May 2013 Tehachapi Renewable Transmission Project (TRTP)

Slides:



Advertisements
Similar presentations
EDISON INTERNATIONAL® SM Water Energy Nexus Charley Wilson Urban Water Institute February 21, 2013.
Advertisements

EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
Lisa Grow Vice President, Delivery Engineering & Operations Our Energy Future.
Southern California Association of Governments Where Will Our Children Live? Darin Chidsey Member Relations Officer Growth, Change and Rising Prices.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
1 PSE&G’s Solar 4 All™ Program: Pole-Attached Solar Installations in Your Area December 22, 2009 January 12, 2010.
C A L I F O R N I A E N E R G Y C O M M I S S I O N California Energy Commission Electric Vehicle Activities Pat Perez California Energy Commission Joint.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
Electric Transmission and Economic Opportunities Richard W. Caperton Senior Energy Policy Analyst.
California Public Utilities Commission Regulation and Natural Gas Infrastructure Richard Myers CPUC Energy Division May 14, 2009.
California's three large IOUs collectively served 12.7% of their 2007 retail electricity sales with renewable power. – Pacific Gas and Electric (PG&E)
Lunch & Learn Project Presents to you: “The Electric Power Grid” By: Dexter Hypolite Electrical Engineer VIWAPA.
SOUTHERN CALIFORNIA EDISON® SM Transmission Expansion Cost Drivers NARUC Portland, Oregon David Mead Vice President, Engineering Southern California Edison.
Panama Bartholomy Advisor to Chairman Douglas California Energy Commission Clean Energy Workforce Training Program.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Regulations Governing Siting of Electric Facilities in California AEP Orange County Chapter June 30, 2009 Christine McLeod, Project Manager - Regulatory.
Montana Ambassadors Helena, Montana February 25, 2011.
Energy and Economy Transition California’s energy system to a highly efficient, renewables-based system and electrify transportation.
Charles Hosken, General Manager Imperial Irrigation District
SDG&E Summer Preparedness July 2012 Update © 2012 San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Need for Transmission Investment 2010 Mid-American Regulatory Conference AEP.
Presentation to San Diego Sierra Club Richard Caputo 12 Nov 07 Renewable Energy Parks.
Energy Action Plan “Report Card” and the AB32 “Umbrella” CFEE ROUNDTABLE CONFERENCE ON ENERGY Julie Fitch California Public Utilities Commission Director.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
The Need for Electric Transmission Improvements in Dane County.
WESTERN UNDERGROUND COMMITTEE 2015 Spring Conference 65 th ANNIVERSARY 1950‐2015 Welcome Remarks Bill Chiu Director of Engineering – T&D Southern California.
City of Fort Collins Wind Power Program March 24, 2004 John Phelan, PE Energy Services Engineer.
California Takes Charge: Policies and Incentives for Energy Storage February 11, 2015 Rebecca Feuerlicht, SGIP Project Manager, Center for Sustainable.
R / I Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code :15pm.
Challenges in Building Transmission in California Power Association of Northern California P.J. Martinez VP, Engineering Pacific Gas & Electric Company.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Rob Oglesby Executive Director California Energy Commission C ALIFORNIA E NERGY P OLICY G OING F ORWARD.
Riverside County Transportation & Land Management Agency Juan C. Perez Director Riverside County Renewable Energy Grant Update August 3, 2015.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM IEPR Workshop Southern California Reliability: Transmission System Additions.
Renewable Energy: A Co-op Point of View Renewable Energy Resources Committee of the American Bar Association Section of Environment, Energy, and Resources.
Electric Utility Perspective on the Water-Energy Nexus Jack Sahl, Director Environment and Resource Sustainability Southern California Edison August 28,
Renewable & Alternative Power Senate Energy, Utilities & Communications Committee Stuart R. Hemphill Director, Renewable and Alternative Power Southern.
Senate Bill 1 and the New Solar Homes Partnership Valerie Hall California Energy Commission December 8,
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Utility Procurement: What’s Next? IEP 2015 Annual Conference
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Overview of the Grid Randy Manion, Western Area Power Admin. EPA Clean Power Plan Workshops Farmington, NM, December 7 and 8, 2015 Tuba City, AZ, December.
California Solar Initiative Dian M. Grueneich, Commissioner California Public Utilities Commission March 30, 2006.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Joint California Energy Commission and California Public Utilities Commission Bulk Storage Workshop November 20, 2015 Kelly Rodgers Energy Program Manager.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
PacifiCorp and CAISO Expanding Regional Energy Partnerships
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Presented to: Wisconsin Industrial Energy Group Board of Directors May 8, 2008 Alliant Energy Generation Update.
AES HUNTINGTON BEACH ENERGY PROJECT
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
Renewable & Alternative Power Implementation of the California Renewables Portfolio Standard February 6, 2007 Senate Energy, Utilities, and Communications.
Creating a Sustainable Energy Future Alex Glenn State President Progress Energy Florida, a subsidiary of Duke Energy.
Devin Rauss Building California’s Flexible Grid October 27, 2018
San Francisco’s Community Choice Program
A local, not-for-profit electricity provider
The Transition to a High DER Future
Opportunities in the Changing Energy System
SunZia Project Description
Elizabeth Hutchison February 26, 2016
Transitioning to a Clean Grid: What’s Next for the Central Coast?
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Presentation transcript:

May 2013 Tehachapi Renewable Transmission Project (TRTP)

 SCE is expanding and upgrading its transmission and distribution networks to:  Meet the region’s growing demand for electricity  Improve grid performance  Meet California’s ambitious renewable power goals  Renewable resources such as wind and solar are located far from the populated areas where customers can put that power to use  Building new or upgrading existing high- voltage transmission lines makes it possible to transport power from its generation source over long distances to where most Californians live and work DELIVERING MORE RENEWABLE POWER

3 THE PLAYING FIELD BUILDING INFRASTRUCTURE MEANS BALANCING COMPETING INTERESTS… SAFETY, RELIABILITY PUBLIC POLICY, RENEWABLES AFFORDABLE ENERGY VARIOUS INTERESTS

4 TEHACHAPI RENEWABLE TRANSMISSION PROJECT (TRTP) The nation’s largest transmission project devoted primarily to renewable energy Total project length: 250 circuit miles of infrastructure (spanning 173 miles) across 20 communities in 3 counties; nearly all in existing utility right-of-way corridor Overall project cost: $2.1 billion New capacity: Enough renewable energy capacity to power approximately 3 million homes (4,500 megawatts) CPUC approved the overhead project in 2009 with completion targeted for late 2015 TRTP Segments 1-3 (shown as green lines) were approved in March 2007 and are complete

5 TRTP: $2.1 billion project spanning 20 communities to import up to 4,500 MW of renewable power to the Southern California basin CURRENT STATE NOW2015 CPUC approves overhead construction after extensive engineering and environmental analysis Construction begins and Chino Hills portion later halted by CPUC 12 of 18 transmission structures complete in Chino Hills CPUC directs SCE to explore undergrounding Complete project to meet state renewable mandate CONSTRUCTION ON OTHER TRTP SEGMENTS CONTINUES

 Most effective route for transmitting 500 kilovolts to import up to 4,500 MW of renewable power over distance  Least environmental impact  Most cost-effective: extra $400m-$700m to underground  3 miles is less than 2% of overall project  $400m - $700m is approximately 25% - 33% of total project budget  Construction method  Overhead proven reliable over time  Underground of 500 kilovolt transmission is first in US 6 OVERHEAD IS THE BEST OPTION

7 OVERHEAD/UNDERGROUND COMPARISON Tehachapi (Chino Hills)OverheadUnderground Supports state’s renewable energy goalsYESYES – But potential schedule delays Environmentally sensitiveYES -75% complete -TRTP EIRs completed/approved NO -Two transition stations and extensive construction -Unknown artifacts underground Best use of financial resourcesYESNO -$400m-$700m additional costs -Paid by all CAISO ratepayers (SCE, SDG&E, PG&E) Safe construction methodYES FIRST IN US (500 kilovolt) Quick restoration time if outageYES -Easy to identify problem overhead -Hours/days to restore NO -Hard to identify problem underground -Weeks/months to restore Benefit to all ratepayersYESNO

 Assemblymember Steve Bradford  State Senator Alex Padilla  Board of Equalization Vice Chair Michelle Steel  County of Kern  Ventura County Econ. Dev. Agency  City of Whittier  City of Pico Rivera  American Assoc. of Blacks in Energy  CA Manufacturers & Technology Assoc.  Congress of CA Seniors  CA Asian Pacific Chamber of Commerce  Numerous other chambers of commerce throughout CA ORGANIZATIONS OPPOSING IMPACTS OF UNDERGROUND OPTION In Orange County…  Huntington Beach Chamber of Commerce  Fullerton Chamber of Commerce  Cypress Chamber of Commerce  Seal Beach Chamber of Commerce  Orange Chamber of Commerce  Placentia Chamber of Commerce  Orange County Black Chamber of Commerce  Orange County Hispanic Chamber of Commerce Partial list, to date, of individuals and organizations urging the CPUC to oppose the underground consideration:

 Potential cost impacts  Precedence for an undergrounding project like this  Bad public policy of a state agency reversing an earlier decision STATEWIDE ISSUE

QUESTIONS?