Retail Market Guide Updates.  ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their.

Slides:



Advertisements
Similar presentations
Market True-Up Discussion RMS Meeting 03/13/02 Draft Only for Discussion Purposes.
Advertisements

Retail Market Subcommittee Update to TAC Kathy Scott January 28,
AMS DATA WORKSHOP III TDSP UPDATE September 19,
Inadvertent Gain Overview February Introduction Why we are here –Original Inadvertent Gain (IAG) Task Force (2004) Creation of Retail Market.
1.  An inadvertent issue begins upon the discovery of an Inadvertent Gain or Move-In transaction submission. Upon identification of an Inadvertent Gain.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
1 Nodal Stabilization Market Call December 28, 2010.
Retail Market Subcommittee Update to TAC Kathy Scott April 24,
1 Update to RMS December 8, Texas SET 4.0 Change Controls
ERCOT MARKET EDUCATION
Retail Market Subcommittee (RMS) Update Kathy Scott January 3, 2013Technical Advisory Committee 1.
814_20 – Substation ID updates Background and Proposed Action Plan TX SET – 10/25/07.
RMS Update to TAC January 3, Goals Update ► Complete and improve SCR745, Retail Market Outage Evaluation & Resolution, implementation and reporting.
1 Market Trials Outage Scheduling Weekly Update July 23, 2010.
1 Market Trials Outage Scheduling Weekly Update July 09, 2010.
Lead from the front Texas Nodal 1 Registration Market Call Apr 10, 2009.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
Retail Market Subcommittee Update to COPS Kathy Scott July 16,
Market Impact Assessment TF Final Report to RMS June 11, 2008.
SHARYLAND TRANSITION TASKFORCE (STTF) AGENDA STTF MEETING AUGUST 21,
1 Nodal Stabilization Market Call December 21, 2010.
Retail Market Subcommittee Update to TAC Kathy Scott February 27,
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
1 Cutover Market Call December 01, :30 AM.
1 Nodal Stabilization Market Call December 06, :30 AM.
1 PWG Update Report By Ed Echols Of Oncor ERCOT PWG Chair Jim Lee of Direct Energy ERCOT PWG Vice Chair for COPS Meeting Sept 10, 2014.
ESI IDs Retired in Error! RMS – August 10, 2005 Discussion.
RMS Update to TAC April 7, RMS Voting Items  RMGRR032- Transaction Timing Matrix Corrections Includes updates to Appendix D to correct examples.
TX SET v2.1 Implementation Plan. Table of Contents A.Shut Down Procedure B.Shut Down Timeline Details C.Conference Calls D.Additional Contingencies.
Texas SET Version 3.0 Production Implementation Plan.
1 Market Trials Outage Scheduling Weekly Update July 02, 2010.
Retail Market Subcommittee Update to COPS Kathy Scott March 17,
1 RMS Update on Move-In / Move-Out Task Force November 14, 2002.
ERCOT MARKET EDUCATION Retail 101. Retail Transaction Processing.
MISUG Meeting Materials Jackie Ashbaugh/Jamie Lavas ERCOT 2/22/2011.
RMS/COPS Workshop VI 1 October 06, Antitrust Admonition ERCOT strictly prohibits Market Participants and their employees who are participating in.
MARS Advanced Metering – ERCOT Market Facing Changes Jackie Ashbaugh Manager Data Integrity and Administration 3/9/2009.
1 Linked-Service Address Discussion Thursday - April 8, 2004 (Updated 4/12/04 to include meeting results) Airport Hilton - Austin.
1 Market Trials Outage Scheduling Weekly Update June 11, 2010.
814_20 – Substation ID updates Background and Proposed Action Plan RMS – 11/07/07.
Distributed Renewable Generation Profile Implementation Plan.
SHARYLAND TRANSITION TASKFORCE (STTF) AGENDA STTF MEETING APRIL 17,
Retail Market Subcommittee (RMS) Update Kathy Scott April 9, 2013Commercial Operations Subcommittee 1.
MISUG Meeting Materials Jackie Ashbaugh/Jamie Lavas ERCOT 1/13/2011.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
1 Nodal Credit Update at WMS June 16, 2010.
1 TX SET Mass Transition Project RMS Update March 15, 2006.
14 Minute Ramp Period Testing Workshop June 30, 2009.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
1 Cutover Market Call November 27, 2010.
1 Nodal Stabilization Market Call December 27, 2010.
MIMO Stacking Document and the current RMG are inconsistent with current logic and should be updated.
SHARYLAND TRANSITION TASKFORCE (STTF) UPDATE UPDATE TO RMS APRIL 1,
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
1 Texas Data Transport & MarkeTrak Systems (TDTMS) Update to RMS March 1, 2016 Jim Lee (AEP) – Chair Monica Jones (NRG) – Vice Chair.
RMGRR058 Overview RMS Meeting – August 15, Background / Reference PUCT Substantive Rule 25.43(n)(8) Protocol Customer Billing Contact.
Mass Transition Lessons Learned. Should the FASD (First Available Switch Date) be revised for Mass Transition Projects? We need a better definition of.
1 TX SET Update to RMS August 13, Issues Under Review I075 – CSA-By Pass flag is being used by CRs when they do not have a CSA established I075.
Mass Transition—Timelines & Volume Limitation RMGRR116—Acquisition Transfer Non-standard Metering Future Meetings 1.
1 Cutover Market Call November 28, 2010.
Lead from the front Texas Nodal 1 Registration Market Call Nov 21, 2008.
1 Nodal Stabilization Market Call December 02, :30 PM.
1 Market Trials Outage Scheduling Qualifications Weekly Update March 26, 2010.
1. ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their participation in ERCOT.
1 Supporting materials for RMS Provided by Retail Customer Choice (RCC) team.
Mass Transition of TDSP ESI IDs from Sharyland Utilities to Oncor
AEP ONCOR TNMP CenterPoint
Pro-Active Transaction Resolution Measures
Pro-Active Transaction Resolution Measures
Usage Billing Issues.
Presentation transcript:

Retail Market Guide Updates

 ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their participation in ERCOT activities as a forum for engaging in practices or communications that violate the antitrust laws. The ERCOT Board has approved guidelines for members of ERCOT Committees, Subcommittees and Working Groups to be reviewed and followed by each Market Participant attending ERCOT meetings. If you have not received a copy of these Guidelines, copies are available at the Client Relations desk. Please remember your ongoing obligation to comply with all applicable laws, including the antitrust laws 2

 All presentations and materials submitted by Market Participants or any other Entity to ERCOT staff for this meeting are received and posted with the acknowledgement that the information will be considered public in accordance with the ERCOT Websites Content Management Operating Procedure. 3

 PUCT Project  Project opened July 2009  Final Approval April 1 st, 2010 with a July 1 st effective date 4

 5

6

7

8

 9

10

11

 Meter Tampering Task Force  Formed by RMS in January 2010  Tasked with updating Retail Market Guide for July 1 st processes and developing long-term solutions  RMGRR 087 is result of Task Force meetings ▪ Created RMG Section 7.16 to deal with meter tampering issues 12

14

15

16

18

19

 MVI  Complete Unexecutable (814_28) with reason code “T019”  If hazardous conditions exist TDSP may disconnect service ▪ Notify REP via 650_04 with reason code “TM001” 20

 MVO  CNP, AEP, and TNMP ▪ If no safety issue the MVO will be completed ▪ If a safety issue exists ▪ Complete Unexecutable (814_28) with reason code “T019” ▪ If a disconnection of service is necessary the REP will be notified via 650_04 with reason code “TM001” 21

 MVO  Oncor ▪ Will hold MVO request for internal review of tampering situation ▪ Depending on outcome of review  MVO will be completed  Complete Unexecutable (814_28) with reason code “T019”  If a disconnection of service is necessary the REP will be notified via 650_04 with reason code “TM001” 22

 DNP  If tampering does not create a hazardous condition DNP will be completed  If unsafe condition exists TDSP may ▪ Complete DNP from an alternate location; or ▪ Not complete DNP and send REP 650_02 with reason code “T019”; or ▪ Suspend service, remove meter, and send REP 650_04 with reason code “TM001” 23

 RNP  If tampering does not create a hazardous condition RNP will be completed  If unsafe condition exists TDSP may ▪ Not complete RNP and send REP 650_02 with reason code “T019”; or ▪ Suspend service, remove meter, and send REP 650_04 with reason code “TM001”  All existing DNP/RNP rules and processes remain in effect 24

 TDSPs will have either an , website, or phone number available for REPs or Customers to report Tampering Website or Telephone AEPwww.ReportPowerTheft.com CNP or toll free Oncorwww.oncor.com SULP

 Upon determination of tampering TDSPs will provide cancel/rebill transactions for impacted prior period 867 and 810 transactions  Rebilled usage will be coded as Estimated usage with reason code “04”  Rebilled invoices will reflect changes due to tampering with any additional tampering/meter replacement charges on the last billing period

 Upon determination that tampering has occurred TDSP will place a switch-hold on the ESIID  Only the TDSP may place the switch-hold on an ESIID  Switch-hold is tied to the premise not the customer  Switch-hold will stop any switch or move-in from occurring on the ESIID 27

 TDSPs will provide two switch-hold lists each business day  Primary List ▪ Includes all ESIIDs currently with switch-hold flag in TDSP systems ▪ Available to all REPs  Secondary List ▪ Includes all ESIIDs currently with switch-hold flag for a single REP ▪ Available only to the REP whose customers are on the list 28

 File locations:  CNP – ftp.centerpointenergy.comftp.centerpointenergy.com  Oncor – ftp.oncor.comftp.oncor.com  AEP – distribution and  TNMP – ftp.tnmp.comftp.tnmp.com  Sharyland – ftp site in development 29

 Utilize existing ftp sites and processes  Existing ftp username and passwords will provide access  Oncor ▪ Top level folder accessible by all REPs will contain primary list ▪ REP specific sub-folders will contain secondary lists  Centerpoint ▪ Both primary and secondary lists will be posted in the REP of Record folder 30

31

32

33

 TNMP & Sharyland  Creating new ftp sites with usernames and passwords to be distributed to REPs prior to July 1 st ▪ For TNMP username and password send an request to  Will use the same two level structure being utilized by the Oncor ftp site 34

 Lists will be posted by 9:00am CST each business day  List format is defined in RMG Appendix J1  ESIID  Switch-hold Start Date  File Naming Conventions  Primary List ▪.txt ▪ SWITCHHOLD txt  Secondary List ▪.txt ▪ SWITCHHOLD txt 35

 What if there are no accounts on switch-hold?  All TDSPs will post files that are blank  What happens if there is a system error and a file isn’t posted for a day?  All TDSPs will post the next day’s file, there will not be two files or any archive files  What is going to be in the files on July 1 st ?  CNP, Oncor, and TNMP will have blank files  AEP will have data in their file 36

 Switches  TDSP shall reject the request by sending the 814_04, Switch/Move-In CR Notification Response, with the reason code “A13” and “SWITCH HOLD” in the text description field  REP will receive 814_05 Reject Response, with the reason code “A13” and “SWITCH HOLD” in the text description field  No method for removing Hold for a switch except by the REP of Record 37

 MVI  TDSP shall reject the request by sending the 814_04, Switch/Move-In CR Notification Response, with the reason code “A13” and “SWITCH HOLD” in the text description field  REP will receive 814_05 Reject Response, with the reason code “A13” and “SWITCH HOLD” in the text description field 38

 MVI  TDSP shall reject the request by sending the 814_04, If 814_05 Accept has already been sent prior to determination of tampering; TDSP will Complete Unexecutable (814_28) with reason code “T019” ▪ Oncor only> If the MVI scheduled prior to the Tampering Determination is within 36 hours of the scheduled date, the MVI will complete. 39

 RMG Section defines a detailed process for removing a switch hold for a valid MVI request  MarkeTrak will be the only way that a removal of a switch hold for a MVI request will be processed  No s, spreadsheets, or other off-line processes 40

 Request to remove switch hold must include two documents  One of these documents ▪ Copy of signed lease; ▪ Affidavit of landlord; ▪ Closing documents; ▪ Certificate of occupancy; or ▪ Utility bill, in the Customer’s name, dated within the last two months from a different Premise address  New Occupant Statement ▪ Found in RMG Appendix J2 41

 What if the customer doesn’t have one of those documents?  PUCT rule allows the use of “comparable documents”  What is a comparable document? ▪ Establish residency of customer at a premise (positive or negative) on a specific date  TDSPs prefer documents off the list, use of other documents will be “messy” 42

 Timelines  Entire process must be completed within 4 hours  REP of Record has one hour from receipt of MarkeTrak issue to reply ▪ Failure to meet this timeline requirement will result in removal of switch hold without exception, with no recourse for the REP of Record  Gaining REP has 30 minutes to transition issue between TDSP and REP of Record ▪ Failure to meet this timeline requirement can result in rejection of removal of switch hold request 43

 6 Step Process 1. Gaining REP creates MarkeTrak issue and assigns to TDSP 2. TDSP can accept or reject issue; assigns to Gaining REP with REP of Record identified in response 3. Gaining REP assigns to REP of Record 4. REP of Record can agree or disagree; assigns to Gaining REP 5. Gaining REP assigns to TDSP 6. TDSP makes final determination; assigns to Gaining REP 44

45

 REP of Record Request  Per (h)(1) in new PUCT rule language, “The REP via a standard market process shall submit a request to remove the switch-hold once satisfactory payment is received from the retail customer for the back-billings and meter repair and restoration charges.”  REPs will use MarkeTrak process defined in RMG

 By 1500 each Business Day, the REP of Record may submit a MarkeTrak issue to the TDSP to remove the switch hold and to remove the ESI ID from the next Business Day’s switch hold list provided by the TDSP per Section , Transmission and/or Distribution Service Provider Switch Hold Notification, using the following process:  Create an individual MarkeTrak issue for each ESI ID to be removed from the switch hold list using the “Other” subtype;  Include the number “71644” in the ISA Number field of the MarkeTrak issue;  Populate the ESI ID field; and  Assign the issue to the TDSP. 47

 The TDSP, upon receipt of MarkeTrak issue, will perform one of the following:  Remove the switch hold; or  Reject the issue due to the following: ▪ Incorrect MarkeTrak issue subtype; ▪ Incorrect ISA Number or ISA Number field is not populated; or ▪ Incorrect ESI ID or ESI ID field is not populated. 48

 MVO  TDSP will remove a switch-hold from an ESIID upon completion of a Move-Out Request  Sending a MVO after DNP will remove the Switch Hold  CSA  Upon receipt of a move-out to Continuous Service Agreement (CSA) for an ESIID under a switch-hold, the TDSP shall remove the switch hold upon completion of the move-out and then complete the CSA move-in 49

 POLR  TDSP will remove switch hold on any ESIIDs that are part of the Mass Transition event; and  TDSP will provide CRs (both POLR and non-POLR) a list of ESIIDs that previously had a switch-hold due to tampering in which the switch-hold was removed as a result of the Mass Transition event  DNP  Does not remove Switch Hold  All existing DNP/RNP rules remain in effect 50

 Centerpoint, TNMP, and Sharyland  Utilize ftp sites with same folders to post files to REP of Record  AEP  Utilize the Online Self-Service Portal with documents posted in the same manner of the switch hold lists  Oncor  Utilize Online Self Service Portal 51

53

54 Michael Maria