Ardavan Asef-Vaziri Systems and Operations Management

Slides:



Advertisements
Similar presentations
PowerPoint Presentation
Advertisements

Aggregate Capacity Planning Lecture # 5 Aggregate Capacity Planning Lecture # 5.
Topics to be Covered 1. Capacity Planning
Operations Management Aggregate Planning Chapter 13
Aggregate / Production Planning
IES 371 Engineering Management Chapter 14: Aggregate Planning
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
PRODUCTION AND OPERATIONS MANAGEMENT
OPSM 301 Operations Management
Operations Management
Aggregate Planning.
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
Rev. 03/09/05SJSU Bus David Bentley1 Chapter 12 – Aggregate Planning Planning levels (long, intermediate and short ranges and real time control);
Chapter 5 Aggregate Planning Operations Analysis Using MS Excel.
Aggregate Planning. Overview Aggregate planning in the planning process Aggregate planning in the planning process Aggregate planning strategies Aggregate.
Aggregate Planning and Master Scheduling
Aggregate Planning and Master Scheduling
Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now2 months1 Year Aggregate Planning.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
1 Slides used in class may be different from slides in student pack Chapter 16 Aggregate Sales and Operations Planning  Operations Planning Overview 
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
Ardavan Asef-Vaziri Systems and Operations Management
© 1997 Prentice-Hall, Inc Principles of Operations Management Aggregate Scheduling Chapter 12.
Operations Management Aggregate Planning
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
CHAPTER 3 AGGREGATE PLANNING. LEARNING OBJECTIVES Define aggregate planning and how it is useful Identify optional strategies for developing an aggregate.
Aggregate Planning.
AGGREGATE PLANNING Rachmat A. Anggara 9th of April 2010.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Operations Management Aggregate Planning
Aggregate Planning Chapter 11.
 The McGraw-Hill Companies, Inc Irwin/McGraw-Hill 1 Facilities and Aggregate Planning Chapter 12 Due Date!
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
Operations Fall 2015 Bruce Duggan Providence University College.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Aggregate Planning Intermediate-range capacity planning that typically covers a time horizon of 2~12 months – may extend to as much as 18 months. Product.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
1 Chapter 13 Production Planning Supplemental Slides.
Planning Horizons Today3 Months 1 year5 years Planning Horizon Short-range plans Job assignments Ordering Job scheduling Dispatching Intermediate-range.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
© The McGraw-Hill Companies, Inc., OUTPUT PLANNING PROCESS Aggregate Planning.
Production Planning.  What to produce  When to produce  How to produce.
LESSON 2 Sales and Operations Planning (S&OP) and Aggregate Planning
SALES AND OPERATIONS PLANNING AGGREGATE PLANNING PRODUCTION PLANNING OPERATIONS PLANNING How to meet effectively and efficiently forecasted requirements.
Problem 1 Demand Total There are 20 full time employees, each can produce 10.
Chapter 14 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
Chapter 8 Aggregate Planning in the Supply Chain
Dr Sh Salleh bin Sh Ahmad
Production and Operations Management
Aggregate Production Planning (APP)
Presentation transcript:

Ardavan Asef-Vaziri Systems and Operations Management Chapter 13 Aggregate Planning Ardavan Asef-Vaziri Systems and Operations Management

Intermediate-range capacity planning Aggregate Planning Intermediate-range capacity planning Usually covers a period of 12 months. Short range Intermediate range Long range Now 2 months 1 Year

Overview of Planning Levels Long-range plans Long term capacity Location / Layout Intermediate plans (Aggregate Planning) Manpower Utilization regular time, overtime Outsourcing Buying from a third party Inventory carrying product for latter periods Backlog satisfying the demand of the earlier periods Hiring and layoff Short-range plans (Scheduling) Job assignments Machine loading

Aggregate Planning Aggregate planning is a big picture approach to production planning. It is a production plan to meet the demand throughout the year. It is not concerned with individual products, but with a single aggregate product representing all products. For example, in a TV manufacturing plant, the aggregate planning does not go into all models and sizes. It only deals with a single representative aggregate TV. Such an aggregate TV may even does not exist in reality. All models are lumped together and represent a single product; hence the term aggregate planning.

Aggregate Planning Aggregate approach permits planners to develop intermediate-range capacity planning without being involved in too much details. In aggregate planning we are concerned with the quantity and also timing of demand. Demand is uneven through the year. Two basic characteristics of aggregate planning 1-Aggregate Product 2-Uneven Demand It begins with a forecast of aggregate demand for one year. Then a one year plan is prepared for each month. It includes volume of output, working hours, overtime, outsourcing, inventories, back orders, and hiring and layoffs.

Aggregate Planning 1-Demand 2-Regular time production 3-Overtime production 4-Outsourcing; buying from a third party 5-Inventory; production in one period and sale in one or more later periods. 6-Backlog; production in one period to satisfy the demand of one or more earlier periods. 7-Hiring and layoffs A number of aggregate plans are examined in terms of feasibility and their costs. The best one is selected.

Aggregate Planning : Summary The question is how to produce to meet the demand. How many employees, how much overtime, outsourcing, inventories, back orders? Basic aggregate planning strategies are: Level Capacity Chase Demand Demand Time period (year)

Level Capacity Maintaining a steady rate of output while meeting variations in demand by a combination of options Demand Production Production Time period (one year)

Interesting Observation in Cumulative Graph Cumulative output/demand Cumulative production Cumulative demand 1 2 3 4 5 6 7 8 9 10 11 12

Interesting Observation in Cumulative Graph Give the following demand and production. Using a line segment show the maximum inventory? Cumulative output/demand Cumulative production Cumulative demand 1 2 3 4 5 6 7 8 9 10 11 12

Chase Demand Matching capacity to demand; production in each period is equal to the expected demand for that period. Demand Time period (year) and Production

General Procedure for Aggregate Planning Determine demand for each period. Determine capacities (regular time, over time, subcontracting) for each period. Identify company’s policies regarding inventories and work force. How much inventory is allowed? What rate of overtime and outsourcing is allowed? Determine cost of working regular time and over time work, subcontracting, inventories, back orders. Develop alternative plans, compare them and select.

Back order (backlog) Back order cost is the cost of satisfying the demand of one period in one or more periods later. It is the cost of loss of goodwill, potential discounts, backtracking, extra paperwork for transactions, etc. Back order cost is stated as cost / unit / period (the same as inventory cost). Total back order cost per period is (cost / unit / period) × (total back order in the period).

Problem 1 Demand 1 2 3 4 5 6 7 8 9 Total 190 230 260 280 210 170 160 260 180 1940 There are 20 full time employees, each can produce 10 units per period at the cost of $6 per unit. Therefore the supply of full time workers is as follows 1 2 3 4 5 6 7 8 9 Total 200 200 200 200 200 200 200 200 200 1800 Overtime cost is $13 per unit. Inventory carrying cost $5 per unit per period Backlog cost $10 per unit per period Maximum over time production is 20 units per period Formulated the problem as a Linear Programming model. Using excel and solver find the optimal solution.