3 Way Market Split in IEX for delivery dated 2 nd July’14 Average Price (Rs/kWh) : S1  6.85 S2  6.87 Rest of India  2.85 UMCP  3.89 Source: IEX.

Slides:



Advertisements
Similar presentations
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
Advertisements

ERPC, Kolkata.  Definition and Concepts  Standards and regulation for TTC calculation  Calculation of TTC  Challenges in calculation of TTC  Way.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
The Plan Gives you the freedom to choose the amount of premium, and invest in market linked funds, to generate potentially higher returns. A part of the.
Three Competition Problems. Problem I Three firms. Cost functions are as shown. Demand is Q = 22.5 – 1.5P Compute P, Q.
Copyright © 2012 Pearson Addison-Wesley. All rights reserved. Mathematical Postscripts Chapter 5 Chapter 6 Chapter 8 Chapter 21.
Further Optimization of Economic Functions
Path Operator Implementation Team Report to OC March 25, 2015.
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
Lectures in Microeconomics-Charles W. Upton Solution to Three Competition Problems.
©CourseCollege.com 1 15 Plant Assets Plant assets are also know as Property, plant & equipment Learning Objectives 1.Account for the acquisition cost of.
AGEC 407 Economic Decision Making Marginal analysis –changes at the “margin” –examining the results of an additional unit.
©2004 PJM 1 STATE OF THE MARKET REPORT 2003 Joseph E. Bowring Manager PJM Market Monitoring Unit FERC Briefing Washington, D.C. April 14, 2004.
Network Customer Meeting Access Metric Update November 16, 2006.
Open Access. DEFINITION OF “OPEN ACCESS” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission lines or distribution.
1 Market Trials Congestion Revenue Rights Weekly Update June 25, 2010.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
Market Evolution Program Day Ahead Market Project How the DSO Calculates Nodal Prices DAMWG October 20, 2003.
OPUC Natural Gas Outlook 2014 July 8,
Comments on CERC’s Staff Paper: Developing a Common Platform for Electricity Trading S. A. Khaparde, A. R. Abhyankar and V. Sarkar Indian Institute of.
Power Plant capacity - 2,49,488 MW fold increase Electricity generation- 959 BU fold increase Transmission lines- 2,86,500.
Review of CAISO Wholesale Electricity Market Trends APEX Sydney Conference California Electricity Wholesale Market Trends October 13, 2008 Anjali Sheffrin,
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
OPEN ACCESS EXPERIANCES AND WAY AHEAD ON V K Agrawal, General Manager IN WORKSHOP ON GRID SECURITY AND MANAGEMENT.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
FNR 407 Forest Economics William L. (Bill) Hoover Professor of Forestry
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
Interconnector Under Test Update to TSC Modifications Committee 5 th December 2012.
4 Way Market Split in IEX for delivery dated 18 Aug’14 (Final) Source: IEX Average Price (Rs/kWh) : S1  5.35 S2  5.49 Punjab  3.04 Rest of India  3.02.
IFIEC EUROPE 1 ERGEG Consultation 30 June Brussels Industrial customer perspective Peter Claes President - IFIEC Europe.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
Overall National Grid Development: Constraints & Options
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
PROCEDURE FOR PROCESSING POWER EXCHANGE TRANSACTIONS AT NLDC CONTROL ROOM 1.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Nord Pool Spot update 11th Baltic Electricity Market Mini-Forum October 01, 2010 Hando Sutter, Nord Pool Spot AS.
Implementation of Point of Connection (PoC) Methodology.
Southern Regional Power Committee Central Electricity Authority.
SESSION 1. Part 4 IMPORTANCE OF INTRADAY AND ADJUSTMENT MARKETS José Javier González Market Operations Director OMEL 2008 APEX Conference Sydney, October.
Workshop on Open Access in Maharashtra Nagpur 14 th May 2016 For Public Use.
Market coupling for Baltic Cable Paul Giesbertz 5 th Stakeholder Group Meeting Northern Europe ERI 26 May 2010, Copenhagen.
Nilam Cyclone – Southern Region Grid operation. Nilam Cyclone Forecast.
Balance of Year Auction Frequently Asked Questions
Best 3D Services In India | 3d servicesIndia
Hartek Group is one of India’s fastest growing company with offerings that span across Engineering, Renewables, Technology , Construction , Fuel and Manufacturing.
Open Access.
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Scheduling of Collective Transactions Through Power Exchange
Chapter 5: Competition and Monopoly: Virtues and Vices
“ Open access / Power Exchange Regulations/experiences of SR ”
بازار برق: مباني، انواع و نهادها مقدمه بازار برق: تاريخچه، زمينه‌ها و كاستي‌ها تاريخچه زمينه‌‌هاي مقررات‌زدايي كاستي‌ها انواع بازارهاي برق رقابت‌پذيري.
مدیریت استراتژيک منابع انسانی
E-bidding for Short Term Open Access by – S
Day-ahead market coupling
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
Firms in Competitive Markets
Ռազմավարական կառավարում
SECTION EXISTING CONDITION PHOTOS
Stock Market Stage Analysis.
Update on Market Trials
Pole Position Student Points Time
A B C D.
Presentation transcript:

3 Way Market Split in IEX for delivery dated 2 nd July’14 Average Price (Rs/kWh) : S1  6.85 S2  6.87 Rest of India  2.85 UMCP  3.89 Source: IEX

Congestion faced in ER-SR Corridor for 2 nd July’14 Talcher Stage II allocation towards SR : 1270MW – Talcher Stage II DC: 1410 MW – 1 Unit of 1x500 MW on outage( Annual maintenance) – 10% share( 140 MW) to Odisha – Allocation of balance surrender firm share of delhi in IGSTPS towards SR(AP,Telangana,Kerala) : MW; Total LTA  693 MW – Rerouting of MTOA of 700 MW in ER-SR Path in view of increased LTA in WR- SR Path Congestion hrs: hrs Note: TTC Revised due to Outage of Gazuwaka Pole-1

Congestion faced in WR-SR Corridor for 2 nd July’14 WR-SR Corridor TTC  1000 MW Fully utilized by LTA and MTOA Congestion Hrs: RTC S2(Including TN,Kerala and Pudducherry) – TTC  2640 MW; RM  295 MW; ATC  2345 MW – LTA: 2017MW – STOA: 410MW – PX Margin: 0 MW – Congestion hrs: hrs

4 Way Market Split in IEX for delivery dated 1 st July’14 Average Price (Rs/kWh) : S1  4.85 S2  5.07 Punjab( N3)  3.58 Rest of India  3.42 UMCP  4.24 Source: IEX

Congestion faced in ER-SR Corridor for 1st July’14 Talcher Stage II allocation towards SR : 1270MW – Talcher Stage II DC: 1410 MW – 1 Unit of 1x500 MW on outage( Annual maintenance) – 10% share( 140 MW) to Odisha – KSK Mahanadi Unit taken in Service, MTOA of 300 MW considered. Congestion hrs: hrs Note: TTC Revised due to Outage of Gazuwaka Pole-1

Congestion faced in WR-SR Corridor for 1st July’14 WR-SR Corridor TTC  1000 MW Fully utilized by LTA and MTOA Congestion Hrs: RTC S2(Including TN,Kerala and Pudducherry) – TTC  2640 MW; RM  295 MW; ATC  2345 MW – LTA: 2017MW – STOA: 410MW – PX Margin: 0 MW – Congestion hrs: 01-10, hrs

Congestion faced in Punjab Bid area for 1 st July’14 Congestion in Provisional solution in Punjab: Congestion hrs: 05-06, , 08-09, 17-19,20-21