Laser Extinction Measurement System (LEMS) Group Members: Jack Copenhaver Kara Griffin Billy Holland Tiruneh Haile Faculty Advisor: Dr. Jie Chen Sponsor:

Slides:



Advertisements
Similar presentations
How to Give a Good Final Presentation c 2011 Prof. S. S. Levine.
Advertisements

Feasibility Study of Replacing an Industrial Hydraulic Lift System with an Electro-Mechanical Lift System Critical Design Review Thursday, 21 September.
HELMET MARKING TOOL Michael Meck, Katherine Bagwell, Chad Wilkinson, Tristan Assimos BACKGROUND INFORMATION PROJECT SCOPE FINAL DESIGN CONCEPT GENERATION.
Manufacturing Automation
Ray Schroeder ET 493 Senior Design I Advisor: Dr. Cris Koutsougeras Spring Semester /5/2014.
Ray Schroeder ET 494 Senior Design II Advisor: Dr. Cris Koutsougeras Fall Semester /5/2014.
Maintenance At Your WWTP August 2010
Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Presenters: Michael Dixon Ben Gheliuc Group Members: Haidar Al Gharash Daniel Gheliuc Fue Her Zach McCurter Capstone Advisors: Faryar Etesami Evan Thomas.
1Rugby 55 Presentation – January 2007 The Rugby 55 User Presentation.
COMPACT MOBILE LIFTING DEVICE Team Michael Shaffer, Ken Kammerer, Dave Geesaman, Jin Ko Sponsor: Jim Adkins, Fraunhofer Advisor: Dr. Michael Keefe.
Eric Hettler - ME William Gallagher - ISE Christopher Mieney - ME Gregory Ryan - ME Joseph Cole - EE FAB AMERICA.
1 DIFFERENTIAL POLARIZATION DELAY LINE Controller FINAL REPORT D0215 Supervisor : Mony Orbach Performed by: Maria Terushkin Guy Ovadia Technion – Israel.
Multidisciplinary Engineering Senior Design Project 05xxx Project Name 2005 Critical Design Review May 13, 2001 Project Sponsor: Team Members: Team Mentor:
EDGE™ Centering Magnet Device P08028 By: Aaron Burger.
Aries Engineering Design Team 06/06/2008 Aries Engineering Design Team Matt Baker Pete Levno Zach Perryman Jessica Pierry Industry Advisor: Ken Millard,
LASER MEASURING DEVICE Team Members:Don Ainsworth David Linder Sagar Mathur Bokah Worjoloh Customer: United States Army Mission: Conceptualize, design,
Team CNH Design a less expensive propulsion control system with equivalent or better performance than existing hardware for Hydrostatic Windrower Machine.
GE Energy Silicon Wafer Measurement System Team 10 Olin Biddy Scott Johnson Chetwyn Jones Rob McCoy Tim Weber.
Multidisciplinary Engineering Senior Design Project xxxxx Project Name Preliminary Design Review mm/dd/yy Project Sponsor: Team Members: Team Mentor: Acknowledgements:
Air Products Reactor Catalyst Changeout Daniel Brisach, Nick Dobies, Laura Elliott, Chris Reed, Janessa Smith.
1 Press Ctrl-A ©G Dear 2010 – Not to be sold/Free to use Distance between Two Points. Stage 6 - Year 11 Applied Mathematic (Preliminary Extension 1)
Javier Angulo Alan Benedict, Team Leader Amber Russell, Team Manager
Mechanical Engineers: Brian Church Tyler Breitung Michael Oplinger Electrical Engineers: Anthony Salmin Ross Bluth Stephen Mroz Sponsor: Dr. Roman Press.
Oil Safety Control.
Ultrasonic Probe Manipulator Group:Chris Weisheim Tim Pommer Rishi Govalakrishnan Alan Koers Mentor: Dr. Jie Chen Sponsor: IU Medical School Department.
Managing Project Quality
HearingMate presents… Portable Fire Alarm for the Deaf Xiang Chen, CTO Alisha Ling, CEO Christopher Liu, CMO Tiffany Lu, CFO Jessica Lui, CRO.
1. 2  Team Members:  Dan Fenton (CE) – Team Lead  Ryan Muckel (ME)  Christopher Freeman (ME)  Derek Zielinski (EE)  Eric Welch (EE)  Kennedy Kong.
María Camila Luna Pablo Santizo Matheu Zachary Borden Zachary Delurey ENIORDESIGNENIORDESIGN.
Auto Board Power Testing George Madden Principle Engineer.
FINAL DESIGN: To make our design “Universal” any sensor that uses the standard 4-20mA Output or any T-type thermocouple may be used. SOLIDWORKS CAD FINAL.
Kanban/Pull System As Part of the Continuous Improvement Process at Whirlpool Corporation - Findlay.
Welcome to Chemistry 116! Lab Safety and Proper Procedures Labs 1.
FPGA Controlled Laser Assembly FPGA Controlled Laser Assembly Project Dec03-07October 8, 2003 Client National Instruments Faculty Advisors Professor Mani.
Elizabeth Dick, Vijay Patel, Trish Pham, Breanne Walters, Josh Collins Dr. Sohel Anwar-Project Sponsor FALL 2007 Steer-by-Wire System Gear Box Design.
Highly Flexible Design for Gantry Robot Systems Team: F08-77-FLXGANT1 Client: Logic One Robots Contact: Bill Egert, Engr VP.
Status of North Area Target (TCC2) & prospects EATM 28/07/2015D. Grenier1 Targets (T2, T4, T6 and T10) replaced in 2014 during LS1 (+ 4 spares) Previous.
Getting to Know UNO’s Course Evaluation Instrument and its Use in TABS Brian McKevitt Lisa Kelly-Vance Center for Faculty Excellence Sept. 10, 2015.
Graphing Using Excel AB Volume of Lead (ml)Mass of Lead (g) How to input data into Excel. Units only go in the column title not with.
Design of a Device for Manipulating Small Objects in a Solution Design Team: James Black, Seong Byun, Jeremy Johnson, Nathan Wagers ME 462 Capstone Design.
Section 3.5 Graphing Techniques: Transformations.
Bobcat Drillers Patrick Kirts, Jake Waldrep, Dr. Humboldt Mandell, Tyler Sterling, and Davontae Habbit.
AO-AD Unit 81 NYS Department of State Office of Fire Prevention & Control APPARATUS OPERATOR AERIAL DEVICE Outreach Training Course 79.
Chemistry Lab Equipment
Design of a Nulling Yaw Probe for a Gas Turbine Engine Test Rig
Abstract Parking your vehicle in the garage is a task that most of us take for granted. We head home from work or school, raise the garage door and drive.
Positioning Sensor for Electric Motor Drive ENGR 498 Senior Design College of Optical Sciences Industrial Affiliates.
14471 Vibration Test Apparatus: Systems Design Review Team Lead: Brett Billings Lead Engineer: Nicholas G Scribe: Ashley W EDGE: Claire Kobal Team Members:
FlowArm PLTW Motions © 2013 Project Lead The Way, Inc.Computer Integrated Manufacturing.
INSTRUMENT CONTROLLED MICROSCOPY Mason Jellings, Justin Gearing, Sarah Reichert, John Byce Client: Dr. Joshua Medow Advisor: Professor Thomas Yen Introduction.
Turbo Installation Manipulator Final Design Review
Prototyping SoC-based Gate Drive Logic for Power Convertors by Generating code from Simulink models. Researchers Rounak Siddaiah, Graduate Student-University.
Raechel Huebner Ruthanne Sherer
FlowArm PLTW Motions Computer Integrated Manufacturing
Design of a Solar Tracker
Detailed Design Review Week 12
Motion Stage for Optical Coherence Tomography
Elec 2607 Digital Switching Circuits
Product Evaluation & Quality Improvement
Duct Insulation Attachment Team
Product Evaluation & Quality Improvement
NC and CNC machines and Control Programming
Chart Solution Enhancements
2.009 Final Presentation Team Yellow December 10, 2007
Intervals of Increase and Decrease
Yakima T.O.C. Load Assist Presenters: Group Members: Haidar Al Gharash
Failure Mode and Effect Analysis
Created by Mrs. Bertoson Feb 2012
Gearmotor Efficiency W table top gearmotor pulley string.
Presentation transcript:

Laser Extinction Measurement System (LEMS) Group Members: Jack Copenhaver Kara Griffin Billy Holland Tiruneh Haile Faculty Advisor: Dr. Jie Chen Sponsor: Dr. Siva S. Krishnan Capstone Design Project, SP 2006

Overview Introduction Planning the Project Customer Requirements & Project Objectives Benchmarks Concept Development & Design Final Design Design Validation Overall Product Design Evaluation Recommendations Acknowledgements Summary

Customers Dr. Siva S. Krishnan, Professor Manish K. Saini, Research Assistant

Laser Extinction Device Laser Horizontal Knob Vertical Knob Burner

Planning the Project – Gantt Chart

Customer Requirements & Project Objectives Align the Laser to the Burner Improve Safety Improve Accuracy More Ergonomic Cost Effective Decrease Experiment Time

Problems with Benchmark

Concept Development & Design 1. Design Concepts  Motorized Vertical & Horizontal Travel  Motorized Vertical Travel with Manual Horizontal Travel  Manual Extension on Vertical Travel 2. Alignment Procedure

Concept #1 

Concept #2 

Concept #3

Alignment Procedure Alignment Target  Normalize the laser to the burner surface  Put the goggles on to view laser beam  Use the LabView program to move the burner until the laser is aligned on the target  Move the burner in the positive vertical direction 76.2 millimeters.  Open COSMOS program provided by Velmex and set the zero position Zero Position

Final Design Concept Cost MANUAL TO MOTORIZED CONVERSION KIT MMC $95.00 MANUAL TO MOTORIZED CONVERSION KIT MMC $95.00 VEXTA PK266-03A STEP MOTOR $ VEXTA PK266-03B STEP MOTOR $ D6CL DAMPER FOR TYPE 23 STEPPER MOTORS $88.00 VXM-2 PROGRAMMABLE STEP MTR CNTRL,2 AXIS $ Total Cost$1,383

Design Validation BenefitsPer Experiment Fuel Savings $25 - $50 Oxygen O 2 Savings $50 - $75 Improved Time 45 min – 1hr Improved AccuracyFrom ± 0.1 mm *********************************************************** More Ergonomic Enhanced Safety Cost Effective

Overall Product Design Evaluation

Summary – Concept #1 Overall Benefits Best Overall Concept Improved Safety Improved Accuracy More Ergonomic Decreased Experiment Time Added Benefits Fuel Savings Cost Effective - Return on Investment ($$$)

Recommendations Motorize Laser Closed Loop Feedback System

Acknowledgments Dr. Jie Chen, Faculty Advisor Dr. Siva S. Krishnan, Sponsor and IUPUI Professor Mr. Rudy Earlson, Manufacturing Consultant Mr. Eric Docteur, Velmex Inc. Mr. Manish K. Saini, Graduate Research Assistant Mr. Mitch Evans, Velmex Inc.

Questions?

Design Validation Target Values Old LEMS Design New LEMS Design Laser Alignment Time (min.) Burner Alignment Time (min.) Laser Alignment Process Easability (steps) 363 Burner Alignment Process Easability (steps) 362 Time to Move Burner (min.) Number Of Steps to Move Burner (steps) 242 Knob Position (Distance from Operator) (m) 01.10

Failure Modes OperationalCharacteristics Mode of Failure No.ObjectPotential Failure Potential Causes of Failure Potential Effects of Failure 1X-axis MotorBurn OutOverworked, old Research Delay, Delays Use of Bislides 2Y-axis MotorBurn OutOverworked, old Research Delay, Delays Use of Bislides 3ControllerCircuit FailureOverworked, old Complete Shut Down of System 4 Lead Screw Vertical Worn Out Vertical Limit Switch Failure Complete Shut Down of Vertical Slide. Horizontal would Still be Operational 5 Lead Screw horizontal Worn Out Horizontal Limit Switch Failure Complete Shut Down of Horizontal Slide. Vertical Slide would Still be Operational 6 Lab View Program Burn Out Motors and Damage to Limit Switches Improper Input Data for Motor Specifications Complete Shut Down of System