Status Report TOTEM collaboration meetings 24-MAY-2010

Slides:



Advertisements
Similar presentations
TortoiseSVN By Group 1 Team B. Installing TortoiseSVN.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
The Control System for the ATLAS Pixel Detector
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
1 SOLVAY The Sarralbe Experience Sarralbe is the name of a town in France, close to the border between France and Germany. In this town Solvay has a Production.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Ch 11 Managing System Reliability and Availability 1.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
NMS Labs Mikko Suomi LAB1 Choose SNMP device managment software Features: –Gives Nice overview of network –Bandwith monitoring –Multible.
MCTS Guide to Microsoft Windows Server 2008 Applications Infrastructure Configuration (Exam # ) Chapter Two Deploying Windows Servers.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
The Glidein Service Gideon Juve What are glideins? A technique for creating temporary, user- controlled Condor pools using resources from.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Status of the Roman Pot Movement System and the Interlocks Mario Deile
Opton 4 short presentation1 Opton 4 User friendly operating software for Symmetron’s Stylitis data loggers.
Team Project: A Surveillant Robot System Little Red Team Chankyu Park (Michel) Seonah Lee (Sarah) Qingyuan Shi (Lisa) Chengzhou Li JunMei Li Kai Lin SW.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
1 Responsibilities & Planning DCS WS L.Jirdén.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
ECAL and HCAL status 1Yu. Guz 2015/02/18. ECAL maintenance 2Yu. Guz 2015/02/18 There were 22 non operational cells at the A side, because of 3 dead CW.
Analysis trains – Status & experience from operation Mihaela Gheata.
Outlook Production of the 12 DPs (220m Stations) Installation of the DPs in the LHC Tunnel Status of the RP Systems/Services Resources Production of DPs.
Progress report Collaboration meeting 23-SEP-2009
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
Project Management Inspections and Reviews 1 February.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
ALICE TPC Gas Control System (toward the first fully implemented LHC gas system) S. Haider EP-TA1-GS.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Version Control and SVN ECE 297. Why Do We Need Version Control?
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
1 By Shafi Chowdhury PhUSE 2011 Managing Data Issues.
Operations model Maite Barroso, CERN On behalf of EGEE operations WLCG Service Workshop 11/02/2006.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
Status Report TOTEM Collaboration Meeting 17-NOVEMBER-2014
Author: Mr. Richard Crisler
Supervision Miniworkshop JCOP Workshop 2015
TOTEM Configuration Tools
STATUS OF THE DAQ+MOVEMENT CARIPARO PROGRAM
RPC Detector Control System: towards the final system
Design Space of Software Development Methodologies
Distributed Systems and Concurrency: Distributed Systems
Presentation transcript:

Status Report TOTEM collaboration meetings 24-MAY-2010

Overview DCS is in operation 24/7 DCS team activities Maintenance Development of new features

Generic Panel (improvements)

RP motorization panel (new panel) Shows motorization status for all the pots Log messages and configuration and special commands

RP pot panel (redesign) Shows only information of an specific pot Motorization and Silicon Detectors

LHC handshake (redesign) DIP and LHC Handshake are now isolated processes This should improve stability of the LHC Handshake Handshake problems reported to the JCOP support, and some things will be improved, but not everything

Self-Monitoring box ELMB boxes (under testing) Sensors box for T1

USB-ethernet adapters ELMB -> CANbus -> SYSTEC -> USB -> DIGI -> ethernet Will help in maintenance, if a computer crashes, all software can be redeployed to another node without having to recable in the counting room Already in production in the lab Will be used also in H8

Moving of the laboratory to 506 Everything ready and operational But took several working days…. of several people….

LHC information (done) Excel file for all the information we need (similar to pinout tables) Every week something is changing!!!! Integration of BPM ‘within days’

Consolidation activities (done) Exactly the same software in IP5 that in the laboratory As a ‘shortcut’ to provide something working, the computer names were hardcoded last year, so it was not possible to debug properly the system before sending to production. Migration of SVN repositories From bigbrother.cern.ch to the central services Fixes in the User Interface

DCS in H8 for RpSi Replication of the production software form IP5

Workforce confirmed 50%PPCERN 100%FLR3 yearsCERN 100%IA2.5 yearsCERN 20%FR1 yearCERN 50%JS0.5 yearBudapest 100%VT3 monthsTrainee Kuopio-Helsinki 100%JT3 monthsTrainee Kuopio 100%GP3 monthsSummer Student

Issues (from Jira) Last 30 days, not in absolute scale All maintenance effort on Ivan and Fernando Is good having trainees, but they need supervision They stay ‘short’ time have to focus in very specific tasks 13 new issues 7 issues resolved 98 issues open new/resolved issues date

Next steps (same list of Feb) Fix internal DCS problems (some parts have to be rewritten to add new functionality) Include in the pinout tables the LV max HW currents Finish LHC information integration RadMon readout Fix User Interface problems (to allow FSM operation) Propagation of states in the FSM tree (but no automatic actions) OK ?

DCS status summary (Feb 2010)

DCS status summary (May 2010)

Milestone Plan 2 WP closed 3 WP started -3 months Too many things on going

Activity Schedule D8 (done)

Activity Schedule D9 (in progress)

Activity Schedule I7 (in progress)

?

THE END