Split Sole 45 Degree Raker

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Sectional Assembly and Installation
Installing Doors & Frames Ref: Handout / Text M. S. Martin Sept
Interior Wall and Ceiling Finish
Cabinet and Countertop Installation
Measuring and Layout Tools
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Basic Setting Out.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Framing Agriculture Structures
Evaluate area for vertical shore placement and determine length for header and sole. Header and sole will utilize 12” O.H. for outside vertical posts and.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
14 Ventilation Skill Drills. 2 Objectives (1 of 2) Break glass with a hand tool. Break a window with a ladder. Break windows on upper floors using the.
Structural Collapse: Shoring
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
2 Post Vertical Shore/Laced Post
All About Flats By Samantha Lee. What is a flat? Theatre flats are large pieces of constructed and painted wood that are placed on the stage to serve.
 Introduction  Designing of Die Block  Process of making Press Form Points to be Covered PRESS FORM AND RUBBER TECHNOLOGY.
Residential Construction Residential Doors Installation Guide Source: Carpentry & Building Construction Feirer & Feirer / Lowe’s How-To Library.
Skilled Trades 1201 Floor Framing
ROOF.
Wall plate should measure the insertion point height plus 30” to accommodate a 30” cleat. The 30” cleat receives 20 X 16d nails. Cut the wall plate and.
Gable, Gambrel, and Shed Roofs
1- Pipsqueak Engine Millwork on uprights and base.
10 Chapter Floor Framing. 10 Chapter Floor Framing.
Presentation 26: HIP RAFTER LAYOUT.
Solid Sole 60 Degree Raker
Header and Sole should be cut at 48”. Verticals should be measured to reflect total height of void to be shored minus 8 ½”. 8 ½” accounts for the dimension.
3- Pipsqueak Piston and Cylinder. Work holding in the Lathe Collets have definite advantages over chucks in gripping work pieces in the lathe. They apply.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Construct Pitched Roofs (Simple)
CONSTRUCTING A FIVE CABIN LATRINE
LESSON TOPIC 1.2 SHORING.
Universal Guide Installation Please read and understand the installation instructions fully before proceeding.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Rotating Base Model Assembly Instructions copyright Mechanical Kits Ltd
SHEAR AND BENDING MOMENT DIAGRAMS IN HORIZONTAL BEAMS WITH
Introduction The Gamma Bracing System  Gamma bracing system is a light weight steel, structural truss bracing frame that fits INSIDE the timber studs.
How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”
Roof and Ceiling Framing
Scratch Build a Water Tower
Ag Construction Studs Vertical framing boards are called.
Unit A3-9 Framing Agriculture Structures Problem Area 3 Construction Systems.
Roof Types, Components & Terminology
Definitions of terms associated with concrete masonry units A.Masonry Units: Blocks made from concrete, cinders, or other aggregates. B.Laying Block:
Ventilation Skill Drills.
After the roof design is selected, the next decision is the type of roof construction-- trusses or stick built. Trusses. Less labor to install trusses.
How to Build a Divider Wall By Charysse Roberson.
Horticulture II - Landscape Unit C Landscape Installation and Maintenance.
Construct Pitched Roofs (Simple)
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
Blocking a b c d.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Planer Machines. Introduction A planer is a type of metalworking machine tool that is some what similar to a shaper, but larger, and with the entire workpiece.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Mezzanine Build Plans.
Framing Agriculture Structures
Maxillary Single Implant Case Angular & Linear Correction in 2 Planes
Framing Agriculture Structures
ActivRAC® 16P Mobilized Storage System
Balsa Glider Construction
ActivRACTM 30P Mobilized Storage System
Break down Lance rack Cut one of each of these for each rack
Balsa Glider Construction
Introduction The Gamma Bracing System
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Balsa Glider Construction
Introduction The Gamma Bracing System
Presentation transcript:

Split Sole 45 Degree Raker 24” Wall plate should measure the insertion point height plus 2’ to accommodate a 24” cleat. The 24” cleat receives 14 X 16d nails. Cut the wall plate and lay it down face up and nail the 24” cleat onto the top 24” mark of the wall plate. Ex. A 8’ insertion point would receive a wall plate = 10’ Application: Split Sole rakers are designed to support wall systems which present a maximum of 10% rack. When built in pairs and fully braced these shores achieve class III status. Split Sole rakers are the preferred raker when there is debris at the base of the compromised wall or significantly uneven terrain features near the wall. Design Load for single raker shore: 4X4 = 2,500 lb. 6X6 = 3,600 lb.

Split Sole 45 Degree Raker Raker should measure the insertion point height X 17. The raker should receive 45 degree raker cuts with opposing cuts on each end. Ex. A 8’ insertion point would receive a raker = 136” or 11’ 4” Application: This is quickly accomplished by utilizing a speed square for the forty five degree scribe and a 2”X4” block for the 1 ½” return cut. ***see Solid Sole 60 Degree Raker guide for a general illustration of raker cut layouts with speed squares and 2x4’s. 136”

Split Sole 45 Degree Raker Bottom braces x 2 (2 x 6) should measure the same length as the insertion point height. Both ends of the braces are perpendicular cuts. It is important to note that 45 degree rakers have 12/12 ratio of rise to run. 8’ braces may run long and can be trimmed as needed. Ex. A 8’ insertion point would receive 2 Bottom Braces = 8’ each Application: Cut the sole plate and lay it down face up and pre nail the 24” cleat onto the 8’ mark from the front edge of the sole plate ***When nailing this cleat only drive one nail into the sole plate to temporarily maintain its position. This collection point requires adjustability and cannot be finish nailed until the shore is pressurized. 8’

Split Sole 45 Degree Raker 45 degree Split Sole Rakers require a trough base to anchor the raker. Trough bases are constructed utilizing two 36” 2x6’s and one 36” 2x4. These are assembled by standing the 2x6’s up on their long edge, placing the 2x4 flat in between the 2x6’s and placing seven 16d nails into each side. Next, place one 18” 2x4 cleat on top of the 2x4 base flush with the end of the trough and nail it with five 16d nails. If raker is to be placed on soil, a 18” square foot will be required under the trough. This is accomplished by placing three 18” 2x6’s directly under the trough. 36” 18”

Split Sole 45 Degree Raker Sole Anchors should be engineered when existing anchors are not proximal to desired raker placement or adequate. These anchors are a minimum of 4”X4”X4’ with 4 – 1”X36” steel pickets driven at 12” spacing at each raker location. Two pickets may be utilized when driven into concrete or paving material. It may be suitable to run one continuous sole anchor to accommodate multiple rakers. 6x6 sole anchors will provide greater strength and stability. Ex. A 16’ X 4”X4” could be utilized to accommodate a three rakers at 6’ spacing between rakers. Application: Measure the distance on the ground that correlates to the collection point or insertion point. Add 18” for the back half of the trough base, 3 ½” for the wall plate and 3 ½” for 4X4 wedges or 1 ½” for 2x4 wedges. Total additional distance is 23” if using 2x4 wedges and 25” if using 4x4 wedges. This sum results in the distance from the wall at which the sole anchor should be placed. This should be built while the raker shore is being constructed. This diagram represents a bird’s eye view. Drilling holes for the pins results in greater assurance that the pins will be driven plumb. Ex. An 8’ insertion point and bottom braces would result in a sole anchor placed at 9’ 11” for 2x4 wedges or 10’1” for 4x4 wedges. An easier general rule of thumb is to always add two feet.

Split Sole 45 Degree Raker Place the raker against the wall plate and insure that the raker cut marries well with the cleat. Capture the wall plate joint by completely covering the joint with a 12X12 gusset and placing 8X8d nails into the wall plate and 5X8d nails into the raker. Bottom 2x6 brace should be placed a minimum of 6” up from the bottom of the wall plate. This will accommodate the trough height. Insure that the brace is square to the wall plate. To insure that the raker angle is maintained, pull a measurement from the interior edge of the wall plate to the point of the bottom raker cut and the result should be the same as the insertion point. Place one 16d nail into the raker joint and five 16d nails into the wall plate joint. The single nail will allow for quick adjustability when the raker is placed and pressurized. Upon completion, carefully flip the shore over onto the other side and duplicate the entire process. *** This diagram also depicts the 12/12 rise to run ratio of a 45 degree raker and how that correlates to the cleat placement or collection points on the wall plate and bottom brace. 8’ Min 6”’ 8’

Split Sole 45 Degree Raker When placing the raker, insure that the raker is plumb or square to the building and sole anchor. Set the trough base, walk the assembled raker into place and set it into the trough base. Place 2x4 or 4x4 wedge packs between the sole anchor and the trough base. While placing the raker, the top of the wall plate will contact the wall but leave a growing gap towards the bottom of the wall. When this is encountered, Remove the single 16d nail in the bottom brace raker joint. This allows the wall plate to “flex” into position. Pressurize the wedges until the entire wall plate contacts the wall. At that point, finish nailing the bottom brace raker joint and complete pressurizing. The shore should only be pressurized until it is snug. Do not overpressurize.

Split Sole 45 Degree Raker To complete this shore, place pins on both sides of the trough at the front and back to eliminate lateral movement of the trough base. Place five 16d nails through the trough base sides into the base of the raker. If the bottom 2x6 cross brace exceeds 7’ in length, a midpoint 4x4 block should be placed between the bottom braces and nailed with five 16d nails. If the raker is on soil, place the 18” square foot under the trough base. To convert this shore into a class III shore, build it in pairs and apply cross bracing and diagonal bracing. Refer to bracing rules in the 45 degree solid sole raker diagrams. Any raker length greater than 11’ requires midpoint 2x6 bracing as well with five 16d nails in each joint. Insure that bracing elements do not extend past the back edge of the wall plate. The wall plate alone should make contact with the wall.

Split Sole 45 Degree Raker Prior to final pressurization the wall plate should be pinned to the wall to insure that the shore does not “walk up” the wall. This is accomplished with 2 – ½” X 8” wall anchors. Other variables exist that should be referenced in the FOG or SOG Manual.