Presenter: Karen Fligger, EPA HQ 1. Session Overview 1) Introduction to CWNS 2) Needs Definitions and Categories 3) Needs Elgibility 4) SRF Eligibility.

Slides:



Advertisements
Similar presentations
Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
Advertisements

Indian Environmental General Assistance Program (GAP) Guidance on the Award and Management of General Assistance Agreements for Tribes and Intertribal.
Presenter: Karen Fligger, US EPA. Decentralized Wastewater Treatment Managed onsite or cluster wastewater systems used to collect, treat, and disperse.
Annual Inspections of First Nation Water and Wastewater Facilities Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater.
AQUAREC Project Centre for Water Systems AQUAREC Project Centre for Water Systems D. Joksimovic.
What is NPDES? “National Pollutant Discharge Elimination System”
WHAT IS GREEN INFRASTRUCTURE ? Khris Dodson, Environmental Finance Center November 17, 2010.
Funding for Municipal Infrastructure Ruth Noemí Colón Acting Secretary of State George Stafford Deputy Secretary of State Public Finance and Management.
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
1 What is Green Infrastructure and How Does It Reduce Wet Weather Issues? Making natural systems work for us: using soil and vegetation - rather than concrete.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Santa Ana Region Stormwater Permit TMDL Requirements and Costs
U.S. Environmental Protection Agency Region 2 Green Infrastructure – Community Vision March 14, 2013 Ensuring safe and clean water for all Americans Ensuring.
Funding Application Workshop for State Fiscal Year 2014 (SFY 2014) Water Quality Program 1.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
THE NORTH CAROLINA AGRICULTURAL WATER RESOURCES ASSISTANCE PROGRAM NC Water Resources Congress October 30, 2014.
Incorporating Climate Change Adaptation in EPA Region 10 Programs: An example based on a newly initiated pilot in the Office of Water and Watershed’s Total.
Presenter: Alejandro Escobar, Tetra Tech 1. Session Overview Dos and Don’t will be shown with theoretical or real examples. Based on most common problems.
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
Presenter: Karen Fligger, EPA. What is a Small Community? Total Present Resident Population fewer than 10,000 persons 2 Total Resident Population present.
Presenter: Karen Fligger, EPA HQ 1. Session Overview CWNS 2012 Documentation Criteria Recap Pre-Approved Document Types Innovative Needs and Costs Documentation.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
2004 URBAN WATER COUNCIL Regional Municipal Seminar on Water Partnerships Mashantucket, Connecticut (Foxwoods Resort) October 21-22, 2004 Using Real Time.
Presenter: Karen Fligger, EPA. Stormwater Generated by runoff from land and impervious surfaces such as paved streets, parking lots, and building rooftops.
Tom Singleton Associate VP, Director, Integrated Water Resources an Atkins company Linking TMDLs & Environmental Restoration.
Section 319 Grant Program Nonpoint Source Pollution Control
Green Project Reserve (GPR) of the “American Recovery and Reinvestment Act (ARRA) of 2009” What does it mean for PA?
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Lake Erie HABs Workshop Bill Fischbein Supervising Attorney Water Programs March 16, 2012 – Toledo March 30, Columbus.
State Approaches to Funding Local Projects A Survey of RFPs The State/EPA NPS Partnership New Orleans, November 27, 2001.
The Massachusetts State Revolving Fund Loan Program.
Forestry-related Ordinances in Florida What are the potential influences of county and municipal ordinances on forest land retention and sustainability?
TMDL Overview Kurt Spitzer 850/ Estimates of Cost of Compliance Florida Consumer Fertilizer.
Water Supply Planning Initiative State Water Commission November 22, 2004.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Georgia’s Water Plan June 17, /09/08 Page 2 Agenda Plan Development Plan Overview.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
1 “ Understanding the Local Role of Improving Water Quality” Virginia Association of Counties November 14, 2011 Virginia Association of Counties November.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005.
Energy, Utilities, and Telecommunication Summer Study Committee Meeting September 2, 2014 Thomas W. Easterly, P.E., BCEE Commissioner IN Department of.
Clean Watersheds Needs Survey (CWNS) 101 June 15th, 2010 Webcast Training.
EPA’s Role in Source Water Protection
Restoring VA Waters the TMDL Way Jeff Corbin Senior Advisor to the Regional Administrator U.S. EPA Region 3.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Briefing on IMA Negotiation Issues Presented to: Blue Plains IMA Negotiating Team Operating Agency Work Group March 11, 2010 District of Columbia Water.
Connecticut Department of Energy and Environmental Protection.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
Non-point Source Update Marc T. Aveni Regional Manager.
Clean Watersheds Needs Survey (CWNS) 2012 Gap Approach Option June 22, 2010.
CLEAN WATER ACT Section 319 Grant Funds Robin F. “Rob” Rung Contracts / Grants Officer Water Quality Planning Bureau Department of Environmental Quality.
Michigan’s Nonpoint Source Program Pass Through Grant Funding Past, Present, and Future Outlook Bob Sweet Past Aquatic Biologist, Present Administrative.
An Overview of our Community’s Stormwater Management Program
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
GEFA Loan Programs CDBG Applicants Workshop Michael Roberts Program Manager Water Resources Division December 4, 2015.
SUPPLEMENTAL ENVIRONMENTAL PROJECTS. KEY CHARACTERISTICS OF A SEP Projects must improve, protect or reduce risks to public health or environment. Projects.
Illinois Green Infrastructure Grant Program (IGIG) ABC’s and 123’s of Illinois EPA’s newest grant program Jan Carpenter Illinois EPA
Water and Wastewater Infrastructure Project Financing 1.
MS4 Permit – Meaning, History, and Annual Report Results Watershed Partners 4/13/
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
SPU Modeling & Monitoring
Finance Options: Funding Water Infrastructure Projects George Bryan South Carolina Department of Health and Environmental Control State Revolving Fund.
Water Quality Improvement Projects and Engineering Planning Grant
Lake Erie HABs Workshop
Relationship between World Bank and Romanian EA requirements
MS4 = Municipal Separated Storm Sewer System
Hidden Capacity How Proper Maintenance and Cleaning of Sewer Systems Can Have Huge Benefits! Presentation by the Jersey Water Works CSO Committee For the.
EPA’S ROLE IN APPROVING BASIN PLAN AMENDMENTS
Presentation transcript:

Presenter: Karen Fligger, EPA HQ 1

Session Overview 1) Introduction to CWNS 2) Needs Definitions and Categories 3) Needs Elgibility 4) SRF Eligibility and Audit 2

3

What is the CWNS? Assessment of capital needs to meet the Clean Water Act’s (CWA) water quality goals Joint effort by EPA, States, & Local organizations Every 4 years as required by CWA Sec 516 (started in 1972) Data is submitted via the CWNS Data Entry Portal (DEP) Results in Report to Congress and on publicly available data on the Internet 4

Clean Water Act (CWA) Authority CWA Sec. 516 excerpt The EPA Administrator, in cooperation with the States, …shall make (a) a detailed estimate of the cost of carrying out the provisions of this Act”; (b) a detailed estimate…of the cost of construction of all needed publicly owned treatment works in all of the States… CWA Sec. 205(a) excerpt Allotments…shall be made only in accordance with a revised cost estimate made and submitted to Congress in accordance with Sec. 516 of this Act and only after such revised cost estimate shall have been approved by law specifically enacted hereafter. 5

6 Data is entered at facility/project level Treatment plant Collection system (combined & separate) Stormwater management project Combined sewer overflow (CSO) control project Recycled water distribution facility Decentralized wastewater treatment project Non-point source pollution control project Pump Station

7 Information collected includes: Estimated needs (costs) Documentation outlining needs & costs Location and contact information Permit information Treatment plant population served, flow, effluent, and discharge information Decentralized and collection system population served Unit Process and Best Management Practices

Additional Background EPA’s CWNS website: epa.gov/cwns Under 2012 Planning, links to the CWNS 101 webinar, presentation, and FAQ 8

9

Needs Definitions Needs: The unfunded capital costs -- as of January 1, of a project that addresses an existing or projected (within next 20 years) water quality or public health problem “Documented” Needs: Meet CWNS documentation criteria and fall within CWNS Categories “Official” Needs: The subset of documented needs that are publicly owned treatment works as noted in Clean Water Act Section 516(B)(1)(b) “Unofficial” Cost Estimates: Costs that are not included in EPA’s needs, because they do not meet CWNS documentation criteria. Such estimated are entered and used for State’s purposes only. 10

Official Needs CWNS 2012 Wastewater Categories 11 I:Secondary wastewater treatment II:Advanced wastewater treatment III-A:Infiltration/inflow correction III-B:Sewer replacement/rehabilitation IV-A: New collector sewers appurtenances IV-B: New interceptor sewers and appurtenances V-A: Combined sewer overflow correction -- Traditional Infrastructure V-B: Combined sewer overflow correction -- Green Infrastructure X:Recycled water distribution

Official Needs CWNS 2012 Stormwater Categories 12 VI: Stormwater Management programs* VI-A: Stormwater Conveyance Infrastructure VI-B:Stormwater Treatment Systems VI-C:Green Infrastructure VI-D:General Stormwater Management * Pre-2008 needs only.

Documented Needs CWNS 2012 Nonpoint Source and Decentralized Wastewater Treatment Categories 13 VII-A:Nonpoint Source (NPS) Control Agriculture (cropland) VII-B:NPS Agriculture (animals) VII-C:NPS Silviculture VII-E: NPS Ground Water Protection VII-F:NPS Marinas VII-G: NPS Resource Extraction VII-H: NPS Brownfields VII-I: NPS Storage Tanks VII-J: NPS Sanitary Landfills VII-K: NPS Hydromodification VII-M: NPS Other Estuary Management Activities XII:Decentralized wastewater treatment systems

CWNS Needs Category Changes Combine Sewer Overflow Correction now has two sub- categories These categories include needs and costs to prevent or control the periodic discharges of mixed stormwater and untreated wastewater (combined sewer overflows) that occur when the capacity of a sewer system is exceeded during a wet weather event. V-A: Traditional infrastructure (pipes, storage, etc.) All current CSO needs will be considered this category V-B: Green infrastructure (rain gardens, swales, etc.) 14

CWNS Needs Category Changes Energy Efficiency -- The capital costs to implement energy efficiency measures at a facility. Indicate the % of needs for Energy Efficiency within allowable 2012 categories e.g. 10% of Category I costs are for energy efficiency Not required to link to water quality or public health benefit Valid facility types: treatment plants, pump stations, stormwater types, collection systems New Change Type: Improve energy efficiency Documentation of energy and other operational efficiencies (reduced need for chemical or O&M costs) will be sufficient to document need for projects in CWNS

CWNS Needs Category Changes Climate Change – The capital costs to mitigate the impacts (e.g. floods, hurricanes) of climate change at a facility Indicate the % of needs for Climate change within allowable 2012 categories Need to link to water quality or public benefit not required, but the link to climate change must be explicit in documentation. Assumptions about the impacts of climate change will not be accepted. Valid facility types: treatment plant, collection systems, pump stations, stormwater management types, nonpoint source types New Change Type: Climate Change Adaptation If this is selected, supporting documents must be submitted for review (non-footnotable) 16

17

“ Official Needs” Eligibility Criteria 1. Description of the water quality or public health problem 2. Location of the problem 3. Solution to the problem 4. Cost of the solution 5. Basis for the cost 6. Total cost 7. Current Documentation 18 Needs Costs

1. Description of the water quality or public health problem Water quality impairment or potential source of impairment. Specific pollutant source information. General statements about water quality impairment do not meet this criterion. Examples: permit violations, more stringent permit requirements, discharge to impaired waters. 19

2. Location of the problem 20 Data Areas AddressCoordinates (Provide information for only one of the applicable options) AddressSingle Latitude- Longitude (with metadata) Polygon (one or more) Indicate Entire County Indicate Entire Watershed City(ies)/ Town(s) 2 Facility/Project Overall Type Wastewater Treatment Systems X1X1 X n/a NPS Pollution Projects n/a X (if project area <200 acres) XXXn/a OWTS (Decentralized) On/a X3X3 Clustered System (Decentralized) OXn/a X Stormwater Management O X (only VI-B) Xn/a X 1 Address is not required for the following wastewater Facility Types: Collection: Combined Sewers, Collection: Separate Sewers, Collection: Interceptor Sewers, Collection: Pump Stations, and Recycled Water Distribution. 2 Indicate one, several, or all cities, towns and/or unincorporated areas in a county. 3 OWTS can occur in all or a portion of towns and/or areas selected.

Location of the problem For all types facilities/ projects: Primary County Primary Watershed Primary Congressional District 21

3. Solution to the problems Specific pollution control measures or BMPs to address the problem. If applicable, the number of units needed to address the problem must be clearly documented. 22

4. Cost of the solution The capital cost to implement each pollution control measure or BMP. General estimates for the problem area are not permitted; only site-specific data information is acceptable to generate the costs. Costs entered in CWNS Data Entry Portal must be adjusted downward from document costs to reflect known funding since the document date. 23

5. Basis for the cost The source of the costs for each solution. Examples: engineer ’ s estimate, facility plan, cost of comparable practices, estimates from equipment suppliers, cost curves Detailed information on documentation sources will be provided in the Documentation Rules Web Seminar 2:00 pm ET 1:00 pm ET 24

6. Total Cost The total capital costs for all pollution control measures and BMPs documented for a facility All costs will be automatically converted from documented costs to January 1, 2012 dollars using the cost base date entered into the CWNS Data Entry Portal 25

7. Current Documentation When the total needs for the facility/project: >$30 Million: January 1, 2006, or more current <$30 Million: January 1, 2002, or more current 26

27

SRF Eligibility No changes from 2008 During CWNS data entry, states identify the percentage of each need that is CWSRF eligible according to National CWSRF eligibility rules 28

Example Facility Plan for a Category II Advanced Treatment process estimates $10 million in total costs. $1 million of the cost is associated with land not integral to the treatment process and is therefore not CWSRF eligible. State would identify 90% of this need as CWSRF eligible 29

SRF Eligibility: Audit Process Contractor verifies CWSRF eligibility status designations by reviewing a sample of the documents. CWSRF Panel reviews contractor’s report and makes final eligibility decisions. States have opportunity to respond. Panel is composed of 3 CWSRF staff (HQ & regions) Preparation of an Audit Report. After all decisions and appeals are finalized Shows percents that States correctly identified as CWSRF eligible for each category Included as an Appendix of the Report to Congress 30

Common Issues For land purchases, the land must be integral to the treatment process to be SRF eligible Laterals are not SRF eligible unless they are publicly owned Salaries are not SRF elgible 31

Resources Consult with State CWSRF personnel Consult with National CWSRF policy memos, questions and answers, and factsheets Linked from CWNS 2012 Planning web page ( cfm) Consult with the CWSRF Regional Coordinator who may consult with the Headquarters CWSRF Branch. 32

33