1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2014.

Slides:



Advertisements
Similar presentations
The FCCs Disaster Information Reporting System (DIRS) July 14, 2009.
Advertisements

Icahn Conversion to T. Rowe Price ITS ABOUT BEING THERE. DaVita Inc. Conversion to T. Rowe Price.
French Service Learning What is service learning? Work placement Credit bearing Integral part of a degree programme.
Counting Trees 1.How many text messages are sent if four people all send messages to each other? 2.How many text messages are sent with different numbers.
Technical Assessment Review / Decision Briefing Template
1 How Does E-Grants Streamlining Affect Me as a Grantee? Abbey Tyrna, OMB Watch National Grants Management Association Conference April 28, 2004.
Presentation Phase I of the Outage Inquiry Board of Commissioners of Public Utilities March 30, 2015.
Science Olympiad Summer Institute Phoenix, AZ July 16 – 20, 2012.
Federal Communications Commission Public Safety and Homeland Security Bureau Public Safety Communications Update “View from the FCC” David G. Simpson,
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy February 2015.
EXPERIMENTAL DESIGN Science Olympiad Summer Institute Phoenix, AZ July 18 – 22, 2011.
An approach to teaching it. Jacqueline is purchasing her first car and feels torn as she balances conflicting desires and messages. She yearns to be seated.
Accident Investigation State of Florida Loss Prevention Program.
DR NIRANJAN P DR K LAKSHMAN DR M S SRIDHAR AUDIT ON DISCHARGE SUMMARIES.
ARINC PROPRIETARY Long Range Satellite Communications Prepared for SOCM/2 February 8 -10, 2012.
Network Reliability Steering Committee (NRSC) Overview and NRSC CAMA Trunk Throughput Optimization Analysis Stacy Hartman – CenturyLink Robin Howard.
Navigation Icahn Conversion to T. Rowe Price IT’S ABOUT BEING THERE. Icahn Conversion to T. Rowe Price.
Web-centric BusinessNRIC V – February 27, 2001 NRIC V Council Meeting - February 27, 2001 Focus Group 2.B1 Network Reliability - Data Reporting & Analysis.
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy September 2014.
Working Group 8 – E9-1-1 Best Practices March 6, 2013 Robin Howard Chair WG 8 – E9-1-1 Best Practices.
Maintenance of Elements. © Copyright 2008 Ontario Safety Association for Community & Healthcare. All rights reserved/tous droits réservés. Reproduction.
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy May 2015.
IAEC Reliability Webinar Presented by: Regi Goodale and Ethan Hohenadel December 11,
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
1.  An event study is designed to examine market reactions to, and abnormal returns around specific information-imparting events.  These events can.
1.  An event study is designed to examine market reactions to, and abnormal returns around specific information-imparting events.  These events can.
North American Network Operations Group (NANOG) October 23, 2000 Washington, DC PJ Aduskevicz AT&T.
Working Group 8 – E9-1-1 Best Practices June 6, 2012 Robin Howard Chair WG 8 – E9-1-1 Best Practices.
14 April 1999 NRIC IV Agenda: 14 April 1999  Introductions  Opening comments  Frank Ianna -- President, AT&T Network Services  Michael Powell -- FCC.
Retail Market Messaging Incident Report 1. Agenda Recap of integrated market messaging system Incident Overview Current Status Incident Observations Next.
Working Group 8 – E9-1-1 Best Practices September 23, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
JOHN DOE PERIOD 8. AT LEAST 80% OF HUMANITY LIVES ON LESS THAN $10 A DAY.
TDTWG Update to RMS Wednesday January 14. TDTWG Update to RMS Scope Texas Data Transport Working Group (TDTWG) is responsible for creating and maintaining.
Working Group 8 – E9-1-1 Best Practices December 16, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
Network Reliability and Interoperability Council VII NRIC Council Meeting Focus Group 1C Analysis of Effectiveness of Best Practices Aimed at E911 and.
1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2015.
ACT476 CAPSTONE WRITING AN USER MANUAL. Developers VS Users Developers want to write code Have little time to document or write user’s manuals Users on.
Legal Jeopardy: Whose Risk Is It?. SPEAKERS Jason Straight Chief Privacy Officer and Senior Vice President Cyber Risk Solutions at UnitedLex Patrick Manzo.
Network Reliability and Interoperability Council Focus Group 3 April 14, 1999 Ray Albers- Bell Atlantic Focus Group III Chair.
Atlantic Coast Operations Business Intelligence Mobility Project Patrick Gormley, Blake Hamilton Brad MacEachen, Ryan Searle.
Web-centric BusinessNRIC V – June 26, 2001 NRIC V Council Meeting - June 26, 2001 Focus Group 2.B1 Network Reliability - Data Reporting & Analysis.
Science Experiment by Name or Names Question: How does _____ affect _______?
ETSI TC ESI PRESENTATION TO CAB FORUM Iñigo Barreira /Arno FiedlerFebruary 2016 meeting, Scottsdale, AZ © ETSI All rights reserved.
Wholesale Local Service - Planned Outages November 2014.
IFTA BALLOT #3 Overview of changes. Overview of Changes The new Language in Ballot #3 introduces 5 new requirements and defines “should” as a conditional.
Atlantic Coast Operations Business Intelligence Mobility Project.
Analysis of Network Outage Reports
Analysis of Network Outage Reports
The Process of Call based Project Funding by BMBF
Long Range Satellite Communications
Flooding Walkdown Guidance
Analysis of Network Outage Reports
Research Participant Satisfaction
IVG Driver Training Critical Event Reporting.
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Incidence of Legionnaires’ disease by county, January 1, 2010–December 31, 2017 Showing counties that had at least one case per year (on average) during.
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Presentation Title SUBTITLE description LOGO.
Emergency & Event Communications Linda Collins, Mutare Software
Analysis of Network Outage Reports
ANALYSIS PATIENT SAFETY REPORT Pharmacy name Month / Year
Atlantic Coast Operations
Request for Legacy IE ID for RSN Extension
Presentation transcript:

1 Cybersecurity and Communications Reliability Division – Public Safety & Homeland Security Bureau John Healy December 2014

2

 Took average of January 2011 through December 2011 as the standard 3

4 See ATIS Analysis of FCC-Reportable Service Outage Data for a description of the method used to calculate the outage index.

5 Procedural events are ones which have a procedural root cause.  Many of these events are related to Planned Maintenance.  The NRSC agreed to set up a team to review planned maintenance outages.  In June we sent data on these events from the NRSC companies.

6

7

The NRSC agreed to set up a team to review these events with a report by December,

9

10

11

12

13

14 Wireline outages are all outages for which the Reason Reportable was at least 900,000 wireline user-minutes.

15

16

17

18

19

20

21

22

23

24

25

26

27 Non-DS3-Simplex Outages Data from 1/12 thru 9/14 Conclusion: Non DS3- Simplex Outages are unchanged in duration from 1/12 to 9/14 DS3-Simplex Events Only Data from 1/12 thru 9/14 Conclusion: DS3-Simplex Events are unchanged in duration from 1/12 to 9/14 Rank Correlation of duration with date is and is not significant Rank Correlation of duration with date is.011 and is not significant

 Changes to NORS/DIRS: Added ability to send text messages when DIRS is activated. Comments and suggestions are greatly appreciated 28

Current Teams  Best Practices Team  Outage Reporting Advisory Team  Improvements to the NORS System  Improvements to the template  Recommended ways to communicate information  Improvements to NORS/DIRS manuals  Fiber Cut Team  IP Transition Team  Planned Maintenance Team: Examine planned maintenance events; recommend ways to upgrade the system without affecting service 29