Railway Engineers Forum Scotland Young Railway Professionals’ Presentation Competition Northwich Diversion Gauge Clearance William Storey Graduate Civil.

Slides:



Advertisements
Similar presentations
Portal Framed Construction
Advertisements

Infrastructure Projects 1 FHR6 Blockade Works 12th August 2013 Network Rail & Northern Rail Co-ordination Meeting.
PURBECK RAILWAY CIRCLE
Plot 54 Doornkraal Polokwane 0700 P/Bag X9676 Postnet Suite 141 Polokwane 0700 Tel: ; Fax: ;
Lakes Creek Road Waste Transfer Station – High Level Overview Ben McMaster AECOM Rockhampton 13 March 2014.
By Rowan Bell Graduate Electrical Engineer, Interfleet Technology Ltd An Overview of the Electrical Design Process of Interfleet Technology’s IMechE Railway.
Luas Cross City Main Infrastructure Works April 2015.
Civil Engineering in Surface Transport Mark Dewhirst and Alex Wilson Engineering Graduate Forum – 1 st July 2011.
MOVING OF PRODUCTS. MOVING PRODUCTS The movement of products connects places to one another. Airplanes carry passengers, but they also deliver cargo or.
Ontario International Transport and logistics Chapter 7: Rail and Intermodal.
1 Rehabilitation of the track formation layer with the RPM 2002 in Romania Using high-output track formation rehabilitation machine.
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING Module 7 Engineering Overview.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Delivers top speed of 90 mph in North Wales for first time Partnership funding £500k Welsh Assembly, circa £1m Railtrack Major investment in track, signalling,
1 Satisfiability Testing in the Railway Industry Simon Chadwick Head of Research Westinghouse Rail Systems Limited, Chippenham, UK SAT2009 Twelfth International.
IRSC Vancouver 2013 Theme 1 - Components of a Robust Safety Management System Vancouver, Canada 8 October 2013 Vancouver, Canada 8 October 2013 Why is.
Road Pavements Forum Structural Design Working Group Revision of the South African Flexible Pavement Design Method 7 November 2006 Pretoria H L Theyse.
ZAPDOR
THE SOUTH WESTERN RAILWAY Twickenham Station Platform Improvements 29 th January Twickenham Stadium.
Constructionsite Roles in Construction Ron Gatepain.
1 Broken Hill Solar Plant Community Information Session 1 July 2015.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
INDIAN RAILWAY VISION CAPACITY CREATION BY More than 30,000 kms of route would be double / multiple lines (compare to around 18,000 kms today).
Ballast Migration – Progress 7 March 2013 Presentation by Louis Le Pen Researchers: Louis Le Pen and Geoff Watson.
1 Content 1.Summary of the Korea High Speed Railway Project 2.EIA System in Korea 3.Limits of Present EIA System 4.Tasks for the Betterment Content 1.Summary.
How to Crew a Show in the Annex Chris Duncan Tuesday 11th October 2011 StageSoc Training
Structural Health Monitoring of Steel Bridges Pradipta Banerji Professor of Civil Engineering, IIT Bombay CE 152 LECTURE.
Masonry Arch Bridge Reinforcement – ‘XiSPAN’ Matt Hunt
Simon Kirby Director, Infrastructure Investment. Our inheritance Network Rail took over the railway infrastructure in 2002Network Rail took over the railway.
Redditch Branch Enhancement. Introduction Roger Clarke – NWR Project Manager Roger Clarke – NWR Project Manager Bob Aldridge – NWR Scheme Project Mgr.
A LOOK AT CIVIL ENGINEERING By: MK Pegram. David Pegram- Civil Engineer  Graduated from UNC-Charlotte with a Civil Engineering degree in December 2010.
Mexico 1 Plant VI ~ “H” Line Core Room ~ Cell 2 ~ FM 5.0L V8 Block Line Process ~
Chris Duncan Tuesday 11 th October 2011 StageSoc Training
CHAPTER 23 Delivery and transport systems. 2 R. Delaney Transport / Delivery Systems A good transport and delivery system is essential to ensure: 1.Safe.
Training Theory. Topics Macro Approach to Speed Development Year broken down into 3 periods –General Prep –Specific Prep –Competition Period Within each.
DIFFERENCES BETWEEN BESMM 3 & 4
NIQS – TRAINING ON BESMM4
Modernization of Track for High Speeds. Modernization Transport more passengers/goods at high speed, safe, economic.
The Design Tool for Civil Engineering projects – an overview Phil Birch & Susan Steensma Cyril Sweett
Student name: ………………………………………….…. Course of study: (Please tick)  Subsidiary Diploma(pt)  Extended Diploma(ft)  Diploma (ft Yr 2) Unit 51 Civil Engineering.
CIHT Midland Branch Paper Competition 2010/2011 Moorgate Track Slab Helena Turner Pavement Consultancy Helena Turner Slide 1.
Why is Rail Safety Important to me?
Sustainable maintenance of high-speed lines with mixed traffic
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
2015 monthly calendar template
Coal Line Longitudinal
Presentation Title: View > Header & Footer
Time Revision.
به نام خداوند خورشید و ماه
October 2011 October 2011 Name: __________________________
November 2011 November 2011 Name: __________________________
Blank Food Diary template
Blank Fitness Diary template
MON TUE WED THU
GANTT CHARTS Example Text Text Here Text Here Text Here Text Here
Rail Safety Summit Work Staging and Planning
Academic Calendar Click to add notes
2008 Calendar.
Delivering work safely in limited time windows
Academic Calendar Click to add notes
Sun Mon Tue Wed Thu Fri Sat
2009 monthly calendar template
Sun Mon Tue Wed Thu Fri Sat
Regional Committee Meeting Southeastern Michigan
Name: ______________________________
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Sun Mon Tue Wed Thu Fri Sat
2008 Calendar.
Life Cycle Costing.
Presentation transcript:

Railway Engineers Forum Scotland Young Railway Professionals’ Presentation Competition Northwich Diversion Gauge Clearance William Storey Graduate Civil Engineer - Babcock

Contents Project background Works overview Delivery plan –Track works –Drainage My role

Project background The Northwich Diversion route was cleared to W8 gauge to enable freight traffic to be diverted allowing for access on the Liverpool to Manchester line to carry out electrification works. This involved 5 track lowers at 4 bridges.

Project contracts GRIP 3-8 –NR4 for GRIP 3-5 –NR9 for GRIP 6-8 Project came off the back of Liverpool to Manchester (phase 1) which was a number of track lowers on the line being electrified Contract value –Northwich Diversion circa £600k –Total value of Liverpool to Manchester and Northwich Diversion circa £1million Project awarded 17 weeks before 1 st core possession The work was delivered in November 2011

Track lowering works StructureOB07OB08OB45OB46 LineUp MainDn MainUp MainDn MainUp Main Max Lower (vertical) 300mm34mm198mm263mm148mm Lower extents (horizontal) 230m110m with 540m of realignment 230m240m250m Rail50% - reused 50% - renewed renewed reused Sleepers50% - reused 50% - renewed reusedrenewed

Delivery plan Wk 29 –Sun 00:10 – Sun 09:15 (Prep) –Tue 00:30 – Tue 05:30 (CWR drop) Wed 00:30 – Wed 05:30 (Prep / Drainage investigation) –Thur 00:30 Thur 05:30 (Prep / Drainage investigation) Wk 34 –Sat 00:05 – Mon 06:30 (Core works – Up main) Wk 35 –Sat 00:05 – Mon 06:30 (Core works - Dn main) –Midweek Speed off tamps 00:30 – 05:30 (Mon, Tue, Wed & Thur night) Wk 36 –00:15 Sun – 06:00 Mon –Follow up works (Welding, Stressing, Snagging for TOC)

OB08 (Dn Main) Effectively a single line under the bridge KIROW 250 used to Panel out and in 60ft sections

OB08 Staging Hale Crossover UM DM ← Ashley StationHale Station → 6Y16 Sat 00:15 - Sat 22:00 LOCO,10 LD Autohopper 6Y17 Sat 01:00 - Sun 15:00 LOCO, Support, KIROW, Runner, 3MT Salmons, 1MT Tench, 10MT Falcons, LOCO (from site only) 1.Trains access from Northenden 2.KIROW lifts out panels onto 6Y17 3.Scarify, grade and compact using 2 X PC138, D41 Dozer and Triple Whacker. Load into 6Y17 (10MT Falcons) 4.KIROW relay panels from 6Y17 5.Unload bottom stone from 6Y17 and profile using 2 X PC138 and RRV 6.Tamper site 7.Re-rail panelled section using McCulloch 8.Welding & Stressing operations 6Y16 6Y176Y18 KIROW

Bridge 8 – Ashley Road 9 Hale Crossover UM DM ← Ashley StationHale Station → 6Y16 Sat 00:15 - Sat 22:00 LOCO,10 LD Autohopper 6Y17 Sat 01:00 - Sun 15:00 LOCO, Support, KIROW, Runner, 3MT Salmons, 1MT Tench, 10MT Falcons, LOCO (from site only) 1.Trains access from Northenden 2.KIROW lifts out panels onto 6Y17 3.Scarify, grade and compact using 2 X PC138, D41 Dozer and Triple Whacker. Load into 6Y17 (10MT Falcons) 4.KIROW relay panels from 6Y17 5.Unload bottom stone from 6Y17 and profile using 2 X PC138 and RRV 6.Tamper site 7.Re-rail panelled section using McCulloch 8.Welding & Stressing operations 6Y16 6Y17

Bridge 8 – Ashley Road 10 Hale Crossover UM DM ← Ashley StationHale Station → 6Y16 Sat 00:15 - Sat 22:00 LOCO,10 LD Autohopper 6Y17 Sat 01:00 - Sun 15:00 LOCO, Support, KIROW, Runner, 3MT Salmons, 1MT Tench, 10MT Falcons, LOCO (from site only) 1.Trains access from Northenden 2.KIROW lifts out panels onto 6Y17 3.Scarify, grade and compact using 2 X PC138, D41 Dozer and Triple Whacker. Load into 6Y17 (10MT Falcons) 4.KIROW relay panels from 6Y17 5.Unload bottom stone from 6Y17 and profile using 2 X PC138 and RRV 6.Tamper site 7.Re-rail panelled section using McCulloch 8.Welding & Stressing operations 6Y16 6Y17

Bridge 8 – Ashley Road 11 Hale Crossover UM DM ← Ashley StationHale Station → 6Y16 Sat 00:15 - Sat 22:00 LOCO,10 LD Autohopper 6Y17 Sat 01:00 - Sun 15:00 LOCO, Support, KIROW, Runner, 3MT Salmons, 1MT Tench, 10MT Falcons, LOCO (from site only) 1.Trains access from Northenden 2.KIROW lifts out panels onto 6Y17 3.Scarify, grade and compact using 2 X PC138, D41 Dozer and Triple Whacker. Load into 6Y17 (10MT Falcons) 4.KIROW relay panels from 6Y17 5.Unload bottom stone from 6Y17 and profile using 2 X PC138 and RRV 6.Tamper site 7.Re-rail panelled section using McCulloch 8.Welding & Stressing operations 6Y16 6Y17

Bridge 8 – Ashley Road 12 Hale Crossover UM DM ← Ashley StationHale Station → 6Y16 Sat 00:15 - Sat 22:00 LOCO,10 LD Autohopper 6Y17 Sat 01:00 - Sun 15:00 LOCO, Support, KIROW, Runner, 3MT Salmons, 1MT Tench, 10MT Falcons, LOCO (from site only) 1.Trains access from Northenden 2.KIROW lifts out panels onto 6Y17 3.Scarify, grade and compact using 2 X PC138, D41 Dozer and Triple Whacker. Load into 6Y18 (20MT Falcons) 4.KIROW relay panels from 6Y17 5.Unload bottom stone from 6Y17 and profile using 2 X PC138 and RRV 6.Tamper site 7.Re-rail panelled section using McCulloch 8.Welding & Stressing operations 6Y16 6Y17

Bridge 8 – Ashley Road 13 Hale Crossover UM DM ← Ashley StationHale Station → 6Y16 Sat 00:15 - Sat 22:00 LOCO,10 LD Autohopper 6Y17 Sat 01:00 - Sun 15:00 LOCO, Support, KIROW, Runner, 3MT Salmons, 1MT Tench, 10MT Falcons, LOCO (from site only) 1.Trains access from Northenden 2.KIROW lifts out panels onto 6Y17 3.Scarify, grade and compact using 2 X PC138, D41 Dozer and Triple Whacker. Load into 6Y18 (20MT Falcons) 4.KIROW relay panels from 6Y17 5.Unload top stone from 6Y16 and profile using RRV 6.Tamper site 7.Re-rail panelled section using McCulloch 8.Welding & Stressing operations 6Y16 6Y17

Bridge 8 – Ashley Road 14 Hale Crossover UM DM ← Ashley StationHale Station → 6Y16 Sat 00:15 - Sat 22:00 LOCO,10 LD Autohopper 6Y17 Sat 01:00 - Sun 15:00 LOCO, Support, KIROW, Runner, 3MT Salmons, 1MT Tench, 10MT Falcons, LOCO (from site only) 1.Trains access from Northenden 2.KIROW lifts out panels onto 6Y17 3.Scarify, grade and compact using 2 X PC138, D41 Dozer and Triple Whacker. Load into 6Y18 (20MT Falcons) 4.KIROW relay panels from 6Y17 5.Unload top stone from 6Y16 and profile using RRV 6.Tamper site 7.Re-rail panelled section using McCulloch 8.Welding & Stressing operations 6Y16 6Y17

Bridge 8 – Ashley Road 15 Hale Crossover UM DM ← Ashley StationHale Station → 6Y16 Sat 00:15 - Sat 22:00 LOCO,10 LD Autohopper 6Y17 Sat 01:00 - Sun 15:00 LOCO, Support, KIROW, Runner, 3MT Salmons, 1MT Tench, 10MT Falcons, LOCO (from site only) 1.Trains access from Northenden 2.KIROW lifts out panels onto 6Y17 3.Scarify, grade and compact using 2 X PC138, D41 Dozer and Triple Whacker. Load into 6Y18 (20MT Falcons) 4.KIROW relay panels from 6Y17 5.Unload top stone from 6Y16 and profile using RRV 6.Tamper site 7.Re-rail panelled section using McCulloch 8.Welding & Stressing operations 6Y16

Bridge 8 – Ashley Road 16 Hale Crossover UM DM ← Ashley StationHale Station → 6Y16 Sat 00:15 - Sat 22:00 LOCO,10 LD Autohopper 6Y17 Sat 01:00 - Sun 15:00 LOCO, Support, KIROW, Runner, 3MT Salmons, 1MT Tench, 10MT Falcons, LOCO (from site only) 1.Trains access from Northenden 2.KIROW lifts out panels onto 6Y17 3.Scarify, grade and compact using 2 X PC138, D41 Dozer and Triple Whacker. Load into 6Y18 (20MT Falcons) 4.KIROW relay panels from 6Y17 5.Unload top stone from 6Y16 and profile using RRV 6.Tamper site 7.Re-rail panelled section using McCulloch 8.Welding & Stressing operations

Bridge 8 – Ashley Road 17 Hale Crossover UM DM ← Ashley StationHale Station → 6Y16 Sat 00:15 - Sat 22:00 LOCO,10 LD Autohopper 6Y17 Sat 01:00 - Sun 15:00 LOCO, Support, KIROW, Runner, 3MT Salmons, 1MT Tench, 10MT Falcons, LOCO (from site only) 1.Trains access from Northenden 2.KIROW lifts out panels onto 6Y17 3.Scarify, grade and compact using 2 X PC138, D41 Dozer and Triple Whacker. Load into 6Y18 (20MT Falcons) 4.KIROW relay panels from 6Y17 5.Unload top stone from 6Y16 and profile using RRV 6.Tamper site 7.Re-rail panelled section using McCulloch 8.Welding & Stressing operations

Bridge 8 – Ashley Road 18 Hale Crossover UM DM ← Ashley StationHale Station → 6Y16 Sat 00:15 - Sat 22:00 LOCO,10 LD Autohopper 6Y17 Sat 01:00 - Sun 15:00 LOCO, Support, KIROW, Runner, 3MT Salmons, 1MT Tench, 10MT Falcons, LOCO (from site only) 1.Trains access from Northenden 2.KIROW lifts out panels onto 6Y17 3.Scarify, grade and compact using 2 X PC138, D41 Dozer and Triple Whacker. Load into 6Y18 (20MT Falcons) 4.KIROW relay panels from 6Y17 5.Unload top stone from 6Y16 and profile using RRV 6.Tamper site 7.Re-rail panelled section using McCulloch 8.Welding & Stressing operations

OB45 & OB46 – Up Main OB45OB46 The Track Lower at both OB45 & 46 on the Up main was carried out during the same 54hr possession This allowed for efficiencies in both Engineering Trains, Tamping resource and Plant

Bridge 45 & 46 UM DM ← AltrinchamStockport → 6Y20 Sat 00:15 - Sun 18:00 LOCO, 1MT Bass, 16LD Coalfish, 3LD Parr, 19LD Coalfish 6Y21 Sat 00:45 - Sun 08:00 LOCO, 14LD Coalfish, 2LD Salmon, 18LD Coalfish, 4MT Coalfish 6Y22 Sat 01:15 - Sat 12:00 LOCO, 40MT Coalfish, LOCO Br 45 & 46 Convectional track renewal at both bridges utilising the same plant, engineering trains and tamper Br 45Br 46 6Y206Y216Y22

Drainage works Installation of a new drainage to bypass a previously installed drainage run allowing the water level under OB08 to be lowered

My role Developing the engineering plan around the available resource Production of engineering and safety documentation –Construction Phase Plan –Work Package Plans –Task Briefing Sheets –Deliverability presentation for the client Assisting the Project Manager –Internal and Client progress meetings –Change Control Working as a ‘Engineer’ during the works Hand back of the sites, compiling the Health and Safety files

Questions?