Managing Data Center Organizing your way to an easier Job.

Slides:



Advertisements
Similar presentations
Team 1: Aaron, Austin, Dan, Don, Glenn, Mike, Patrick.
Advertisements

Top 10 Ways Of Reducing Your Data Center Infrastructure Operating Costs.
Managing Software Assets. Managing Software Assets Software costs represent one of the largest information technology expenditures in most firms. Amounting.
Process Selection and Facility Layout
1 Setup Reduction For CNC Principles Copyright 2001.
Chapter 7 Demand Management Learning Objectives After reading this chapter, you should be able to do the following: Understand the critical importance.
Budgeting Basics WHPE. The goals of this chapter: To give you an understanding of how common your situation is. To outline benefits and process for creating.
DATA CENTERS INTRODUCTION Dr. Natheer Khasawneh. Goal… How Data Centers are critical environments for companies. Aspects of a Data Center's physical component.
Reliability Week 11 - Lecture 2. What do we mean by reliability? Correctness – system/application does what it has to do correctly. Availability – Be.
Semester 4 - Chapter 3 – WAN Design Routers within WANs are connection points of a network. Routers determine the most appropriate route or path through.
Chapter Thirteen Maintaining and Upgrading a Network.
CLOUD COMPUTING.
© 2001 by Prentice Hall8-1 Local Area Networks, 3rd Edition David A. Stamper Part 3: Software Chapter 8 Client/Server Architecture.
VIRTUAL BUSINESS RETAILING 3.0
Sustainability is Good for Business PURCHASING. Introduction –Our customers are looking for accommodation that is working to improve its sustainability.
Data Center Construction Project Updates and Experiences Gary Stiehr May 6, 2008 HEPiX Spring 2008.
IP Addressing & Subnetting Made Easy. Part 1: Working with IP Addresses.
Basic Concepts of Computer Networks
The Marketing Mix Price
Section 11.1 Identify customer requirements Recommend appropriate network topologies Gather data about existing equipment and software Section 11.2 Demonstrate.
Network Design Essentials. Guide to Networking Essentials, Fifth Edition2 Contents 1. Examining the Basics of a Network Layout 2. Understanding Standard.
Network Design Essentials
Chapter 2 Network Design Essentials Instructor: Nhan Nguyen Phuong.
Local Area Networks (LAN) are small networks, with a short distance for the cables to run, typically a room, a floor, or a building. - LANs are limited.
Management of Waiting Lines McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Workplace Organisation Today we are going to look at different kinds of working environment, e.g. Open plan Cellular Hot-desking Teleworking Flexible working.
10/4/2015Tables1 Spring, 2008 Modified by Linda Kenney 4/2/08.
1 CHAPTER 18 MODERN DEVELOPMENTS IN MANAGING OPERATIONS.
© The McGraw-Hill Companies, Inc., 2007 McGraw-Hill/Irwin Chapter 21 Cost Allocation and Performance Measurement.
Teacher’s Desk Assigned seat #1Assigned seat #6Assigned seat #11 Assigned seat #2Assigned seat #7Assigned seat #12 Assigned seat #3Assigned seat #8Assigned.
Term Project Part 3 Matt Willey. What effect does interest rate have on total payment? A lower the interest rate means less interest paid over all. When.
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
FACILITY LAYOUT PROBLEM
1 Computer and Network Bottlenecks Author: Rodger Burgess 27th October 2008 © Copyright reserved.
Trade Skills Print Reading and Ductwork. 2 Drawings are a useful tool in manufacturing and construction because most people find it difficult to.
LAN Switching and Wireless – Chapter 1 Vilina Hutter, Instructor
Intro to Network Design
Views Lesson 7.
1 Chapter Two: Sampling Methods §know the reasons of sampling §use the table of random numbers §perform Simple Random, Systematic, Stratified, Cluster,
Server Virtualization
 Manufacturer or exporter sells directly to an importer or buyer located in the foreign market area.  Exporter take a more direct approach to exporting.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
Lecture 4. IS Planning & Acquisition To be covered: To be covered: – IS planning and its importance Cost-benefit analysis Cost-benefit analysis Funding.
Chap 4 - Facility Layout: Manufacturing and Services.
Prepared by:Ronnel P. Agulto, CpE Objectives Different types of topologies; Their advantages & disadvantages How to choose an appropriate topologies in.
3/12/2013Computer Engg, IIT(BHU)1 CLOUD COMPUTING-1.
Modul ke: Fakultas Program Studi Teknologi Pusat Data 04 FASILKOM Teknik Informatika Pendekatan Proyek Pusat Data.
PLANT LAYOUT. Definitions In the words of James Lundy, 'Plant layout identically involves the allocation of space and the arrangement of equipments in.
1 TCS Confidential. 2 Objective : In this session we will be able to learn:  What is Cloud Computing?  Characteristics  Cloud Flavors  Cloud Deployment.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Management of Waiting Lines Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
What is the reason for installing hardware – P1 By Ridjauhn Ryan.
Vault Reconfiguration IT DMM January 23 rd 2002 Tony Cass —
Flat structure The organizational structure of Polykids is a flat organization, this is an organizational structure with few or no levels of management.
Aggregate Planning and Master Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior.
Chapter 7 DEMAND MANAGEMENT MANAGING SUPPLY CHAINS A LOGISTICS APPROACH 9e COYLE | LANGLEY | NOVACK | GIBSON ©2013 Cengage Learning. All Rights Reserved.
© 2003, Cisco Systems, Inc. All rights reserved. 2-1 Campus Network Design.
Academic Planning, Majors, and Careers. Selecting Courses Combine your interests with requirements. Talk with your advisor about your interests and general.
Production Planning and control – ME 1009 Unit 1 Introduction.
How to get the needed computing Tuesday afternoon, 1:30pm Igor Sfiligoi Leader of the OSG Glidein Factory Operations University of California San Diego.
Homework 1- Gateway.
Chapter 7: Manufacturing Processes
Managing Technology and Innovation
Best Practices Consortium
Copyright © 2007 McGraw-Hill Ryerson Limited
ENTREPRENEURSHIP DEVELOPMENT
Occupancy Meeting Please be sure to sign in at the door!
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Production and Operations Management
Presentation transcript:

Managing Data Center Organizing your way to an easier Job

The Need For Organization Previous chapters talked about strategies for designing a reliable, easy-to-understand Data Center. Now we will discuss effective management of the room. A Data Center that is thoughtfully designed and strategically managed takes less time to supervise because: – The room's layout and infrastructure are easy to understand and work with – Less accidental downtime occurs due to mechanical failure or human error – Costs are avoided because fewer alterations to its cabling or electrical infrastructure are needed – More equipment can be accommodated because floor and cabinet spaces are used to greater effect

No matter how well-designed your Data Center is— how robust, modular, flexible, standardized, and intuitive its layout is—the Data Center can't be productive if it is allowed to fall into disarray. Ex: library, if the books that have been read aren't returned to their proper place on the shelves. The greatest resources becomes practically useless under those circumstances. Question: Does your company have a Data Center manager, someone who designs, supports, and oversees all of your company's server environments? The Need For Organization (Cont.)

Organizing Equipment: Form vs Function The first step in managing a Data Center begins the moment the room comes online and incoming equipment arrives. There are four common approaches for arranging servers within a Data Center 1.Clustering devices with similar functions. 2.Organizing them by internal business group or department. 3.Grouping models made by the same manufacturer. 4.Not organizing them at all, simply filling server cabinet locations on a first-come, first-served basis It is also important, though, to consider which of them makes the room easiest to manage. Although there is no one right way to organize the equipment in a server environment, some require less time and effort to maintain than others.

1- Clustering by Function Gathering machines together based upon what they do can result in either a homogenous or heterogeneous mix of equipment, depending upon whether your company standardizes upon one server manufacturer or not. If it does, the approach is essentially the same as option three, grouping by manufacturer, and therefore has the same advantages and disadvantages. If it doesn't, the approach is probably similar to option two, organizing by business group.

2- Organizing by Business Group in practice it is one of the simplest Data Center organizational plans to manage. For one thing, this approach tends to distribute equipment models throughout the Data Center, which leads to fewer peaks and valleys of infrastructure demand. server rows can be assigned to the manager of each business organization, making them responsible for the upkeep of their own floor space. Example: Group A wants to decommission a dozen older servers and replace them with newer models that require different power receptacles

Be aware that this benefit is reduced if your Data Center has applications or networks that tie equipment together regardless of their physical location in the room. 2- Organizing by Business Group (Cont.)

3- Grouping by Manufacturer While placing all of the same machine models together in a Data Center creates uneven pockets of demand upon the room's infrastructure, this approach can be easy to maintain in the short term. A drawback of having server rows support only one type of machine is that it limits your flexibility when allocating floor space for incoming equipment. Management difficulties can also arise over time when a given type of server either outgrows its assigned floor space or else needs to be decommissioned and upgraded.

4- Not Organizing at All Initially, this approach doesn't require any effort, certainly not on the part of whoever would otherwise have to allocate floor space. Data Center users just move equipment into whatever server cabinet locations are available. As the room fills up, however, problems can emerge. System administrators who maintain servers must work in all areas of the Data Center, and downtime on the part of a networking device might cut off access to machines that are performing many different functions. Problems aren't isolated to a particular group. Also, because no one truly controls how space or infrastructure is allocated, Data Center users might swipe electrical receptacles and data ports from unclaimed cabinet locations or even try to claim more server space than they require. Only consider this approach in very small server environments, perhaps a room with three server rows or less

Planning for Growth You want servers and networking devices to be distributed across the Data Center so that the room is easy to use, equipment is logically arranged, and demands upon the infrastructure are even and manageable assign space in your Data Center—from the beginning—with an eye toward how you want the fully-occupied room to be. Anticipate future equipment growth. Besides setting aside a dedicated growth path outside the server environment, leave empty rows throughout the Data Center as you assign space.

Ex: we have 3 Groups (A, B, C) – Group A doesn't expect any future growth. – Group B has servers to occupy one row, but can't predict whether it is going to need a lot more hosting space in the future or none at all. – Group C has servers to occupy one server row right away and is expected to fill a second row over the next twelve months. The 1 st arrangement: Group A in Row 1, Group B in Row 2, and Group C in Rows 3 and 4 (and every thing is perfect) BUT this will lead to problems. Planning for Growth (Cont.)

It concentrates the heating and electrical load in the Data Center into a small area, which can cause hot spots unnecessarily. It might also trigger nuisance alarms in your power distribution units. clustering the occupied rows together doesn't enable a group to grow into additional rows and yet still remain contiguous Planning for Growth (Cont.)

Allocating floor space so that rows alternate between empty and occupied makes it easier to accommodate future space needs by business groups as well as distributes the draw upon the Data Center's infrastructure. Planning for Growth (Cont.)

Controlling Incoming Equipment the people who buy servers either know or care relatively little about the environment that houses them. They make purchasing decisions based upon the equipment's performance, cost. While all of that is important, little or no consideration is given to whether an item is compatible with the Data Center. To avoid this, establish a review process in which all Data Center-bound items must be examined and approved before they can be purchased. It is much easier to head off potential problems with a device while it is still on someone's shopping list than if it is sitting on your loading dock

Several factors should be considered when reviewing a device for its compatibility with your server environment: – Footprint: Does the item (whether a server cabinet or floor-standing server or storage device) fit conveniently within your server rows? – Power needs: Does the device need power receptacles that are significantly different from what your Data Center typically provides? – Weight load: How much does the item weigh? The more weight that is placed in a small area, the more difficult it can be for a Data Center floor to support Controlling Incoming Equipment (Cont.)

– Serviceability: How easy is it to service or upgrade the device? Servers that are the most Data Center- compatible can be accessed and worked upon while the device remains mounted in a cabinet. – Equipment exhaust: Does the equipment produce an above-average amount of heat? the larger the burden it places upon a Data Center's cooling infrastructure – Wheels: Does the item have casters? If you're evaluating a server that is going to be installed in a server cabinet, you don't want wheels because the item could roll off of a cabinet shelf Controlling Incoming Equipment (Cont.)