Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Advertisements

Enhanced Curtailment Calculator Task Force Report
Craig L. Williams UFAS Liaison Market Interface Manager ECC Cost Benefit Analysis Review July 17-19, 2013 Standing Committees Joint Session.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Unscheduled Flow What direction for the Future
POTF Status update.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
Phase II – Analyze the Identified Issues from Perspectives of Alternative Approaches Determine which of the identified issues remain under alternate approaches.
Path Operator Task Force Recommendation
Unscheduled Flow Administrative Subcommittee Report for ISAS Robin Chung January 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PacifiCorp-CAISO EIM Initiative Overview
Jeremy West Sr. Operations Planning Engineer ECC Update January 28, 2015.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Enhanced Curtailment Calculator
UFMP methodology changes in the updated webSAS February 2015 A video presentation reviewing the webSAS UFMP methodology changes going into effect March.
Path Operator Implementation Team Report to OC March 25, 2015.
Element Definition Process Presented by Peak to ECC Task Force April 28, 2015.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Business Practices Subcommittee
March 2003 Operations Summary Bill Blevins Manager Operations Engineering.
WECC Path Concept Task Force Report to PCC March 26, 2014 Chifong Thomas.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Peak RCCo Performance Metrics Draft –November 2013.
Unscheduled Flow Administrative Subcommittee Report for ISAS Robin Chung August 20, 2014 Salt Lake City, UT.
JJ Jamieson MIC Chair MIC Report for ISAS August 2014 Salt Lake City.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
TOP and BA Responsibilities SPP Wind Workshop May 30, 2013.
ECC Task Force Webinar November 13, Peak Anti-Trust Statement Meeting Minutes (June and Sept) Phase 1A Progress Phase 1A External Entity Testing.
ECC Task Force Webinar September 3, Peak Anti-Trust Statement Phase 1A Update webSAS Integration PSE Access Peak and the Task Force Next Steps.
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Unscheduled Flow Administrative Subcommittee Report Robin Chung October 8, 2014 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Bert Peters Chair, Path Operator Task Force
Kenneth Silver Los Angeles Department of Water & Power
Phase Angle Limitations
Brett Wangen Director of Engineering, Peak Reliability
Unscheduled Flow Administrative Subcommittee Report
Path Operator Implementation Task Force
Western Electricity Coordinating Council
Unscheduled Flow Administrative Subcommittee MIC/OC Report
Phil O’Donnell, Manager Operations and Planning Audits
Kenneth Silver Los Angeles Department of Water & Power
Terry Baker Peak Reliability
Mgr. Interconnection Reliability Initiatives
Mgr. Interconnection Reliability Initiatives
WECC RC Forum October 12, 2018.
Vic Howell – Mgr. Operations Engineering Support
Enhanced Curtailment Calculator (ECC)
Path Operator Task Force Kickoff April 3, 2013 Webinar
PacifiCorp-CAISO-NVE EIM Initiative Overview
UFMP methodology changes in the updated webSAS
Phil O’Donnell, Manager Operations and Planning Audits
Path Operator Task Force Kickoff April 3, 2013 Webinar
WECC RC Forum October 12, 2018.
Peak Reliability IRO Webinar
Peak Update Michelle Mizumori.
Two-Tier Firm Curtailment Overview
NERC Congestion Management
Bert Peters Chair, Path Operator Task Force
Jeremy West Sr. Operations Engineer
RC Transition and Tools (WIT, ECC) Update
Presentation transcript:

Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer

2 Learning Objectives History behind need for ECC Review ECC proposed functionality ECC interactions with scheduling

3 Prior to 2011: No IROLs identified in the West RC and TOPs primarily focused on Major WECC Transfer Paths Equipment/Facility ratings not considered SOLs April 2012 – RC SOL Methodology revised SOLs – facility ratings, bus voltage and stability limits IROLs – process for identification August 2013 – RC SOL Methodology second revision Improve processes for determining IROLs Greater emphasis on determining acceptable pre- and post- Contingency operating conditions The Evolution of SOLs/IROLs in the West

4 A reliability tool that Peak RC can use in conjunction with its other tools to ensure acceptable system performance What is the ECC? Phase I – Situational awareness Phase II – Enhanced curtailment / redispatch How will the ECC be implemented? Enhanced Curtailment Calculator (ECC)

5 webSAS Limitations UFMP restricted to 6 Qualified Paths TDFs based on seasonal models Increased system awareness Visibility of untagged flows Incorporation of outage info (gen and trans) Compliance Address IRO and TOP standards Address September 8 event recommendations What issues does ECC address?

6 ECC Phase I e-Tags Dynamic Transfers Network & Native Load Market Flows ACE / RBC Flows RSG Flows Provides situational awareness to RC Current hour – uses SE for topology Look ahead hours – starts with SE topology but adds generator and transmission outage data Visualizes “layers” of impacts

7 Implementation of FERC-approved curtailment methodology Transition from webSAS to ECC for support of UFMP on 6 Qualified Paths Redispatch and curtailment to manage congestion on defined elements as needed to support reliability o Collaborative effort with entities when implemented ECC Phase II

8 e-Tagging Source/Sink Granularity ECC Interactions with Scheduling BA A BA B = Contract (On) Path= Off Path BA A BA B

9 Dynamic Transfers Catalog Effort for Peak Telemetry Forecast Data Dynamic Schedules – energy profile accuracy? Pseudo-Ties – options e-Tag Build in ECC EIR Registration ECC Interactions with Scheduling

10 Task Force advising Peak on ECC Reorganized under Peak MAC Chair → Raj Hundal Meetings open to public ECCTF

11 ECC Information