Avoiding Plant Operating Errors AT&T NP&E April 10, 2012 © 2012 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks.

Slides:



Advertisements
Similar presentations
Key Concepts for Senior Corps. Session Objectives Provide an opportunity for participants to network in program specific group Discuss key fiscal and.
Advertisements

Course Material Overview of Process Safety Compliance with Standards
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
More CMM Part Two : Details.
1 State of Michigan Achieving Software Process Improvement with Capability Maturity Model (CMM)
Benefits of an Environmental Management System Andrew Frisbie Wabash National Corporation.
Responsible CarE® Process Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
© 2011 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. AT&T Proprietary (Internal.
ISO 9001 : 2000.
1 Continuity Planning for transportation agencies.
Welcome to the DrivenBI/AT&T Webinar: Revolution in Cloud-Based Analytics The webinar will begin shortly.
ProCognis SOX 404 & COSO Implementation Presentation
1.1 Dr. Honghui Deng Associate Professor MIS Department UNLV MIS 746 IS Project Management.
Version 6.0 Approved by HIPAA Implementation Team April 14, HIPAA Learning Module The following is an educational Powerpoint presentation on the.
SAM for Mobile Device Management Presenter Name. of employees spend at least some portion of their time working outside their office. Mobility is the.
Purpose of the Standards
Systemise your compliance management Peter Scott Consulting
Change Management Chris Colomb Trish Fullmer Jordan Bloodworth Veronica Beichner.
© 2012 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
© 2010 Plexent – All rights reserved. 1 Change –The addition, modification or removal of approved, supported or baselined CIs Request for Change –Record.
Lesson 8-Information Security Process. Overview Introducing information security process. Conducting an assessment. Developing a policy. Implementing.
International Business and Technology Consultants AMS confidential & proprietary SPS Help Desk Presentation Army User’s Conference June 2002.
©2013, Cognizant Cognizant’s Validated e-Signature Solution.
Server Virtualization: Navy Network Operations Centers
Emergency Procedures at the Workplace Practicum in Human Services.
Software Quality Assurance Activities
Principles of Business, Marketing and Finance
Principles of Business, Marketing, and Finance Production, Distribution, and Other Business Operations Copyright © Texas Education Agency, All rights.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Internal Control in a Financial Statement Audit
AT&T Enhanced WebRTC API Beta © 2015 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are.
Service Transition & Planning Service Validation & Testing
Health and Safety Policy
ISO17799 Maturity. Confidentiality Confidentiality relates to the protection of sensitive data from unauthorized use and distribution. Examples include:
Strategic Human Resource Management Copyright © Texas Education Agency, All rights reserved.
Title: Service Management at ChoicePoint Session #: 33 Speakers: Krissi Rouquie & Frederieke Winkler Prins Companies: ChoicePoint & Service Management.
© 2011 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. AT&T Proprietary (Internal.
How to audit the role of the vendor in the conduct of outsourced studies Kristel Van de Voorde Director Global Quality Regulatory Compliance Bristol-Myers.
a guidance to conversion
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 6-1 Chapter Six Internal Control in a Financial Statement Audit.
Business Management. 2 “Copyright and Terms of Service Copyright © Texas Education Agency. The materials found on this website are copyrighted © and trademarked.
Click to edit Master title style Click to edit Master text styles Second level TOOLBOX TALK MANAGING AIRSIDE SAFETY.
©2007 · Georges Merx and Ronald J. NormanSlide 1 Chapter 9 Software Quality Assurance.
Development of a Clean Room/Highly Restricted Zone June 12, 2012 Thomas Garrubba - CVS Caremark; Manager, Technical Assessments Group ©2011 The Shared.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, AT&T logo and all other marks contained herein are trademarks of AT&T Intellectual Property.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Operational and Postimplementation
Establishing and Maintaining Effective Safety Committees.
FIRMA 2010 Larry J. Kallembach April 1, MB Financial Headquarters - September 2008 Chicago is a Lakefront city…….
Purchasing Forum – May The integration of the activities, plans, attitudes, policies, and efforts of the people of an organization working together.
INNOVATE THROUGH MOTIVATION Mobile Computing & Your Business KEVIN KIRKPATRICK – OWNER, MSP INC LOGO.
Protecting your Managed Services Practice: Are you at Risk?
COMPANY INTERNAL — CONFIDENTIAL Unauthorized Use and Disclosure Prohibited Copyright © 2014 Rockwell Automation, Inc. All Rights Reserved. COMPANY INTERNAL.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Copyright © Texas Education Agency, All rights reserved Performance Management and Evaluation.
Basic Elements of a Business Plan UNT in rights reserved. Entrepreneurship Unit 3, Lesson 1 Copyright © Texas Education Agency, All Rights Reserved.
© 2015 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. AT&T Proprietary (Internal.
Slide 1 POA Seminar 02 March 2016 Personnel Competence Including Certifying Staff and Release to Service Andy Swift / Michael Greer.
Leading Your District To Be All That It Can Be David Williams, Deputy Director Div. of Soil & Water Conservation 2016 Spring Area Meetings.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Softheme Service Model Software Outsourcing Solutions.
McGraw-Hill/Irwin © The McGraw-Hill Companies 2010 Internal Control in a Financial Statement Audit Chapter Six.
Implementing a Successful Corrective and Preventative Action Program
Current Plant Performance
Defining ONAP VNF Package Model
State of Michigan Achieving Software Process Improvement with
ONAP Information Model Topics Timeline
Internal controls 01-Nov-2017.
Presentation transcript:

Avoiding Plant Operating Errors AT&T NP&E April 10, 2012 © 2012 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property.

AT&T Proprietary (Internal Use Only). Not for use or disclosure outside the AT&T companies except under written agreement. 2 POE Avoidance Overall trend for POEs is declining. However, we have had numerous vendor caused POEs in 2011, which remains a concern with AT&T Senior Executives We expect our vendor partners to prevent POEs and achieve Zero POEs for the year; protect AT&T’s network POEs affect our customers and may affect your bottom line POEs can be prevented using effective controls like documents and process review before installation, detailed process compliance, second set of eyes etc. In addition, we have made available a lessons learned document to help prevent POEs. We hold our vendor partners accountable to use these lessons and prevent future POEs We need our vendor partners to maintain sharp focus on POE elimination

WHY it’s more important than ever to avoid Plant Operating Errors: 1.Consumers have become more reliant on our broadband and mobility network. 2.The environment is more competitive than ever before. 3.Our network is handling more data on an hourly basis than ever, making each outage more impactful. 4.Businesses choose AT&T because of our reliable network. Each outage diminishes our value in the eyes of these businesses. 5.Today’s environment has us touching more parts of the network simultaneously than ever before. Heightened awareness is critical. © 2012 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. AT&T Proprietary (Internal Use Only). Not for use or disclosure outside the AT&T companies except under written agreement. 3

Next Steps: © 2012 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. AT&T Proprietary (Internal Use Only). Not for use or disclosure outside the AT&T companies except under written agreement. 4 1.Cover this presentation with all employees and subcontractor employees that are responsible for AT&T’s Installation/Engineering/Quality work (CO's, POPs/Nodes, MTSOs, Mobility Data Centers ) 2.TALK about successes and failures in future team meetings. EVERY meeting should have some topic around this subject. 3.Ensure all employees in your organization complete the 2 hours web based ASK YOURSELF course (# ) by June 1 4.Post the attached “POE Avoidance” placard as appropriate in the work environment

© 2012 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. AT&T Proprietary (Internal Use Only). Not for use or disclosure outside the AT&T companies except under written agreement. 5 Plant Operating Error Avoidance Resources

Ask Yourself Principles 1.Do I have the proper ID and appropriate building access permissions for the environment I am about to enter? 2.Do I know why I’m doing this work? 3.Have I identified and notified everybody - customers and internal groups - who will be directly affected by this work? 4.Can I prevent or control service interruption? 5.Is this the right time to do this work? 6.Am I trained and qualified to do this work? 7.Are the work orders, MOPs, and supporting documentation current and error-free? 8.Do I have everything I need to quickly and safely restore service if something goes wrong? 9.Have I walked through the procedure? 10.Have I made sure the procedure includes proper closure including obtaining clearance and release for the appropriate work center? © 2012 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. 6

7

MOP Best Practices Summary Minimizing Impacts and POE for Tech Insertion and Change © 2012 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. AT&T Proprietary (Internal Use Only). Not for use or disclosure outside the AT&T companies except under written agreement. 8  Development of Methods of Procedure (MOP) for technology insertion and change  Driven from Deployment Guidelines and Gold Standards (Engineering rules and parameters).  Uses a standard template, including prerequisites, pre-checks, execution, post-checks, validation, and service assurance.  MOP Certification  Vetting of MOPs in a Production Support Lab (PSL) or approved peer review of paper documentation where no PSL exists, prior to field use to minimize MOP defects  MOP Risk Assessment (RA) and review  Quantifies MOP impact risk via numerical scoring.  Enforces MOP review and approval to appropriate teams and management levels.  Enforces an End-to-End view on network and service impacts, and inter-element dependencies.  Execution of the MOP by the appropriate Work Center (e.g. NRC, PCO, etc.)  Validation of successful technology insertion or change and post-change service assurance

Procedural Error Reduction Best Practices © 2012 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property. AT&T Proprietary (Internal Use Only). Not for use or disclosure outside the AT&T companies except under written agreement. 9 Fully implement the “Ask Yourself” program, including formal training. Use MOP Development, Certification, Risk Assessment, Approval, and Review best practice; formal MOP Best Practices Training (# ). Take an End-to-End view on procedure impacts, including impacts on services, and understand inter-element dependencies. Complete Service Validation and Assurance Testing. Utilize 3CP testing processes during planned activity. Communications, Command, and Control Process Coordinated testing with the NRCs (e.g., MNRC) Fully implement training and certification as appropriate, including subcontractor employees training. Ensure Accountability: Connect Procedural Errors to yearly Goal commitments and track improvement status with action plans. Implement appropriate disciplinary/corrective action plans. Review monthly Procedural Errors (OTD misses, Defects, Outages etc.) on a regular basis.