ISIM Integration & Test Mike Drury 301-286-4622 JWST-PRES-012923.

Slides:



Advertisements
Similar presentations
Ray Lundquist, NASA GSFC
Advertisements

Status of the James Webb Space Telescope (JWST) Optical Telescope Element (OTE) Northrop Grumman: Charlie Atkinson, Scott C. Texter NASA/GSFC: Lee Feinberg,
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Solar Orbiter EUS: Thermal Design Considerations Bryan Shaughnessy, Rutherford Appleton Laboratory 1 Solar Orbiter EUV Spectrometer Thermal Design Considerations.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectEnv Test Planning, 3-4 May 2005 LAT Environmental Test PDR 1 LAT Environmental Test Planning and Design Review 3-4 May 2005 LAT EGSE and.
Integration and Test 14 October 2008 Martin Nordby.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
From Research Prototype to Production
James Webb Space Telescope Integrated Science Instrument Module Status Jamie Dunn JWST/ISIM Manager JWST Partner’s Workshop May 19, 2009 JWST-PRES
GLAST Large Area Telescope:
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
1 Observatory I&T and Launch Campaign Flow Greg Jones May 20, 2009 JWST-PRES
KIDDE FIRE PROTECTION Vega Peer to Peer Networking.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 NRL-SLAC Networking LAT Environmental.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
Installation of the T600 at Fermilab CSN2, September 22,
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
The Space Telescope and The Lagrangian Point.  Launch Scheduled for 2018 by European Space Agency  18 Segment Primary Mirror (Gold-plated Beryllium;
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
GLAST Large Area Telescope:
Cryoplant Controls Installation
Gayle K. Martin November 14, 2016
SPP FIELDS V1234 Thermal PSR
Mechanical Integration
Software and System Delivery
0.0 Instrument Suite Name Presenter’s name
Integration and Test GLAST Large Area Telescope:
2K CB FDR Overview:  Agenda, Charge, Review Process
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
Design Integration and Analysis
Mikael Olsson Control Engineer
LAT Environmental Test Pathfinder F2F NRL-SLAC Networking Update
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

ISIM Integration & Test Mike Drury JWST-PRES

Agenda ISIM CDR RFA Status ETU SI Preparations ETU Road Show Electrical I&T Harness Mock Up ISIM Control Room ISIM I&T Test Team Operations Helium Shroud Cryo-Vac Time Line I&T Flow Path Forward

RFA Status 04/28/08 ISIM I&T received two RFAs at the CDR. Crane Lifts: ITP crane lift GSE not shown during CDR. How does this GSE prevent tilt and uneven lift/descent of the integrated ISIM/ITP into Tvac chamber. Concern for twist of ITP and possible uneven "impact" during installation Response provided and ACCEPTED by Originator for Closure SES GSE Vibrations Imparted to ISIM OGSE: Measure the vibration imparted by the flowing helium gas in the SES cooling loops, and develop predictions for the level of vibration that will be imparted to the ISIM, through 1) the thermal straps that are connected to the cooling loops at the radiator attachment points, and 2) the ITP, though the loops that loops that are linked to it. Rationale - Turbulent flow through pipes can generate vibration. Additionally, the pipes can transmit vibration from the environment, and so represent a short circuit around the vibration isolators. Response was provided 04/03/09

ETU SIs 04/28/08 Preparations are well underway for the receipt of ETU Science Instruments at GSFC Procedures for handling are in draft form under internal review Documentation requested for proof testing and inspection of MGSE Requested safe-to-mate procedures that will be used for incoming post shipment functional ISIM I&T is engineering, designing, & purchasing materials for the ETU road show cables ISIM Harness will build, test, and deliver cables to I&T Working on the details of the end item data package (EIDP) NASA and SI teams will mutually agree on the EIDP contents

ETU Road Show Block Diagram

Electrical I&T 04/28/08 Design and engineering of GSE cables nearly complete Materials and parts have procured Harness kits are being assembled for all harness builds Developing the system that will perform ISIM/IEC safe to mate Developing safe to mate procedures for the road show and ISIM I&T

ISIM Harness Mock Up (Region 1) 04/28/08 Current plans for the mock up include the addition of secondary structure Install the ICP As Accurately place the ICP 1s in the instrument envelope Develop a region 2 harness mock up Install thermal sensors Move the harness mock up from the build 7 basement to the big top tent

Control Room Network rack, firewalls, routers, switches and wireless installed, tested, and operational (internal and external connectivity) OSIM equipment installed and tested with the network Fiber links to the SES and Acoustic chamber tested and ready for use JLAB80/SITS rack installed and being used for ISIM development

ISIM I&T Test Operations Team 04/28/08 Accomplishments since ISIM CDR -Developed first draft of ETU Roadshow test plan and related schedule -Created outline of ISIM System Functional Test and Comprehensive Performance Test - Provided support to NIRSpec DS Pathfinder I&T effort - Provided IRSU command/telemetry definitions to NG and supported the IRSU team in their box level testing - Conducting period meetings with ISIM optical team for determining exposure types and OSIM operations concepts - Identified list of GSE needed for ISIM I&T - ISIM Integration and Test Set (IITS) Specification nearly completed (only 1 TBD remains)

Helium Shroud 04/28/08 Helium shroud (option 3) continues to be assembled in the I&T complex area (building 10) Main purpose of the 03 configuration is the Primary Mirror Backplane Support Structure (PMBSS) Cryo Shroud is assembled outside of the Space Environmental Simulator (SES) and hoisted in via the building 10 overhead crane Option 3 acceptance test preparations Draft of acceptance test plan has been distributed for internal review Upon the completion of the 03 acceptance test the shroud will be removed from the SES and reconfigured for the option 1 acceptance test Main purpose of the 01 test is the ISIM Cryo-Set test Helium shroud is equipped with a valve box for enhanced controllability of cooling zones

Helium Shroud 04/28/08 Shroud Floor Support Structure OSIM Clearance LN2 Guard Shroud He Floor Shroud

Helium Shroud 04/28/08

Helium Shroud 04/28/08 He Shroud being hoisted to option 3 shroud permanent legs

Helium Shroud 04/28/08

Helium Shroud 04/28/08

Valve Box SES Shell The valve box controls the flow of helium gas through each zone

ISIM I&T Overview

Cryo-Vac Time Line

Path Forward 04/28/08 Continue to prepare for the ETU Science Instrument receipt and road show Helium Shroud option 1 and option 3 acceptance test Complete the OSIM Shroud requirements and statement of work document Continue to prepare for the ISIM ETU program Finalize ETU SI EIDPs Complete ISIM System Functional Build GSE harness for the road show Complete harness mock up upgrades