOOK SALMON: RESULTS FROM A PAIRED RELEASE STUDY IN THE UPPER WILLAMETTE RIVER.
Matthew Keefer 1, George Naughton 1, Christopher Caudill 1, Tami Clabough 1, Greg Taylor 2, Matt Knoff 1, Cameron Sharpe 3 Grant Brink 1, Tim Blubaugh.
U.S. Department of the Interior U.S. Geological Survey Simulating Temperature Management under Climate Change at Detroit Lake, OR Norman Buccola, John.
2004 Oregon Steelhead Status Update Steve Jacobs Oregon Department of Fish and Wildlife.
Recovery Patterns of Coded-Wire Tagged Spring Chinook Salmon in the Upper Willamette River Basin David S. Hewlett Cameron S. Sharpe Oregon Department of.
US Army Corps of Engineers BUILDING STRONG ® Understanding Sedimentation and Land Use Cover Relationships in the Lake Sidney Lanier Watershed Russell A.
Placer County Water Agency Middle Fork American River Project Plenary Meeting June 1, 2009 Handout #2.
2013 Water Quality Implementation Report Water Quality Management Plan for 2012 Water Year Provo River and Jordanelle & Deer Creek Reservoirs.
Migration Behavior and Distribution of Winter and Summer Steelhead Radio-tagged at Willamette Falls Dam C. Erdman, M. Keefer, C. Caudill, M.
US Army Corps of Engineers Detroit District 2012 Training Volunteer Sediment Monitoring Corps & 2-Day Introductory Sediment Course Sediment Strong !
US Army Corps of Engineers Sacramento District BUILDING STRONG ® SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE Marshall Marik Project Manager South Sacramento.
Supplementation using steelhead fry: performance, interactions with natural steelhead, & effect of enriched hatchery environments Christopher P. Tatara.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
NEWS _menacehttp://news.yahoo.com/s/ap/climate_09_jellyfish _menace
Assignment: Civilian Conservation Corps Camp Wyman, Co. 671, Munising, Michigan, 1934 What was it like to be involved with the CCC in the 1930s? Use the.
Potential Causes and Management of Prespawn Mortality in Adult Upper Willamette River Spring Chinook Carl Schreck, M.L. Kent, S. Benda, C. Sharpe, J.T.
Herb Garn. Pheasant Branch watershed and monitoring locations USGS recording station Citizen Stream Monitoring site
2012 Central Valley Salmon Sport Fishing Regulations California Department of Fish and Game California Fish and Game Commission March 7, 2012.
Introduction Adventures in Long Range PIT Tag Detection Willamette Basin Research Vince Tranquilli and Mark Wade.
Upper Deschutes River Basin Steelhead Reintroduction
Adult Returns and Juvenile Outmigration Data
DRAFT Do Not Distribute
Albeni Falls Dam Operations
Oregon Department of Fish and Wildlife Corvallis Research Lab
McNary Juvenile Fish Emergency Bypass System
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
2017 SAVE OUR STREAMS MONITORING REPORT SML WATERSHED
SOUTH SACRAMENTO COUNTY STREAMS GROUP UPDATE
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Adult Outplant Site Improvement Update Jeremy Appt Technical Lead CENWP EC-DG David Leonhardt CENWP PM-E July 23, 2013

BUILDING STRONG ® PORTLAND DISTRICT 2 Sites Above Detroit Dam Collection Facility: Minto Gordon Road Site – located in North Santiam sub-basin at relatively lower position, commissioning complete, evaluation of release pipe ongoing USGS Site – located in Breitenbush sub-basin at lower position, commissioning complete, evaluation of release pipe ongoing Villa Maria Site - located in Breitenbush sub-basin at upper position, commissioning not complete, dynamic channel morphology has eliminated plunge pool, no consensus on release into riffle, evaluation of upper basin strategy ongoing, search for another upper basin site also ongoing

BUILDING STRONG ® PORTLAND DISTRICT 3 Coopers Ridge

BUILDING STRONG ® PORTLAND DISTRICT 4 USGS Site

BUILDING STRONG ® PORTLAND DISTRICT 5 Villa Maria Oct 2011 Pool no longer exists, release point upstream of leaning tree

BUILDING STRONG ® PORTLAND DISTRICT 6 Sites Above Foster Dam Collection Facility: Foster Riverbend County Campground – located in South Santiam sub-basin at relatively lower position, currently run as primary use site by ODFW, no improvements made by USACE Gordon Road– located in South Santiam sub-basin at upper position, commissioning complete, evaluation of release pipe ongoing

BUILDING STRONG ® PORTLAND DISTRICT 7 Gordon Road

BUILDING STRONG ® PORTLAND DISTRICT 8 Sites Above Cougar Dam Collection Facility: Cougar Creek Slide Creek Campground – Existing use, no improvements, access agreements acquired. Hard Rock – Existing use, no improvements, access agreements acquired. Homestead– located in McKenzie sub-basin in upper position, commissioning complete, however release pipe needs improvement

BUILDING STRONG ® PORTLAND DISTRICT 9 Homestead

BUILDING STRONG ® PORTLAND DISTRICT 10 Sites Above Dexter/Fall Creek Dams Facilities: Fall Creek collection and Willamette Hatchery Gold Creek– located in Middle Fork Willamette sub-basin in upper position, truck ramp only, commissioning pending Alt Site #1 – Located in the North Fork Willamette sub-basin in upper position, truck chute release, commissioning complete

BUILDING STRONG ® PORTLAND DISTRICT 11 Alt Site #1

BUILDING STRONG ® PORTLAND DISTRICT 12 Gold Creek Truck Ramp