Field Feeding Systems Update

Slides:



Advertisements
Similar presentations
Heat to Energy Recycler System (HERS) … an innovative and environmentally friendly way to reduce heating costs within the food service industry Presenter:
Advertisements

HVAC523 Heat Sources.
Thermostats, Pressure Switches, and Other Electric Control Devices
VSE Corporation Proprietary Information
Kitchen Corps, Inc. Putting the pieces back together!
KING COUNTY & BROWN GREASE Local sewer agencies have a need to address restaurant grease trap waste. In response, there is the potential of a renewable.
PROPANE ENERGY POD. Propane Energy Pod Overview The Propane Energy Pod is a home energy package that delivers superior comfort and efficiency compared.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Office: (903) Web: Advanced Technology for the Heat Treatment Industry.
Pulse Drying What is it?. Pulse Drying Pulse drying is a relatively new technique for rapidly drying high moisture/medium solids feed streams into a much.
Elliott Microturbines Absorption Chiller Integrated System Development
BEE SME Program in Jamnagar Brass Cluster November 19, 2009.
Most of the industrial cold rooms have to be designed individually based on specific site condition and client’s requirement therefor turning the job a.
Warrior Logisticians 1 Army Food Service Operations CW5 Jack Van Zanten The Army Food Advisor Spring 2009 R&DA.
11-1 Copyright  2010 McGraw-Hill Australia Pty Ltd PowerPoint slides to accompany Puffett, Hossack, Stone, Burn & Miles, Gasfitting 2e Chapter 11 OPERATION.
“Operational Ration Update” Ms. Beverly Hamlette Army Field Feeding Specialist 2013 Partnership Day.
Army Worldwide Food Service Workshop 2008 LTC ROB BARNES Director of Operations, Army Center of Excellence, Subsistence (ACES) Quartermaster Center and.
PM AAVS Program Brief For 2005 Combat Vehicles Conference.
High Efficiency Commercial Gas HCG Series. 2 American HCG Series The HCG Series High Efficiency Commercial Gas Water Heaters embody all that’s great about.
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
“Energy Efficiency Guide for Industry in Asia”
The Natural Gas Advantage. MEETS 22 PERCENT OF U.S. ENERGY REQUIREMENTS HEATS 57 PERCENT OF U.S. HOUSEHOLDS FUELED 20 PERCENT OF ELECTRICITY GENERATED.
POWER GENERATION TECHNOLOGIES
Cogeneration.
The impact of distributed micro-CHP on energy efficiency
Steam Power Station Presented By Ashvin G. Patel Asst. Prof. (E.E.)
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
HISTORY MARKET The Development of Concept Companies into Entrepreneurial Business SEED STAGE & EARLY STAGE VENTURE CAPITAL Funding Mentoring UNIQUENESS.
Overview of Energy Efficiency & Renewable Energy (Draft version) Prepared by Natural Resources Canada in association with Indian and Northern Affairs Canada.
Fleet Performance and Reliability in Generation Utilities
NFPA 31 Standard for the installation of Oil- Burning Equipment
Natural Gas End Use: A Vision for Today and the Future American Gas Association Press Briefing September 22, 2009, Washington, DC Neil Leslie ,
© 2008 NORA Working Toward a Sustainable Future with Liquid Fuels May 2, 2008 John Huber President National Oilheat Research Alliance, NORA.
Plant Utility System (TKK-2210) 14/15 Semester 4 Instructor: Rama Oktavian Office Hr.: M-F
Army Field Feeding Systems
UNCLASSIFIED CFD Efforts to Improve Transport of Meals and Water in Theatre.
Logistics Workforce Categories  Ms. Vicki L. Harris  DRC Contractor  Force Management and Organization Division  (A4RF)
CHAPTER 9 SUSTAINABILITY When was the Environmental Protection Agency started? (575) 1970.
Idle Reduction Projects for the Advanced Vehicle Testing Activity Ken Proc, Project Leader, Fleet Test and Evaluation Center for Transportation Technologies.
Keynote Address 2004 Tactical Wheeled Vehicles Conference
2003 USSOCOM SOF CBRN CONFERENCE DECONTAMINATION UPDATE
Research Advances Towards Low Cost, High Efficiency PEM Electrolysis Dr. Katherine Ayers Presented by: Larry Moulthrop NHA 2010, Long Beach, CA.
UNCLASSIFIED Army Field Feeding Systems. UNCLASSIFIED Army Field Feeding Systems Vision: To provide the right food service equipment to Army Combatant.

Prepared by : Nishant .A. Raval
Lancom 4 In Power and Boilers Derek Stuart. Lancom 4 In Power and Boilers Derek Stuart Combustion Theory In order to maximize the heat capture (efficiency)
Food Service Equipment
Action/Initiative Date Action Initiated: December 2003 Status: On-Going Government and Industry Forum consisting of all military services, weapons system.
SATURN – GAS TURBINES POWER GENERATING AND GAS COMPRESSOR SETS
GORT Planning/Guidance Session with LTG Barclay
Ontario SMART GREEN Program. Program Overview  SMART Green is a program funded by the Ontario Government to drive competiveness, energy efficiency and.
Joint Expeditionary a-Transportable Shower System (JETSS)
DoD Template for Application of TLCSM and PBL
Elliott Microturbines Absorption Chiller Integrated System Development
Plug-in to the Future of Hybrids
Introducing the Bradford White ICON System™ and Accessory Packages
Army G-4 Army Food Program
USMC Update 25 Oct 2016 Mr. Chuck Girard
1 EE Kitchen equipment.
Top Quality Desuperheater Manufactured by Maniks
USMC Update 24 May 2017 Mr. Chuck Girard
United States Army Chief of Transportation
Chapter 11 Large Equipment. Chapter 11 Large Equipment.
“TWV: Fixing the current fleet while preparing for the future”
Addressing HPWH Market Barriers: Expanded Perspective
ENGINEERING ECONOMICS
14 Large Equipment. 14 Large Equipment Objectives Identify various pieces of large equipment used in commercial kitchens. Recognize marks that certify.
Presentation transcript:

Field Feeding Systems Update Modern Burner Unit Mobile Kitchen Trailer Food Sanitation Center Containerized Kitchen Assault Kitchen Multi Temperature Refrigerator Containerized System

Modern Burner Unit (MBU) MISSION: Primary heat source for Cooking Operations in All Army Field Feeding Equipment. Same foot print as M2 burner Push button operation JP8 fuel Refuels in place (push button) School will stop teaching M2 burner shortly Price of burner 2030.50

Fuel Delivery Block Upgrade Control panel and data plate decals will be changed to reflect updated MBU Current NSN If you have a V3 it will be located on the front decal V3 includes – fuel delivery block upgrade (382.00), flame sensor upgrade (46.01) and the frame is rounded with a bump on the bottom frame. Note: the fuel delivery block includes the flame sensor

Thermostatic Control (Prototype) Automatically cycles burner on and off to maintain set point temperature. Target applications: Sanitation sinks, CK oven & CK steam-table. Same control designs for all appliances. Planned fielding in 2008 This is a second generation prototype currently being tested. A harness is installed on the MBU The thermocouple attaches to the harness to control the burner (off/on) The thermocouple can be disconnected and the MBU can be operated normally in any appliance. The thermocouple used power from the MBU to operate

MKT Reset Program Participants SBCCOM Letterkenny Army Depot Penn Metal ACES

MKT Reset Kit Program Objective(s): Capability Provided: Develop a kit to improve the capability of MKTs going through RESET Assure the MKT remains relevant and effective as a field-feeding asset for its remaining life cycle Capability Provided: Updated food preparation equipment Improved power source Reduced fuel consumption Old and getting older MKT must have been in the sand to qualify for the reset program funded by DA. Reset to date FY 04 – 116, FY05 – 294, FY 06 400 scheduled MKT-I Kit available – NSN – 7360-01-469-5482 cost 11,553 MKT-I Includes: Vitalization/Circulation, florescent lighting, cold weather kit (floor mats), new fabric, screen assembly can opener, grill w/ higher lip, ice chest

Applications/Deliverables: MKT Reset Kit Program ROI/Benefits: Quieter, cleaner, more reliable power source Improved food quality and more variety of preparation options, optimized for current operational rations Faster preparation of UGR H&S rations Less costly, more reliable spare parts Project will leverage and efforts of 2004 program (Oven and Tray Pack Heater Tank) Applications/Deliverables: Prototype kit installed on an MKT Platform A modified DMWR to facilitate insertion of kit into ongoing ILSC RESET program at Letterkenney Army Depot (LEAD)

FY08 Planned Accomplishments: MKT Reset Kit Program FY08 Planned Accomplishments: Analyze data to determine target improvement areas Ration menus User questionnaires Previous test data for ovens, ranges, and tray-pack heater tanks (TPHT) Reliability and manufacturing processes of MKT components Suitability testing of oven, skillet, power sources, TPHT Select conceptual design for prototype kit

Mobile Kitchen Trailer - Future 9 Quantitative Metrics: Current: 9 - 60K BTU/hour burners, 15K BTU/hour heat transfer each 18-27 gallons of fuel/meal, up to 240 gallons water (sanitation) Low capacity, military unique appliances, 3 hours/meal 2 footprints (sanitation center and kitchen) Goal: 1 - 360K BTU/hour burner, 300K BTU/hour heat transfer 5 gallons of fuel/meal, 60 gallons water (sanitation) High capacity, commercial appliances, 2 hours/meal 1 footprint (integrate sanitation center w/ kitchen) Leveraging: DARPA funded Rankine cogenerator 2 – SBIRs Combined Heat & Power (Brayton and Stirling) What is the problem? The current MKT is based on ’60s technology with inefficient open-flame burners powered by a loud engine-driven generator Uncomfortable environment w/ heat stress / combustion products Limited water heating capability Low capacity appliances w/ no timers or thermostats The MKT’s 1 ½ ton trailer not compatible w/ LMTV Roll-overs because of tracking problems Over weight; Obsolete wheels Large footprint w/ Separate Food Sanitation Center What are the barriers to solving this problem? Reliable technology for cogeneration / thermal fluid heat transfer How will you overcome those barriers? Develop reliable cogeneration / thermal fluid heat transfer technology, integrate w/ high capacity commercial appliances and sanitation, and integrate on 2 ½ ton LMTV trailer What is the Warfighter Payoff?: Reduced fuel and water consumption Reduced transportation costs and footprint Reduced operating and support costs Improved Manpower utilization Improved ability to produce high quality meals Larger work area and Improved working conditions SKILLET KETTLES OVENS GRIDDLE WATER HEATER Brayton Cogenerator TURBINE GENERATOR MILESTONES 07 08 09 10 11 12 13 14 15 Concept development (6.2) Concept demonstration (6.3) CDD System development (6.4) CPD System demonstration (6.5) Procurement AIR INTAKE AFTER BURNER PUMP 6 THERMAL FLUID HEATER B M1078 LMTV M1082 2 ½ ton trailer C

Food Sanitation Center Sink Fill Pump Assembly Hot Surface Protection CO Monitor Grease Separator Fielding to be completed in 09 Improvements: Rounded sinks (COTS), lighter weight tables 2ea up from 1 Grease separator w/ pump, carbon monoxide detector/alarm, hot contact surface protection, and proper sink temperature markings. Sink Fill Pump Assembly Hot Surface Protection

FSC Enhancements Objective(s): Capability Provided: Address P3I requirements of FSC ORD: Reduce logistic footprint by reusing sanitation water prior to disposal Respond to CASCOM position paper (Jan 2004) regarding improved ventilation of combustion by-products Capability Provided: Sink exhaust system operated within a closed FSC tent that meets toxic gas levels required by American Conference of Government Industrial Hygienists (ACGIH) Means to reuse untreated rinse and sanitizing water prior to disposal

Containerized Kitchen (CK) Fielding is currently focused on modular force requirements. Current figures for 2007 is 350 fielded with an acquisition objective of 742. P3I – Pre planned Product Improvements Integrated bail bar – allows the CK to be transported by HEMTT and LHS (Heavy Expanded Mobility Tactical Truck & Load Handling System) layout changes – smaller serving line 1/3 the original size Replace grill with tilt grill Added hot water faucet heats to 150 degrees, looking at adding another that reaches 190. New production contract awarded to same manufacturer for 5 additional years. Each CK replaces 2 MKT & 1 FSC 4 cooks & 1 supervisor

Multi Temperature Refrigerator Containerized System (MTRCS) Objective: Develop a highly mobile multi-temperature partitioned refrigerated container system that provides simultaneous transport of frozen and chilled/semi-perishable rations on a single platform directly to the field kitchen site Capability Provided: Multi-temperature product storage with two custom selectable/individually controlled compartments with setpoints ranging from -5˚F/-20.6°C to 60˚F/15.6°C Operation on the move Enable both military and commercial transportation. Multi-powered operation Located directly at the field kitchen site. Eliminate the need for a forward area Ration Break Point. Adjustable temp allowing the container to be tailored to load. Consist of an insulated 8’x8’x20’ ISO container with an engine driven refrigeration unit. Keep food safe for 12 hrs without power. Holds rations to support 800 personnel for 3 days. Fielding is scheduled thru Fy 12.

Assault Kitchen (AK) Objective(s): Capability Provided: Develop a lightweight, mobile field feeding platform to support the forward deployed Warfighter Functionally replace the Kitchen, Company Level Field Feeding (KCLFF) Reduce the field feeding logistical footprint SBCT’s will be fielded first. Transported & operated on a HMMWV & Light Tactical Trailer (LTT). Operated by two cooks Set up and feeding in 15 minutes or less. Feed 250 hot meals in 90 minutes or less. Will replace KCLFF 1-1. Uses JP8 fuel. Operates on 120 V. Operates on 24 DC vehicle power using a power inverter. Does not have A ration capability. LTT carries additional rations and an ice chest. Key point Joint procurement with USMC. Capability Provided: Heat-on-the-move field feeding Near instantaneous feeding at remote site Reduced feeding site food preparation time

Assault Kitchen (AK) Benefits: Same major components as USMC TRHS/AF SPEK (SEET) Utilization of NDI and commercial components Reduction in field feeding logistical footprint Minimal manpower required for system operation System meets Joint Service Requirements FY07 Planned Accomplishments MS-C (LRIP) approval (completed) DSCP contract award for TRHS components (completed) System components purchased (completed) LRIP test items developed (ongoing) Conduct Production Verification Testing (PVT) and Log Demo Future Plans Evaluate Self Powered Tray Ration Heater Determine configuration to accommodate A-ration capability

Assault Kitchen (AK) Capability: Provides heating and serving of the UGR-H&S to company sized elements at an objective force sustainment replenishment site (SRS) or in support of current force remote site feeding. Prepares food for 250 in 90 minutes. Description: equipped with a Tray Ration Heater System. Includes insulated food and beverage containers, work tables. Transported on HMMWV and HMT or future replacement. BOI: One for one replacement of the KCLFF. 20 per SBCT; 17 per Heavy/Light BCT War fighter Criticality/Value: Operational Responsiveness Heat-on-the-Move technology Capable of supporting more than one Sustainment Replenishment Site (SRS) per day and augmentation of feeding capability at Mission Staging Site (MSS). Reduced Logprint / Resources Prepares the UGR H&S exclusively with no additional resources necessary for support. ARM 14 Nov 03 Enhanced Description: Historical Status: Leverages the USMC Tray Ration Heating System which has been in use for years. Specifically replaces the Tray Ration Heater which has proprietary technology and high costs to include repair cost with Multi-Ration Heater designed for the USAF SPEC kitchen. Future Status: ORD not required per TRADOC PAM 71-9 and HQDA G-8. due to an approved sister Service ORD. Per TRADOC Memo only require sister service ORD, O&O, OMS/MP, BOIPFD, STRAP. Funding Status: Funding received late June 03 form LIA. On contract Late July 03. $120K UFR for purchase and demonstration of the system that LA was working as a transformation enabler was disapproved. Currently $1M FY03 funds moved to other program at PM –FSS with promise of payback in FY04 once AK requirement is documented. Plan to buy 20 enough for 1 SBCT and field it. Fielding Status: FUE FY04 if we get funding. Issues/Miscellaneous Comments: Provides heat-on-the-move capability, reduces kitchen equipment thus reducing set up and pack up time. Reduces amount of cleaning required. Supports Objective Force SRS and current for remote feeding operations. ORD Validated June 03. Awaiting HQDA Approval. 3ID agreed to conduct user demo in 04. Jan – Train up and Familiarization, Mid Mar – April NTC. Status: MS C ORD Approved Mar 04; required qty 2,110; FUE 3Q FY07 Issue: Initial procurement delayed until FY07; HMMWV and LTT availability beyond SBCT’s

Visit our Website at NEED INFORMATION http://www.quartermaster.army.mil Other Links QM Schools AKO LOGNET Reimer Library USAPA

QUESTIONS