What we found Benefits n Annual benefits = 9% to 16% of system cost n Most (60% - 70%) come from meter reader staff reductions. n Considerable stakeholder.

Slides:



Advertisements
Similar presentations
© USCL Corporation - All Rights Reserved USCL Corporation 2737 Eastern Avenue Sacramento, California A managed approach to the successful.
Advertisements

DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
Deployed AMI Value – Real World Examples Scott Durham Vice President, Strategic Accounts Elster Integrated Solutions.
Home Area Networks …Expect More Mohan Wanchoo Jasmine Systems, Inc.
NECPUC Symposium Central Maine Power: Transforming the Customer Experience with AMI June 11, 2013.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
AMR/MMR And Tamper Detection Alan Chapman SCRPA/SURPA/IURPA Conference Atlanta, GA June 18 – 21, 2002.
11 Rate Design to Complement AMI Implementation in Danville, Virginia Presentation by Denise Sandlin Support Services Director Danville, VA APPA 2009 Business.
ANALYTICS: BRINGING VALUE TO THE UTILITIES IN MITIGATING ENERGY LOSSES José-Manuel LOPEZ Istanbul, May 9, 2014.
© CRISP Technologies CRISP Technologies introduces InvoiceCheck ® “Your Automated Invoice Processing Solution”
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
City of Leesburg AMI Project Paul Kalv, Leesburg Electric Director Doug Handley, Utility Consulting Services Advanced Metering Infrastructure – AMI.
Manaen Srigiri James Abhilash DEMAND RESPONSE ___________________________ OUR RESPONSE TO CRITICAL CHALLENGES.
SmartMeter Program Update - Operational Benefits Realization - Jim Meadows, Program Director August 2007.
Bernie Neenan Technical Executive City Light Review Panel Meeting January 31, 2012 AMI Presentation.
Advanced Metering Infrastructure
SMART REGULATORY APPROACH FOR SMART GRID INVESTMENTS Barbara R. Alexander Consumer Affairs Consultant 83 Wedgewood Dr. Winthrop, ME (207)
1 Demand Response Implementing Demand Response and AMR / AMI Systems used by the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and.
Economic Aspects of Information Systems Updated 2015 MIS 2000 Information Systems for Management Instructor: Bob Travica.
1 Department of Water and Power City of Los Angeles Automatic Meter Infrastructure Program Mariko Marianes and John Yu.
Today’s Enterprise Energy Management Systems: What to look for…. Mark A. Noyes CEO and President Cambridge, Massachusetts.
Solar Metering and Performance Monitoring Exposition June 4, 2007.
1 Demand Response Update April, Strategic Perspective Demand Response  Aligns with PGE’s Strategic Direction; helping to provide exceptional.
1 SmartMeter™ Delivering Customer Benefits Jana Corey Director, Policy Planning Integrated Demand-side Management Pacific Gas and Electric Company.
Getting ready for Advanced Metering Infrastructure Paper by : Rajesh Nimare Presented by : Prashant Sharma.
AMPY Next generation Pay As You Go – two – way communications and much more!
Smart Grid APPA Annual Meeting Kiah Harris Burns & McDonnell June 15, 2009.
Future of Smart Metering Kansas Renewable Energy & Energy Efficiency Conference September 26, 2007.
1 AMI’s place in the future AMI is THE key enabler for the future smart grid The ‘intelligent grid’ is not intelligent without AMI Customers are not empowered.
1 Billing, Metering CRM/CIS America 2004 Transition Strategy: Manual Field Data Collection to AMR Implementation Chuck Session Manager, Cinergy Meter Reading.
MEC: Customer Profitability Models Topic DSM – DR, Advanced EE and Dispatch Ability Jesse Langston, OG&E Oct 20 th 2013.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
Making Managed Services Easier Presenter: Greg Henderson Director, International.
Seattle City Light – AMI Business Case Results
AEP’s “gridSMART” Project Ohio Roll Out Strategy PUCO Staff Workshop December 13, 2007.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
The Secrets to Successful AMI Deployment – The Ontario Experience Paul Murphy, President & CEO Independent Electricity System Operator February 19, 2007.
April 11, 2005 Metering, Billing, CRM/CIS America Conference Valuation & Funding Issues with Demand Response Deployments.
Maureen Trumble Jack Hobbick AMI – Providing the Smart Grid Foundation.
Getting Ready for Advance Metering Infrastructure.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Advanced Metering Infrastructure (AMI) Project Update Mark Heintzelman June 2010.
Smart Grid Workforce Education Presentation Smart Grid – A Framework for Change Brad Gaskill, CEO - Poudre Valley REA May 29, 2009.
CEC 08-DR-1 Efficiency Committee Workshop 3/3/08.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
Hugh D. Baker, Jr. AMI Open Standards. AMI Value Propositions  Operational efficiencies  Do more with less  Improving reliability  Outage detection.
Marisa Miralles Vice President, Business Development Information Intellect Going Beyond AMR: Using AMR as a Customer Service Tool- it’s not just for eliminating.
Consumers Energy Advanced Metering Infrastructure Review and Feedback Utility AMI / Open HAN Meeting August 15, 2007.
Utility Benefits of Demand Response Trevor Lauer DTE Energy Marketing Executive Conference Coeur d’Alene, Idaho.
CEC Public Workshop Order Instituting Informational and Rulemaking Proceeding (08-DR-01) March 3, 2008.
Metering Americas April 24, 2006 Advanced Metering.
ELECTRICITIES – INTRO TO AMI Brad Kusant – Area Manager 8/19/2014.
BGE Smart Grid Initiative Stakeholder Meeting September 17, 2009 Wayne Harbaugh, Vice President, Pricing and Regulatory Services.
CURRENT ® Smart Grid Overview July SMART GRID = ENHANCED FUNCTIONALITY Smart Grid delivers more than advanced metering infrastructures: -safe.
MEPAV 2010 CONFERENCE. AMI MANASSAS Gregg S. Paulson, P. E
Introduction to the Electric System
First, there were blackouts
Unitil Customer Facing Technology
Allegheny Power Residential Demand Response Program
Why AMR Which network assets are overloaded or underutilized? What is the correlation between overloading and equipment breakdown? Which areas have the.

April 19, 2017 WB/DB vs. FlexNet Jeff miller.
Understanding the AMI Deployment/ Upgrade Process and Ensuring Quality Relationships with Your AMI Vendor July 2018.
Electricity Demand Response and Advanced Metering for Integrated Utilities Arkansas Public Service Commission Lonni Dieck AEP May 24, 2007.
Southern California Edison Sacramento, California 95821
Advanced Metering Infrastructure Smart Meters
Presentation transcript:

What we found Benefits n Annual benefits = 9% to 16% of system cost n Most (60% - 70%) come from meter reader staff reductions. n Considerable stakeholder interest in/ benefits from service disconnect, on-demand reads n Very little stakeholder interest in distribution system enhancements, theft/ tamper detect n Many benefits were identified which are not included in benefit estimates

What we found (continued) n Technology evolution –Several suitable, proven systems available –New features & technologies continue to emerge n AMI fixed networks still cost > $100 / point n Many utilities are expanding the use of their AMI data to obtain additional benefits n Identified most promising AMI options

AMI System Capability Summary n What we can & can’t do with AMI … Monthly billing Advanced metering Monitoring & control Interactive demand response Drive-by 1-way2-way Fixed networks Monthly billing -Monthly meter reads -Water/ gas reads Advanced metering -On-demand reads -Rate choices -Tamper/ outage detect -Water/ gas reads -Remote programming -Service disconnect -Hourly data Monitoring & control -Direct load control -End-of-line voltage monitoring -Capacitor control -Distribution automation -Wet basement alarm -Other customer services Interactive demand response -Critical peak pricing with market responsive signals to customers -Other customer-interactive rates & services

Candidate Deployment Scenarios n Full deployments –Fixed network(FN) »Advanced 2 way FN - home automation, load control, RTP »Basic 1 or 2 way FN –Drive-by system n Partial deployments –FN for all new customers –1-way drive-by for all new & “hard to read” customers n For all scenarios independently assess costs for- –Service disconnect –Additional load control (new devices & expanded ACLM program) –Water/ gas meter read capability

Financial Perspective n Swiftest payback –ERTs for all new service (minimal commitment) –Rapid saturation deployment (max commitment) n Should solicit business planning support for financial analyses of multi-year deployment options

Conclusions n AMI is compelling –Many mature systems exist –Significant operational benefits –Customer satisfaction, rate choices, lower rates, etc n One way radio FN’s offer the best value –All foreseen functionality at the lowest cost –Expandable, flexible n Partial deployments only make sense for high cost/ benefit groups n Rapid deployments produce fastest payback, but benefits will accrue from a staged approach n The state’s DR initiative could result in more standardization, lower cost

AMI System Unit Cost Notes Figures shown include hardware, software, installation, billing integration, training, vendor deployment support. Costs vary widely, figures shown are approximate, middle-of-range, for estimating purposes only. Actual values will vary substantially with size of project, geography, customer density, functional requirements, meter inventory, corporate strategy, and many other factors. Drive-by does not always cost less than fixed network. A power line system may be less costly than a radio system. O&M costs (not shown) vary widely and appreciably affect annual net benefit. Product status, risks, performance and other factors vary widely and often have cost & benefit consequences. Assumptions Saturation deployment. Typical mix of single-, network- and poly-phase meters. 50/50 meter retrofit/replacement. System cost ($ per meter) Drive-by (radio) Power Line Fixed Network Radio Fixed Network ~$110 - $170 ~$100 - $150 ~$50 - $80