Working with AMI Data Eric Jung SouthEastern Illinois Electric Cooperative.

Slides:



Advertisements
Similar presentations
Modeling Cold Load Pickup Eric Jung. Agenda Traditional methods of analysis Un-diversified load allocation Emergency capacity determinations Voltage drop.
Advertisements

Determining and Forecasting Load Reductions from Demand Side Programs September 11-12, 2007 Presented by: Bill Bland, V.P. Consulting, GoodCents Liza Thompson,
Prioritized Scheduling and Managing of All Utility Work Utility Characteristics Historical Concerns Improvement Goals Process Teams Implementation of.
Digital Current Transformer Reporter
Consumer Easy Access Sales Environment (CEASE) For Competitive Local Exchange Carriers.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Optimizing Spring Enrollment for the 4483 Enrollment and Completion Collection Report Presented by PTD Technology 3001 Coolidge Road Suite 403 East Lansing,
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
STAMI (ST Advanced Metering Interface) Web Tool for the advanced management of LV Network Trends in Power Industry in the European Context VIII Antonello.
Troubleshooting Training Course.  Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical.
Electrical Systems.  This section discusses: –How utilities charge for electricity –How to calculate the avoided cost of electricity –How to use utility.
Make the most of your energy Looking for accurate electric energy metering and simple, easy installation? PowerLogic ® Energy Meter December 2008 Energy.
3/5/2009Computer systems1 Analyzing System Using Data Dictionaries Computer System: 1. Data Dictionary 2. Data Dictionary Categories 3. Creating Data Dictionary.
Simple, accurate tenant sub-metering
Guide to Oracle10G1 Introduction To Forms Builder Chapter 5.
A Guide to Oracle9i1 Introduction To Forms Builder Chapter 5.
Sampling Methods and Sampling Distributions Chapter.
Week 2 Normalization and Queries
LSP 121 Week 2 Normalization and Queries. Normalization The Old Car Club database presented a problem – what if one person owns multiple cars? (One owner.
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
Garmin GPS III Plus Data Collection. Objectives Collect: - Waypoints -Average Position Waypoints -Reference Waypoints - Multiple Tracks in One Track Log.
Access 2007 ® Use Databases How can Access help you to find and use information?
DCSI – NISC MultiSpeak Integration at Pioneer Electric Cooperative MultiSpeak User’s Conference 2007 Presented by: John Hickman.
Electric Load Estimating 2011 SWEDE Conference. Customer’s Connected Load & Electric Utility’s Demand Load Customers provide the utility company with.
1 Quality Control Review of E3 Calculator Inputs Comparison to DEER Database Brian Horii Energy and Environmental Economics, Inc. November 16, 2006.
ANSI 5010 Deidre Lawson Fryfogle- Product Manager.
Expert Group Meeting on Price Statistics and National Accounts: ICP Round 2011 Jointly organized by: UN-ECLAC, CARICOM, CARTAC and ECCB 3rd-6th December.
September 5, 2015 Office Setup. Lesson Overview: Office Setup  In this lesson we will cover:  Adding new offices to COM  Individual office setup 
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
2009 Year End Close Webinar by: Kris Sundberg Please questions to Presentation will be posted on our blog at
TxEIS First Day, Daily, and Cycle Procedures
OMS and AMR MultiSpeak Interface at San Bernard Electric Coop Presented by: Doug Lambert.
Microsoft Office 2003: Advanced 1 ADVANCED MICROSOFT ACCESS Lesson 17 – Utilizing Advanced Management Tools.
August 01, 2008 Performance Modeling John Meisenbacher, MasterCard Worldwide.
1 American Public Power Association Session 6 (PMA) September 24, 2007 Uses, Costs, and Implementation of AMR/AMI Herman Millican Austin Energy.
EMIS-R Data Collector Uncovered Teresa Williams NWOCA/SSDT OAEP
Circuit Master Circuit Master™ uses three PROVEN technologies* – Capacitor (reduces DEMAND) – Harmonic Filter (harmful frequencies) – Surge Protection.
Advanced Metering Infrastructure (AMI) Project Update Mark Heintzelman June 2010.
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 3 1 Software Size Estimation I Material adapted from: Disciplined.
Smart Grid Workforce Education Presentation Smart Grid – A Framework for Change Brad Gaskill, CEO - Poudre Valley REA May 29, 2009.
Maintenance Workload Forecasting
Electric / Gas / Water Information collection, analysis and application Knowledge to Shape Your Future 1 Meter Verification Research Approach –Identify.
Talha Mehmood Chapter # 5 TARIFF. Introduction The electrical energy produced by a power station is delivered to a large number of consumers. The supply.
Assoc. Prof. Dr. Ahmet Turan ÖZCERİT.  System and Software  System Engineering  Software Engineering  Software Engineering Standards  Software Development.
CIS 250 Advanced Computer Applications Database Management Systems.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
TROI – SPC Database Walkthrough Training Presentation Doc. USTP0213 Rev4.
ECE498HZ: Power Distribution System Analysis
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
1 1 DISTRIBUTION EFFICIENCY INITIATIVE (DEI) Benefits on Both Sides of the Meter RTF MEETING February 5, 2008.
SUBJECT : POWER DISTRIBUTION AND UTILIZATION (PRESENTATION) INSTRUCTOR:KASHIF MEHMOOD.
Basic Navigation in Oracle R12 BY: Muhammad Irfan.
Thayer J. Hendrickson.  Demand-Side Management is the idea of strategically controlling the customer’s electrical loads in order to reduce its maximum.
© 2012 Autodesk Support Your Design Process with the AutoCAD Map3D Interface to WindMil Using MultiSpeak Frank Misurec Stephen Brockwell Brockwell IT Consulting.
If you have a transaction processing system, John Meisenbacher
Lesson 7: Power and Energy Measurement
Power Generation and Distribution
Beyond the Business Case: AMR Operational Experiences and Benefits
Advanced Fuse-Saving Techniques
Reactance Reactance In Phase + _ + + _ _ Voltage Current Voltage
Tools and Techniques to Clean Up your Database
Financial Energy Management System (FEMS) Re-engineered by IT Department IT, H.O. Mumbai. 26 November 2018.
Software Metrics “How do we measure the software?”
Sr. Lecturer in Electrical Engg. Govt. Polytechnic,Manesar
COCOMO Models.
Behavior Modification Report with Peak Reduction Component
Closing the Month in SAGE 300 CRE
Michael DuBrey-Lefler Debra Clayter
Customized gis applications for Electric DISTRIBUTION Utilities
Simple, accurate tenant sub-metering
Presentation transcript:

Working with AMI Data Eric Jung SouthEastern Illinois Electric Cooperative

Load Modeling  Hourly data advantages  Accuracy! (less than 5% variance)  Fast load allocation  Hourly data disadvantages  File verification & estimation difficult and time consuming  Must mix with traditional load allocation if AMI not 100% deployed

File Setup  Interval files  Desired intervalDi  Desired interval -1Di-1  Desired interval +1Di+1  Desired interval, different day (similar load characteristics)  Desired interval, different day 2  Repeat until all meters have a reading

File Setup Continued  Outage file (fast ping) for desired day  CIS data  Multiplier  Billing rate (optional)  Reactive load  Matching field to outage table  Location number link to Premise ID

Validation  Pulse count to KW multiplier: (≠ Kh)  Verify meter type, multiplier and module match Multiplier = (Kw * 1000) / Pulse count

Estimation  If valid read from desired interval (Di) use it directly  If not use Di-1 or Di+1  If all three invalid use same interval from different day  Repeat until valid reads for all meters

Reading Modification  Sum total load by interval  Apply adjustment factor by percentage difference between intervals.  Ie. Di-1 total load is 5% < Di. Divide all Di- 1 reads by 95%  Suggest applying adjustment factors by billing rate.

Additional Load Info  Take phasing from Outage file on single phase meters  Three phase loads must come from another source:  CIS  Mapping  Reactive load must come from CIS

Outage Data Location # Meter # Module # Phase Substation Master Table Location # Meter # Module # Phase Substation Multiplier Load Interval 1 Load Interval 2 KVAR Interval Data 1 Module # Meter # Meter Type Pulse Count Kw (converted pulse) Table links - Blue Data source - Green CIS Data Location # PF% Multiplier

Load Application for 100% AMI  One load group  Set sources to swing  Set CF% to 100%  PF % only applies to those without KVAR  Apply load and save errors!

Load Application for < 100% AMI  All AMI data in one load group  Settings for this load group will be as for 100% AMI  Remainder will be as traditional  Run load allocation and save errors!

Phasing Correction  Match load file phasing with error file from load application  Use “re-phase elements in file” updateable utility to phase according to load file  Re-run load application and view errors  Errors will be connectivity errors

Accuracy  Absolute: 3.3% (average deviation)  Individual phase variation >10A indicates phasing or loading errors.  Normal < 5 A error per phase at feeder level

Two Feeder Examples  Johnston City NW (average feeder)  Shell East (very accurate) ModeledActual% Diff KW % KVAR % A Amps % B Amps % C Amps % ModeledActual% Diff KW % KVAR A Amps % B Amps % C Amps %

Lessons learned  Check large industrial loads  If load down during peak, consider adjusting to realistic level for analysis  Trust the Twacs phasing, but check for phase rolls in software  Scrutinize the pulse count multipliers!  There will be errors!

Blink File Import  Setup blink file using AMI momentary outage data  Suggest weekly or monthly intervals  Use “apply reliability indexes” utility  Element name,saidi,saifi,caidi…  Element name,blink week 1,blink week 2…

Blink Analysis  Set “color by custom”  Graphical indication of blinking line sections

Blink Analysis Example

Single Outage File Import  Similar to blink file import  Leave only location and on/off status in file  Convert outage status into 1 (on) or 0 (off)  Save as CSV and load as “reliability.txt”  Provides a snapshot of system status

Multiple Outage File Import  Link several outage files together based on location  Create one master database with several on/off entries (maximum of 6)  i.e. Element name,2pm result, 4pm result…  Provides progress view of system restoration

Outage Analysis  Single outage file:  Color by custom based on phase  Highlights line section outages  Multiple outage file  Color by custom based on status change

Conclusions  AMI data can bring load model accuracy to the next level  Apply reliability indexes utility is an extremely flexible tool  AMI data is not likely to save time on load allocation

Contact Info  Eric Jung  Engineering and Purchasing Manager  SouthEastern Illinois Electric Cooperative 