Plans for Diagnostic Removals, Storage, and Re-installations during NSTX Upgrade Outage B. Stratton NSTX Team Meeting 9/13/2011.

Slides:



Advertisements
Similar presentations
Cisco 6500 E-Series Chassis Up-grade
Advertisements

East Carolina University Compressed Gas Safety Training Program
What to look for, What to correct, How it should look,
CLOW WATER Contractor Orientation April
HSE TRAINING LADDER SAFETY January TMD-8303-SA LADDER SAFETY Whereas all other categories of occupational injury / illness and fatality statistics.
Contractor Safety Training] Contractor Safety Training What's New – What's Hot.
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
Crane & Hoist Training & Inspection Requirements Crane Safety.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
May 4, 2004Bill Wisniewski1 Installation Review. May 4, 2004Bill Wisniewski2 Charge ( W. Althouse, G. Bowden, W. Innes(chair), J.Weisend, (D. Nelson))
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
Lockout Tagout Tryout (LOTO). The purpose of the Lockout Tagout Program is to protect you. Rain for Rent incidents include employees being sprayed with.
NFPA-12 Edition 2005 What “IMPACT” will the changes to NFPA-12 have on the design and installation of a CO 2 system?
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
3nd Quarter Contractor Business Meeting September 14, 2012 Mike Kehoe Plant Engineering Facilities Session.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
Machine Advisory Committee Review APS Upgrade Installation Plan and Schedule John Noonan November 15, 2006.
June 25-26, 2002D&D Lessons Learned Workshop1 Overview of the TFTR D&D Project Erik D. Perry D&D Lessons Learned Workshop June 25-26, 2002 PPPL.
Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Work Control Center Thomas Meighan D&D Lessons Learned Workshop June 25-26, 2002 PPPL.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
MNM Fatal Fall of Person Accident Fall of Person Accident April 14, 2009 (Missouri) April 14, 2009 (Missouri) Cement Operation Cement Operation.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
February NSTX-U Team Meeting. Engineering Operations Feb. 11, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in late March (3/28/2014)
MNM Fatal Falling Material Accident Falling Material Accident April 4, 2013 (Arizona) April 4, 2013 (Arizona) Copper Operation Copper Operation.
Overview of TFTR D&D Hazards Jerry Levine Head, Environment, Safety & Health.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 NSTX Upgrade Progress Report May 7 th, 2013 Ron Strykowsky, Erik Perry, Tim Stevenson, Larry Dudek, Steve Langish, Tom Egebo, Mike Williams and the NSTXU.
April NSTX-U Team Meeting. Engineering Operations April 25, 2014 NSTX-U In-Vessel installations and Calibrations to conclude in mid-June to shift activities.
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Work Control Center Overview. 2 Purpose of Work Control Center Allow engineering to concentrate on developing procedures and technologies Allow field.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
DISASTER RESPONSE GUIDELINES ACTION TO TAKE IF THERE IS A COLLECTION or BUILDING DISASTER.
SC Project Review of NCSX, April 8-10, 2008 Plant Design Integration, General Arrangement Drawings E. D. Perry.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
WG1 Decommissioning Kickoff Workshop WG1 Decommissioning Kickoff Workshop Long term Storage & ID tooling management R. Vuillermet on behalf of TC team.
Installation of the T600 at Fermilab CSN2, September 22,
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
2016 Contractor Safety Training What's New – What's Hot.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Operations meeting on FY07 Shutdown Date: June 27, W.B. Christie Outline Brief Overview of Shutdown Plan Details/discussion of next few weeks Comments.
Most frequently cited OSHA standards during FY 2016 inspections
2014 Contractor Safety Training What's New – What's Hot
Chapter 9 Safety Permit Systems
Most frequently cited OSHA standards during FY 2016 inspections
Records Management Compliance Training
East Carolina University Compressed Gas Safety Training Program
ESB Networks Market Release Meeting of the IGG, 1st October 2009
Most frequently cited OSHA standards during FY 2016 inspections
Electron Beam Systems ETC and Methodology
SAFETY STANDARDS FINAL JEOPARDY
IMPLEMENTATION ,EVALUATION AND MAINTENANCE OF MIS
Polarized 3He target installation
Anhydrous Ammonia Accident
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

Plans for Diagnostic Removals, Storage, and Re-installations during NSTX Upgrade Outage B. Stratton NSTX Team Meeting 9/13/2011

Summary of the Plan See Erik Perry’s presentation at Upgrade FDR for overview of Test Cell activities during outage. Erik will be the manager of the construction activities in the TC. Joe Winston will coordinate and be responsible for for diagnostic removals and re-installations with help from Lane Roquemore. Diagnostic removals will be performed by the diagnostic technicians, machine technicians, and physicists (as needed). Near-term plan: complete MSE-LIF commissioning, MPTS testing, etc. TC will be open for general access until Oct. 14. Until Oct. 14: Document diagnostic installations with photographs and labeling of diagnostic hardware on and near the machine. Some diagnostics can be removed. 2

The vacuum vessel will be vented about Sept. 19. No vessel entry until well into the outage. On Oct. 17: the power to the TC will be disconnected and temporary power to be used during construction will be connected (outlets and lighting). After Oct. 17: only construction personnel with the required safety training will be permitted in the TC on a routine basis. Personnel accessing the TC will be briefed on hazards each morning. Non-construction personnel will be permitted access into the TC for specific tasks by pre-arrangement with Erik Perry or Joe Winston. Entry into the test cell will require a written procedure for the work to be done and the procedure will need to be reviewed and approved by the Work Control Center (WCC). The WCC will schedule when the work can occur. 3

Ist month of the outage: (starting mid-October), the cable tray at the top of the machine will be removed, RF piping within 10 feet of the vacuum vessel will be removed, the new 118 foot elevation platform on the west side of the machine will be installed, and removal of racks that will be moved will start. Diagnostics on the top and bottom of the machine will be removed. 2 nd and 3 rd months: rack removals will continue, diagnostic hardware will be removed from Bays J, K, and L. Cables, tubing and optical fibers will be coiled up as far back as needed to provide space for construction work and to ensure that they are well protected. This will be the case everywhere around the machine. Cable and fiber ends will be protected by enclosures to prevent damage. 4

Diagnostic removals will then proceed to other areas of the machine. Later in the outage, diagnostic re-installations will take place as construction work is completed in specific areas of the machine. Diagnostic removals will be done according to procedures that will be written for each area of the machine. Joe Winston will coordinate the execution of the procedures. A generic removal procedure will be used if a specific procedure has not been provided. Diagnostic hardware will be stored in the Upper and Lower DARMs. Specially-built crates will be used to protect the hardware and to keep items that belong to each diagnostic together. Large items can be stored in the TFTR basement. 5

Near-Term Plan Lane Roquemore is organizing the effort to document the existing diagnostic installations with photographs and labels. This will be done by Tom Holoman, Doug LaBrie, and Gus Smalley. Doug will be the point of contact for this work while Lane is on vacation until Oct. 3. Doug will be contacting you to get detailed information about your systems. Please work with him to provide the needed information. Please contact Doug directly if you would like to remove something from the machine in the near future. If you have questions about this process, please contact Brent Stratton or Erik Perry. 6