Keith D. Hodsden, Sr., P.E. Client Service Manager GIS & Hydraulic Modeling for Water / Sewer Asset Management and Rehabilitation Planning SAME 2012 SA/SC.

Slides:



Advertisements
Similar presentations
NONREVENUE WATER - Current and Future Remedies Gary Harstead Director – Asset Management United Water NARUC Winter Meeting February 2013.
Advertisements

1 GIS for Water Maximizing the Benefits of GIS Susan Ancel - Director Water Distribution and Transmission EPCOR Water Services Inc. Geospatial World Forum.
ENHANCING LEVEL OF SERVICE THROUGH RISK-BASED ASSET MANAGEMENT Greg Norby, P.E. General Manager Vivian Housen, P.E. Principal, VWHA Northern California.
Free software costs money
Lessons Learned from the Application of Risk Management in the Shipment of LNG.
PROJECT RISK MANAGEMENT
TK3333 Software Management Topic 7: Schedule Control.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Integrated Analysis of Transportation Network with Pipeline System Vulnerabilities Berrin Tansel 1, Xia Jin 1, Kollol Shams 1, Bahareh Inanloo 1, Albert.
Chapter 14 Schedule Risk Management Dr. Ayham Jaaron Second Semester 2010/2011.
Chapter 13 Managing Computer and Data Resources. Introduction A disciplined, systematic approach is needed for management success Problem Management,
UK WIR The UK Experience Christopher Royce Anglian Water Services.
Overview of Key Rule Features
Considering Tax-Supported Debt May 10, 2004 Presentation to City Council Roger Rosychuk Corporate Services Department.
IEOR 180 Senior Project Toni Geralde Mona Gohil Nicolas Gomez Lily Surya Patrick Tam Optimizing Electricity Procurement for the City of Palo Alto.
Infrastructure Investment Management Mike Morrisroe Business Area Manager Water Networks.
CE HYDRAULICS ENGINEERING
Coliform Event Recommendations and Best Management Practices Sammamish Plateau Water and Sewer District Workshop December 9th, 2014 Sammamish Plateau Water.
8 Managing Risk Teaching Strategies
Risk-Based Inspection Program Best Practice – Executive Summary
Hydraulic Modeling of Water Distribution Systems
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
1 August 12, 2014 Surety Risk Assessment Utility Pipeline Failure Case History – Tyndall, SD Presented by: American Concrete Pipe Association Scott Hofer.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
US Army Corps of Engineers BUILDING STRONG ® Consequence Assessment for Dam Failure Simulations Kurt Buchanan, CFM Economist Mapping, Modeling, and Consequences.
Pavement Preservation Protecting the Investment and the Environment R. Gary Hicks CP2 Center, Chico, CA Prepared for CEAC 2014 Conference March 26-28,
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
Complex Network Analysis of the Washoe County Water Distribution System Presentation By: Eric Klukovich Date: 11/13/2014.
The View from Wall Street: A Capital Markets Perspective Debra G. Coy Svanda & Coy Consulting 2010 Mid-America.
Lecture 1 Water Distribution Systems
Corporate Social Responsibility LECTURE 19: Corporate Social Responsibility MGT
Environmental Health and Safety (EH&S) Supplier Awareness Training ISR Systems Danbury, CT 2011.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
An-Najah National University Civil Engineering Department Analysis of the Water Distribution Network of howara- Nablus Submitted by: Rami Ahmad Mohammed.
3M Water Infrastructure Space for 3M Montage © 3M All Rights Reserved. 3M Water Infrastructure General Overview Mayors Water Council Meeting 2009.
Best for the Buck: Using Asset Management for Project Design at Highline Water District Matthew J. Maring, P.E. April 30, 2008.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Network Appurtenances Major operations within a water transport and distribution systems are: 1. Transmission. 2. Storage. 3. Pumping.
Asset Management: What It Means For Water Distribution Operability & Criticality December 09, 2008 Paul Schumi Wachs Utility Services.
ICDA of Gas Transmission, Gathering & Storage Systems GOAL: Develop a protocol for Validation of dry gas ICDA method: –Identify data needs –Develop procedures.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Sizing Variable Flow Piping – An Opportunity for Reducing Energy
Risk-based Asset Management for Networks
The Smart Network: NRW, Pressure and Asset Management
Implementing an Adaptive Capital Improvement Program
NC AWWA-WEA 95th Annual Conference
Components of Water Networks Eng. Mona Al-Gharbawi Eng. Ayman Al-Afifi
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Kevin Colvett, P.E. Nashville Corrective Action Plan and Engineering Report, Phase III for Metro Water Services and the City of Brentwood, TN Presentation.
Nick Fish, Commissioner | Michael Stuhr, P.E., Director Portland Water Bureau May 3, 2016 Briefing for the Portland Utility Board Asset Management at the.
What is the Cost of Lost Water? AWWA / RCAP Small Systems Operator Training Columbus, Ohio May 24, 2016 AWWA / RCAP Small Systems Operator Training us,
Ashima Wadhwa.  Probably the most time-consuming project management activity.  Continuous activity from initial concept through to system delivery.
Road Investment Decision Framework
Asset Degradation Modelling at Townsville Water
Workshop developed by RCAP/AWWA and funded by the USEPA
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Ensuring Value for Money Asset Management Project at American Samoa Power Authority By William Spitzenberg (ASPA) and Richard Taylor (Thomas Civil.
Project Management for Software Engineers (Summer 2017)
RISK ASSESSMENT TOOL PREVIEW
Our Valuable Water Infrastructure – Challenges of the 21st Century
Environmental Health and Safety (EH&S) Supplier Awareness Training
Gull lake sewer + water authority
Capital Improvements Planning
Southwest Section AWWA 2018 – Baton Rouge, LA
1. 2 Operational Efficiency and Business process Performance Operational Efficiency and Business process Performance Just in Time Systems (J I T) Reductions.
Presentation transcript:

Keith D. Hodsden, Sr., P.E. Client Service Manager GIS & Hydraulic Modeling for Water / Sewer Asset Management and Rehabilitation Planning SAME 2012 SA/SC Joint Engineer Training Symposium October 2-4, 2012

 Subsidiary of MWH Global  MWH Soft / Wallingford Software Merger  Company Renamed in March 2011  Same Market Leading Products, Services, Support  Corporate HQ: Denver, CO  Operations HQ: Pasadena, CA  Global offices with local focus  US Offices in Every Time Zone  Experienced software support Innovyze Oveview

US Infrastructure Situation  Aging Infrastructure  Infrastructure design life is 50 to 80 yrs  Out of sight = out of mind  EPA: $170 to 493 Billion in next 20 years*  Congressional Budget Office: $245 to $424 Billion*  Water Infrastructure Network: $420 Billion*  Limited funds = need to prioritize  Military bases arguably worse  “Ostrich” Consideration * EPA 816-R Drinking Water Infrastructure Needs Survey & Assessment – 3 rd Report to Congress, June 2005

Current Situation*  2009 – WSSC had 1,847 water breaks 611 breaks in January breaks in January 2009  240,000 water main breaks/year in USA  Large utility breaks in the Midwest increased from 250/yr to 2,200/yr over 19 years  Baltimore, MD had 1,190 main breaks in 2003 more than 3 per daymore than 3 per day  British study in 2005 correlated diarrhea with low water pressure events (including main breaks)  USGS estimates 1.7 trillion gallons of water lost in the US per year, at a cost of $2.6 Billion * EPA Aging Water Infrastructure Research Program: EPA/600/F-07/015, September, 2007

Historical Infrastructure Needs

Sample Deterioration Curve Pipes do not deteriorate at a constant rate Variables: Material Soil condition Wrapping/Lining External Loading Excavation Activity Corrosion Protection Pipe Depth Pipe Pressure …

What Has Been Done?  Engineering firms develop one-off, proprietary solutions (excel, access, GIS, etc.)  Difficult for clients to use / limited training  No upgrade path  No $$ vehicle for updates  Original author(s) may leave, be promoted, or otherwise unavailable

Asset and Data Management

Asset Management & Rehabilitation Planning

CapPlan Water Overview  Risk-based capital planning tool for water distribution systems  Incorporates hydraulic model, GIS, CMMS data in one platform for analysis  Allows for proactive capital plans  Builds an asset management model

Risk-Based Planning Represents a New Focus for Most Utilities Historical Approach to Renewal Planning Budget Based on Last Year Little knowledge of system risks Backward Looking Projects determined as problems arise during the year Reactive Do as many projects as you can afford each year Budget Constrained Money is spent but overall risk may not have been reduced much Ignores asset and system risks Risk-Based Renewal Planning Based on asset risk scores throughout system and long term forecasts of risk and cost Forward Looking High risk assets slotted for renewal before failure occurs Proactive Budget could be determined based on agreed risk targets for system Risk or Budget Constrained High risk assets addressed first Budget may rise or fall to meet risk targets Focused on risk management

Likelihood of Failure Consequence of Failure Rehabilitation Engine Budget Scenarios Rehabilitation Costs Prioritized Capital Plan Calculation of Risk Multiple Calculation Options CapPlan Work Flow Diagram

Likelihood of Failure W 1 L 1 P1 +W 2 L 2 P2 +…+W m L m Pm Hydraulic Condition (Pressure, Flow, & Velocity) Infrastructure/Asset Data (Age, Material, Dia.) Soil Characteristics Seismic Faults Railroad Intersection Traffic Defect History Joint Type Others

Consequence of Failure W 1 C 1 P1 +W 2 C 2 P2 +…+W m C m Pm Flow (Demand) Supplied Population Density Served Critical Facilities Served Outage/Isolation Analysis Traffic Others

Outage/Isolation Analysis  Evaluate each pipe

Outage/Isolation Analysis  Evaluate each pipe  ID u/s pipes/valves

Outage/Isolation Analysis  Evaluate each pipe  ID u/s pipes/valves  ID d/s pipes/valves

Outage/Isolation Analysis  Evaluate each pipe  ID u/s valves  ID d/s valves  Remove elements

No Water Pressure Low Water Pressure Outage/Isolation Analysis  Evaluate each pipe  ID u/s valves  ID d/s valves  Remove elements  Find pressure problems

Outage/Isolation Analysis  Evaluate each pipe  ID u/s valves  ID d/s valves  Remove elements  Find pressure problems  Evaluate fire flow

Flexible Risk Classification

Calculate Risk Risk Rating = Likelihood x Consequence Renewal Condition Score (Probability of Failure) 1 Neg 2 Low 3 Med 4 High 5 Extreme Consequence of Failure Score (criticality) C = 1 Low Impact B = 2 Medium Impact A = 3 High Impact Linear (Likelihood X Consequence) Bi-directional matrix Multi-criterion classification Likelihood X Consequence is normalized between 0 and 1. For each consequence definition, lower and upper boundaries can be set to define Low, Medium and High risk.

Each Asset Mapped to Risk Matrix

Define Rehabilitation Costs Define Rehabilitation Actions Establish Phasing & Budget View Reports or Maps Rehab Costing and Phasing

Energy Optimization & Sustainability

Energy Management Calculating/Projecting Pump Energy Use Determine total pumping costs based on actual energy cost charges Calculate energy cost for operating pumps under various demand conditions

Pump Scheduler Optimal Pump Scheduling Optimize pump scheduling to minimize energy cost Set constraints for system pressure, tank level, pipe velocity, water age, etc

Sustainability Reduce Power Costs & Carbon Footprint Quickly determine carbon footprint and total energy losses across entire water system Visualize specific pipes, pumps, valves, and taps with the highest carbon footprint

Questions… Keith Hodsden (802)