Infrastructure Planning: Non-Transmission Alternatives 2010 NASUCA Mid-Year Meeting San Francisco, June 15, 2010 Drew Murphy NRG Executive Vice President.

Slides:



Advertisements
Similar presentations
1CPEAC/EHC CONFERENCE – 8 March 2009 Alberta & Oil: Where it has been and where it is heading for? Peter Yang, M.Sc., P.Eng. Manager, SAGD Specialist Group.
Advertisements

Adapting to a Changing Energy Environment Russ Girling, President and CEO, TransCanada Corporation May 15, 2012 STRIKING A BALANCE IN THE MIDST OF CHANGE.
Antitrust/Competition Commercial Damages Environmental Litigation and Regulation Forensic Economics Intellectual Property International Arbitration International.
1 FIRST QUARTER 2009 INVESTOR CONFERENCE CALL. 2 Today ’ s Hosts Steve Romano Chairman & Chief Executive Officer Jim Baumgardner President & Chief Operating.
JinkoSolar Holding Co., Ltd. Q Earnings Call Presentation June 7, 2013.
11 Presentation for ERCOT ETWG FERC Notice of Proposed Rulemaking: Frequency Regulation Compensation in the Organized Wholesale Power Markets (RM )
Energy and Telecommunications Interim Committee January 29, 2004.
1 1 Introduction to eVgo Customer Offer California Public Utilities Commission NRG EV Services October 2011 Terry O’Day.
Fuel Cell Forum-12 March 2007 Considerations on the purpose, feasibility, and design of incentives for Alternative Energy adoption.
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
Standard Register Fourth Quarter and Full Year 2007 Conference Call February 22, 2008.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Unlocking value from existing utility assets NARUC Meeting – February 2012
Structure and Financing For Change Princeton, NJ November 6, 2009 Lee Davis Vice President, Development.
BOSTON CHICAGO DALLAS DENVER LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Governors’ Wind Energy Coalition November, 2011 Competitive.
SMH Capital Houston, TX February 25, Forward Looking Statement The statements made by representatives of Natural Resource Partners L.P. (“NRP”)
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
1 Marine Insurance Seminar Houston, Texas September 19, 2006 Presented by: Lawrence R. Dickerson President & Chief Operating Officer.
Economic Transmission Case Study: Champlain Wind Link Vermont System Planning Committee March 10, 2010.
Corporate Overview September Hannon Armstrong Sustainable Infrastructure Capital, Inc. (the "Company") makes forward-looking statements in this.
Change to presentation of financial results Phil Moses – Group Controller & Director of Investor Relations 23 January 2008.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
OPSI Annual Meeting Bob Hayes Vice President Natural Gas Trading October 13, 2014.
Commodity Hedging Overview May 10, 2012 The following information is current as of May 10, Memorial Production Partners LP (MEMP) intends to provide.
Grattan Institute / MEI Energy Futures Event Dr Fiona Wild Vice President, Environment and Climate Change 5 March 2015 Newman, Iron Ore.
May 13, 2009 First Quarter 2009 Earnings Review. Highlights  First quarter 2009 net sales of $46.6 million -- within the Company’s forecasted range 
Distributed Generation Benefits and Planning Challenges CREPC/SPSC Resource Planners’ Forum October 3, 2012 Arne Olson.
1 4Q 2003 Earnings October 21, Safe Harbor Statement This presentation contains forward-looking statements within the meaning of the federal securities.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
GIS Services Our long journey to an Enterprise GIS  Brief history of GIS at Noble  Map Requests  Land Focus  Data  Introducing GIS Services  Standards.
Monterey Peninsula Water Supply Project April 23, 2012.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Electric Energy Issues and the Region Connecticut Business and Industry Association Stamford, Connecticut December 2, 2004 Kevin Kirby Vice President,
1 April 22, Q 2003 Earnings. 2 Safe Harbor Statement This presentation contains forward-looking statements within the meaning of the federal securities.
1 Deutsche Bank Electric Power Conference June 14, 2004.
Western Financial Group Q Financial Results Conference Call November 16, 2009.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
Presented by: Kribs Govender GM: Low Carbon Electricity Sasol New Energy oil and gas mozambique conference 2013.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
SECOND QUARTER 2004 EARNINGS John A. Luke, Jr. Chairman and CEO James A. Buzzard President Peter H. Vogel, Jr. Interim Principal Financial Officer July.
Smith Barney Citigroup Small & Mid-Cap Conference May 6, 2004 Allmerica Financial Corporation Ed Parry Executive Vice President Chief Financial Officer.
1 1 Beacon Power Corporation Energy Storage – Regulation Issues Prepared for: Emerging Technologies Working Group January 5, 2011.
Western Financial Group Q Financial Results Conference Call May 9, 2008.
2011 Annual Meeting. Certain statements contained herein are forward-looking statements within the meaning of Section 27A of the Securities Act of 1933.
Overview November Safe Harbor Statement ♦Some of the statements included herein may include forward-looking statements which reflect our current.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
FOURTH QUARTER AND YEAR END 2012 RESULTS. The following is a Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995: This press.
January 21, 2004 First Fiscal Quarter Earnings Conference.
1 3Q 2003 Earnings July 22, Safe Harbor Statement This presentation contains forward-looking statements within the meaning of the federal securities.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
THIRD QUARTER 2012 RESULTS.  Year-over-year revenue growth of 5.5% to $32.0 million, at the high end range of guidance  Adjusted fully diluted EPS of.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
FOURTH QUARTER AND FULL YEAR 2013 RESULTS March 13, 2014.
Western Financial Group Q Financial Results Conference Call November 13, 2006.
First Quarter Fiscal Year 2009 Financial Results December 19, 2008
JinkoSolar Holding Co., Ltd.
JinkoSolar Holding Co., Ltd.
James Crowe Goldman Sachs Communacopia XVII 2008
LNG: Reliable Gas Supply for the Northeast U.S.
Transmission: the Critical Link
Standard Register First Quarter 2007 Conference Call April 27, 2007.
First Quarter Fiscal Year 2016
Transmission As Enabler
4th Quarter 2016 Earnings Call
Restructuring Roundtable Peter D. Fuller February 29, 2008
2018 FIRST Quarter Results NASDAQ: fult
The Role of Hydro-Québec in New England Electric Markets The New England Electricity Restructuring Roundtable June 14, 2013 Stephen Molodetz, Vice.
2018 THIRd Quarter Results NASDAQ: fult
New Mexico EnergyPlex Conference
Presentation transcript:

Infrastructure Planning: Non-Transmission Alternatives 2010 NASUCA Mid-Year Meeting San Francisco, June 15, 2010 Drew Murphy NRG Executive Vice President and Regional President, Northeast

1 Safe Harbor Statement This Presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of Forward-looking statements are subject to certain risks, uncertainties and assumptions and typically can be identified by the use of words such as “expect,” “estimate,” “should,” “anticipate,” “forecast,” “plan,” “guidance,” “believe,” “will” and similar terms. Although NRG believes that these expectations are reasonable, it can give no assurance that these expectations will prove to have been correct, and actual results may vary materially. Factors that could cause actual results to differ materially from those contemplated above include, among others, general economic conditions, hazards customary in the power industry, weather conditions, competition in wholesale power markets, the volatility of energy and fuel prices, failure of customers to perform under contracts, changes in the wholesale power markets, changes in government regulation of markets and of environmental emissions, the condition of capital markets generally, adverse results in current and future litigation, failure to identify or successfully implement acquisitions and repowerings, and the inability to implement value enhancing improvements to plant operations and companywide processes. NRG undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise. The foregoing review of factors that could cause actual results to differ materially from those contemplated in the forward-looking statements included in this Presentation should be considered in connection with information regarding risks and uncertainties that may affect NRG's future results included in NRG's filings with the Securities and Exchange Commission at

2 The Issue: Industry Restructuring  Separated generation planning from transmission  Created an uneven playing field  Different models for investment, cost recovery, and return  Generation no longer financeable in rate base  Restructuring effectively penalized generation and demand resources  Receive market-based revenues only  No path to revenue differential between full cost and market value, even if overall cost is lower than transmission  Demonstrates need for long-term contracts

3 New England as an Illustration Source: ISO-NE RSP09 Public Meeting Presentation, September 10, 2009

4 Comparative Economics of Options Transmission  1,100MW transfer capability  $2 billion installed  Annual cost ~$400 million Net annual cost $364/kW-year Generation  1,100MW combined cycle  $1,250/kW installed  Annual fixed cost ~$275 million  Annual fixed cost $250/kW-year  Minus energy and capacity net revenues of $173/kW-year (ISO estimate, 2008) Net annual cost $77/kW-year How can we not look at all alternatives?

5 Integrating Non-Transmission Alternatives  Restructuring created uneven playing field for transmission, generation and other infrastructure  ISO/RTO planning focus is reliability, not economics  Typically excludes options other than transmission  Does not take into account policies promoting renewable energy or environmental issues  All ISO/RTOs have a provision for ‘backstop’ planning of regulated transmission  Wholesale markets intended to be front line indicator of infrastructure needs  Creates obstacles to lowest-cost infrastructure  Wholesale markets not supporting investment  ISO/RTO planning focused on transmission If your only tool is a hammer, all your problems look like nails

6 Developing a Regional Infrastructure Plan  Individual State plans not sufficient  Need a coordinated, regional IRP process  Should answer these questions:  How much reliability is enough?  How much are ratepayers willing to pay- for what level of reliability?  Most cost-effective means of achieving reliability objectives?  What other policy considerations should be addressed that are not adequately reflected in wholesale markets?  Renewable energy goals (e.g. RGGI, RPS)  Environmental concerns (e.g. EPA and state DEP rulemaking)  Economic development considerations (local vs. regional?)  Local vs. remote generation

7 Example: Northeast Offshore Wind vs. Midwest “Imported” Wind NE Governors’ “Energy Blueprint” found that in-region renewables (10,000 MW wind identified) can be developed at a far lower cost than importing equivalent quantities of wind from out-of-region sources via new, high-voltage transmission lines. Local or Imported?

8 State Participation in Planning  Current planning typically provides only a binary choice:  Approve the single transmission project developed in the ISO/RTO planning process, or;  Face imminent reliability problems  Including Non-Transmission Alternatives in planning is critical  ISO/RTOs cannot compel purchases of generation or demand-side management resources  Only States can enter into such binding commitments

9 A Path Forward Reliability Planners  Must consider all resource solutions when evaluating and recommending infrastructure improvements  Should provide States with multiple solutions to each identified need including:  At least one transmission alternative  At least one generation alternative  An indication of how much demand side management needed to solve reliability  Feasible mix of generation, demand-side resources and transmission upgrades

10 A Path Forward  Regional or state-level processes should solicit and evaluate alternatives to meet reliability needs  Infrastructure decisions should be informed by all available options  Ratepayers benefit from lower-cost solutions if all options are considered on a level playing field

11 Q & A