The Leaning Tower of Pisa Items that will be discussed: Geology under PisaGeology under Pisa Issues as a result of the geological conditionsIssues as a.

Slides:



Advertisements
Similar presentations
Seismology and Earthquake Engineering :Introduction Lecture 3
Advertisements

Greenwich Peninsula.
The Leaning Tower of Pisa
The Leaning Tower of Pisa What went wrong?!. So What Will We Talk About? A brief history of the tower. Why the structure failed. The reason it still stands.
Foundations Purpose – To transfer weight of structure (including live loads) to the ground within allowable settlement criteria.
By James Scarisbrick, Tom Watkinson & James Yip. Introduction Taipei 101 is a 509.2m tall skyscraper situated in the northern region of Taiwan, in the.
Geology for Engineers The San Andreas Fault: The Geological and Civil Engineering Implications.
Liquefaction, Kobe Earthquake Matt Greaves, Tom Baker.
Geological response to Mexico, 1985 Bruce Ashcroft And Amanda Chapman.
MEXICO CITY’S SINKING CATHEDRAL
Project details • New headquarters for HKSB
- The interaction of the world’s tallest building with the geology of the Basin the city is built in By Matthew Timmis and Mark Banham.
Chapter Six Sediments & Sedimentary Rocks. Sediment Sediment - loose, solid particles originating from: –Weathering and erosion of pre-existing rocks.
Soils and Foundations.
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
Mr. Williams – Grade 7 Science
Earthquake induced LIQUEFACTION by Jimmy McLauchlan Peat Nicholas Case study: Mexico City, 1985.
The leaning tower of Pisa Made by: Andrei. The Tower of Pisa is the bell tower of the Cathedral. Its construction began in the august of 1173 and continued.
Lecture 8 Elements of Soil Mechanics
Foundations and Soil types
Issues to be considered :foundations Professor Chris Gorse and Ian Dickinson These slides should be read in conjunction with Emmitt, S. and Gorse, C. (2010)
Modeling Seismic Response for Highway Bridges in the St. Louis Area for Magnitude 6.0 to 6.8 Earthquakes J. David Rogers and Deniz Karadeniz Department.
CE 486 DEEP COMPACTION Name : Ali Hamood Al-teeb. ID :
Soils Investigation Soil Investigation
Foundation Engineering CE 483
FOUNDATION.
Commercial Foundations
FOFFF.
Mata kuliah: S0892 – Ground Improvement Method Tahun: 2010 Case Study Session
Our Changing Earth The Earth is made up of different kinds of materials, including rocks. Soil, water, and the gases of the atmosphere. Soils have different.
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
Intro to Concrete 18.0 & 19.0 Class notes.
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
The Leaning Tower of Pisa By: Madison Huseth. Construction & Tilt Construction of this campanile began at Pisa was a trading center at the peak.
Soil Mechanics. Tower of Pisa BASICS Official Name: TORRE PENDENTE DI PISA Function: Bell Tower (Campanile) Original Architect: Bonanno Pisano Years Built:
Ground Improvement Issues & Techniques
Bridge Engineering (1) Introduction(1-2) Table of Contents 8. Location of piers and abutmentsLocation of piers and abutments 9. Vertical clearance above.
Liquefaction Liquefaction occurs where ground water is near the surface in soils composed of sands and silts. The soil temporarily loses strength and behaves.
Group 10 – Disaster Project Leaning Tower of Pisa The most successful disaster… Ever!
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
Retaining Walls I. *Introduction
LONG TERM GEODETIC MONITORING OF THE DEFORMATION OF A LIQUID STORAGE TANK FOUNDED ON PILES P. Savvaidis Laboratory of Geodesy Dept. of Civil Engineering.
Properties, Handling and Mixing of Particulate Solids By Sidra Jabeen Department of Chemical Engineering, University of Engineering & Technology Lahore.
The Leaning Tower of Pisa Group 10. La Torre di Pisa The Tower of Pisa is the bell tower of the Cathedral Construction began in August 1173 Work completed.
Roof Terms Span –Distance across the building. Roof Terms Run –1/2 the distance across the building (1/2 span distance)
Modern GROUND IMPROVEMENT TECHNIQUES FOR HIGHWAYS
By Josh Lanier and Triztean Mondragon. The Leaning Tower of Pisa holds a significant place in the world history as well. Famous physician Galileo Galilei.
The Leaning Tower of Pisa
Hoover Dam Construction. Geological Context Canyon’s tilted layers of andersite breccias Extrusive igneous rock Minerals - plagioclase, pyroxene & hornblende.
SOIL MECHANICS AND CLASSIFICATION. FACTORS WHICH HOLD SOIL TOGETHER o Cohesion  Internal Friction.
Faults Earthquakes begin on a fault _________ movement will not proceed smoothly away from the fault due to Changes along the _________and ________ of.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
The Leaning Tower Of Pisa By: Jhaley Rhodes & Will Adams January 4, Th Period.
DIAPHRAGM WALLS.
Subsidence. Land Subsidence Subsidence is human caused in 37 states Subsidence affects 15,000 sq. miles of the United States The cost nation wide is $100.
The Leaning Tower of Pisa Group 10 Martina Flanagan Julian Mannion Anthony McGowan Neil O’Donohoe.
The Leaning Tower of Pisa By Group 10 Joe Reynolds Emmet Friel Trevor McGowan Claire Cassidy
Jet grouting underpinning of a building on a marl embankment platform
APPLICATIONS OF TECHNOLOGY
What building can you see ?
Building Planning and Drawing
PREPARED BY SK SOHEL, CE-3RD YEAR GUIDED BY JAYASHREE SENGUPTA
Arch205 Materials and building construction 1 foundation
Arch205 building construction foundation
REVISION 1 1. Foundations.
Lecturer: Dr. Frederick Owusu-Nimo
Spread Footing Design for Columns
Spread Footing Design for Columns
Graduation Project Bracing system for deep excavation.
Presentation transcript:

The Leaning Tower of Pisa Items that will be discussed: Geology under PisaGeology under Pisa Issues as a result of the geological conditionsIssues as a result of the geological conditions Characteristics of the towerCharacteristics of the tower Construction of the towerConstruction of the tower Inclination of the towerInclination of the tower Monitoring InclinationMonitoring Inclination Seismic activitySeismic activity Management techniques adoptedManagement techniques adopted The possible future optionsThe possible future options SummarySummary

Where is the tower?

Where is Pisa? Tuscany

The River Arno

What does the tower stand on? A Sediments covering bedrockSediments covering bedrock Layer A: ≈ 10m thickLayer A: ≈ 10m thick Fluvium from River Arno Fluvium from River Arno What is fluvium?What is fluvium? Soft, estuarine (river) depositsSoft, estuarine (river) deposits

What does the tower stand on? B Layer B: ≈ 20m thickLayer B: ≈ 20m thick Pancone marine clay Pancone marine clay flat, jumbled, loose particles flat, jumbled, loose particles Very soft and plasticVery soft and plastic Easily deformableEasily deformable

What does the tower stand on? Layer C: Thick layer of dense silty sand C

What are the problems with building on these conditions? Built on soft clay, not rockBuilt on soft clay, not rock Dish shaped basin under towerDish shaped basin under tower 2.5 to 3m settlement!2.5 to 3m settlement! Lean caused by silt on South side being compressed more than on North side.Lean caused by silt on South side being compressed more than on North side. South side silt has Pancone clay mixed in.South side silt has Pancone clay mixed in. Result = differential settlement = badResult = differential settlement = bad

What are the problems with building on these conditions? Built on floodplainBuilt on floodplain High groundwaterHigh groundwater Ground water rises in rainy seasonGround water rises in rainy season Greater rise on North sideGreater rise on North side

Characteristics of The Tower Height from foundations to belfry 60mHeight from foundations to belfry 60m Ring shaped foundation has external diameter of 19.6mRing shaped foundation has external diameter of 19.6m Tower weighs 14,500 tonnesTower weighs 14,500 tonnes The inclination is 5½ degrees towards the south; this means that the seventh cornice protrudes about 4.5m over the first cornice.The inclination is 5½ degrees towards the south; this means that the seventh cornice protrudes about 4.5m over the first cornice.

Construction History The Tower was constructed in the course of about 200 years.The Tower was constructed in the course of about 200 years. Work on the foundation began on 9 August 1173.Work on the foundation began on 9 August The construction of the belfry (8th order) began around 1360 and was completed c. 10 years later.The construction of the belfry (8th order) began around 1360 and was completed c. 10 years later.

Materials Used in Construction The following are the stone types used which come from areas adjacent to Pisa: the Monti Pisani and the Monti d'Oltre Serchio: Agnano BrecciaAgnano Breccia -internal wall facing "Bench" calcarenite"Bench" calcarenite -vaults and arches Filettole black limestoneFilettole black limestone -ornamental bands "Flinty" limestone"Flinty" limestone -concrete filling

Materials Used in Construction "Verrucano" quartzite"Verrucano" quartzite -used in foundation concrete GranodioriteGranodiorite -half base columns San Giuliano marbleSan Giuliano marble -most used incl. external walls

Re-emphasis of Subsidence Tower subsided vertically by 2.8mTower subsided vertically by 2.8m The differential subsidence is 1.89m; this means that the extreme north and south have subsided by 1.86m and 3.75m respectively.The differential subsidence is 1.89m; this means that the extreme north and south have subsided by 1.86m and 3.75m respectively.

Inclination of the Tower Progressive increase in inclination can be attributed to the instability of the equilibrium + the viscous plastic response from the ground.Progressive increase in inclination can be attributed to the instability of the equilibrium + the viscous plastic response from the ground. Increase in rotation induces increase in tendency to capsize; in turn, increases stresses + deformations and therefore a further increase in rotation.Increase in rotation induces increase in tendency to capsize; in turn, increases stresses + deformations and therefore a further increase in rotation – 1974 intense pumping of water from the subsoil led to an increase in the rate of rotation of the tower.1968 – 1974 intense pumping of water from the subsoil led to an increase in the rate of rotation of the tower.

Monitoring the Movement of the Tower Since 1913 – geodetic measurementsSince 1913 – geodetic measurements Since 1934 – Girometti-Bonechi pendulumSince 1934 – Girometti-Bonechi pendulum - civil engineers spirit level - civil engineers spirit level Since 1991 – accurate internal optical systemSince 1991 – accurate internal optical system - automatic system with sensors for the measurement of: - automatic system with sensors for the measurement of: 1.Wind 2.Air temperature 3.Seismic actions 4.Inclinations 5.Horizontal point movement 6.Width of the fissures 7.Levels within the stratum

Seismic Activity Area around Pisa has been subject to strong seismic activity.Area around Pisa has been subject to strong seismic activity. Studies estimate a grade 6 earthquake (Mercalli scale) has probability of occurrence every 130yrs.Studies estimate a grade 6 earthquake (Mercalli scale) has probability of occurrence every 130yrs. Grade 7 probability of occurrence every 520yrs and grade 8 once over 3000yrs.Grade 7 probability of occurrence every 520yrs and grade 8 once over 3000yrs. Analyses of response of towers show - limit would be reached in a grade 6 earthquake.Analyses of response of towers show - limit would be reached in a grade 6 earthquake. It would not survive a grade 7 earthquake undamaged.It would not survive a grade 7 earthquake undamaged.

Management of the Tower Professor John BurlandProfessor John Burland Currently responsible for the status of the tower.Currently responsible for the status of the tower.

Management Solutions Adopted 600 tonne lead ingots applied in 1993 – modest reduction of the inclination and arrested progressive rotation of tower.600 tonne lead ingots applied in 1993 – modest reduction of the inclination and arrested progressive rotation of tower.

Management Solutions Adopted Safety stays – correct unexpected small movements (temporary safeguard during works).Safety stays – correct unexpected small movements (temporary safeguard during works).

Management Solutions Adopted Soil extractionSoil extraction Involves placing tubes on the North side of the tower to remove soil.Involves placing tubes on the North side of the tower to remove soil. Modelling and trials to determine the exact placement of the tubes.Modelling and trials to determine the exact placement of the tubes. Special drill designed to avoid disturbance to surrounding ground.Special drill designed to avoid disturbance to surrounding ground.

Management Solutions Adopted Preliminary soil extraction over limited width in February 1999.Preliminary soil extraction over limited width in February Full soil extraction takes place over the full width of the foundations in February 2000.Full soil extraction takes place over the full width of the foundations in February Soil extraction finished in June 2001.Soil extraction finished in June 2001.

Management Solutions to be Adopted in the Near future Anchorage – medium intervention intended to substitute the weights, reducing the unsightliness of counter-weighting.Anchorage – medium intervention intended to substitute the weights, reducing the unsightliness of counter-weighting.

Possible Future Management Techniques Electro-osmosis – clay contracts upon absorbing electrical current under north of tower causes subsidence of base.Electro-osmosis – clay contracts upon absorbing electrical current under north of tower causes subsidence of base. Has been tested in a full-scale experimental site.Has been tested in a full-scale experimental site.

Summary Lean is caused by differential settlement of silt under tower.Lean is caused by differential settlement of silt under tower. Lean is also caused by uneven rise of groundwater.Lean is also caused by uneven rise of groundwater. Many attempts to correct lean.Many attempts to correct lean. The most recent and successful being soil extraction.The most recent and successful being soil extraction.