Infrastructure Committee Formed in March 2007 to review coverage of the sewer system and determine possible improvements Comprised of volunteers Lauren.

Slides:



Advertisements
Similar presentations
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Advertisements

1. 2 Municipal Management Districts (MMD) are special districts that are: Self governed, but must be approved by the host municipality; and have the.
The Construction Industry Council of Central Florida Timothy L. Johnson, AIA/NOMA Permitting Services Division Manager City of Orlando.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
“Non-point Source Septic Mitigation Tool Box”. Why we should care about rural sewers? Nicholas M. Ellis Michael Novac Bryan Pohl.
City of South Burlington City Council Adopted January 12, 2013 FY 2014 Budget - Keys to Financial Success Prepared by Sandy Miller, City Manager and Bob.
Wastewater Neighborhood Meetings Code of Conduct: Be willing - participate fully; Be Kind - treat others with dignity and respect; Be open - consider new.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
Water Rates Utility Rates & SDCs Presentation to the West Linn City Council October 5, 2009.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Non Powell Bill Street Repair & Maintenance Strategies October 8, 2012.
Ossining Ambulance District September Current Situation The Greater Ossining Community has enjoyed 24 hour emergency medical care and transport.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
A QUICK REVIEW TAX INCREMENT FINANCE DISTRICTS. WHAT IS A TIF? A TIF provides that new valuation or a portion thereof from all new development in a set.
1 Department Department of of Public Utilities Presentation of Study Results August 2006.
Utility Extension Project
Roads & Jobs For Riley County. The county’s roads and bridges are deteriorating and there are extremely limited funds available for replacement The county’s.
Proposal to Town Board March 2,  Background  Concept  Financing  Economic Benefits  Marketing Plan  Fundraising and Sponsorship  Clarence.
SEA RAY BOATS, FLAGLER MARINE CENTER ECONOMIC DEVELOPMENT INCENTIVES.
1 By: Dan Scherer, Assistant Superintendent of Water & Sewer.
Lands’ End Wind Project Kristine McCormick Michelle Shively Greg Brown Tim Pierie.
NYS Department of Labor, Division of Research and Statistics Frank M. Surdey, Managing Economist May 2008 Labor Market and Demographic Trends in Greene.
2014 Budget Department Presentations Infrastructure Funding Options.
1 TOWN OF LOCKPORT FINANCIAL REVIEW Focus on the Sewer Plant and Sewer Collection Service.
Introduction to the City Auditor’s Office and Recommendation to Revise Oil Production Tax Presentation to the Wrigley Neighborhood Association February.
Ground Water Conditions around the Lathers Property Town of Waukesha Douglas S. Cherkauer PhD, PG, PH November 15, 2007.
THE TRUTH ABOUT HOMEOWNERS – WHY THEY’RE NOT SELLING Presented by Carmen Hirciag Senior Research Analyst.
Millinocket A Historical Perspective.  Paper mill construction created Millinocket  Population grew with influx of skilled workers to construct the.
Annexation 480 CHELSEA ROSE ANNEXATION PUBLIC INFORMATION MEETING AUGUST 11 TH, 2015.
SALES COMPARISON APPROACH  THE PROCESS IN WHICH THE MARKET ESTIMATE IS DERIVED BY ANALYZING THE MARKET FOR SIMILAR PROPERTIES.  A MAJOR PREMISE OF THE.
Economic Development Incentive Agreement Project Modern.
Economic Development Incentive Agreement Project Modern.
THE MARKET FOR AFFORDABLE HOUSING IN TAOS Bureau of Business & Economic Research Jeffrey Mitchell, Ph.D. July 12, 2011 Funded by: Town of Taos University.
FUNDING THE FUTURE OF CALIFORNIA: WHERE WILL THE REVENUE COME FROM? Lenny Goldberg California Tax Reform Association , for Reclaim Higher Education.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
Door County Comprehensive Plan 2030 Housing Advisory Workgroup 2 May 23, 2006 Becky Kerwin Door County Planning Department Rob Burke UW – Extension.
Potential Sources of Financial Assistance to Connect to the New Sewer PRESENTED BY SHERYL FLORES AND ALMA AGUILAR 11/5/2015.
A Briefing to the Housing Committee Housing/Community Services Department October 5, 2015.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
May 14, 2013 North Ogden PW Land Purchase. Location: Approximately 130 East Pleasant View Drive Seller Scott Holt.
Marquis Hills Area Construction Update Meeting May 5, 2016.
Recommended Citizens Budget for 2016 Presented to Summit County Council December 28, 2015.
Marquis Hill Area Construction Update Meeting December 2, 2015.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
Sewer Infrastructure Watuppa Plantations Development Tiverton Wastewater District (TWWD) “Our mission is to safeguard public health and protect and improve.
Mandatory Connection 1 st Information Meeting. Review project Explain mandatory connection process via Frequently Asked Questions Answer questions Supply.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Top 10 Frequently Asked Annexation Questions.
Mandatory Connection 2 nd Information Meeting November 17, 2015.
February 21, General Information Utility staff is not aware of any mandate from city ordinance or state statute to provide water and sewer services.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
Heritage Park Area Construction Update July 28, 2015
CONGAMOND ROAD ROADWAY IMPROVEMENT INFORMATIONAL MEETING
Wells and Septic Systems: The Importance of Care and Maintenance
Proposed Lower Silver Creek Sewer Project
Marquis Hills Area Information Meeting September 13, 2016
Profile of Little Pond Sewer Service Area
Marquis Hills Area Information Meeting December 7, 2016
Town Hall Meeting: Proposed Extension of Sunset Drive
City of Johnston East of Merle Hay Road Infrastructure Improvements
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Item 8A Authorize staff to establish a new standard operating procedure (SOP) with the authority to waive the sewer tap fee for an incentive period of.
Springbrook Estates Sewer Improvement Area Informational Meeting
Beverly HIlls Proposed Sewer Improvement Project
Georgetown county water and sewer district
Sewer Infrastructure Watuppa Plantations Development
Funding the Town’s Transportation Infrastructure Improvement Plan (IIP) – An Initial Discussion of Impact Fees Town Council Meeting March 1, 2017.
Biltmore C Proposed Water & Sewer Improvement Project
Quarterly Budget Update 2018 first Quarter Report
Larimer County: engineering
Presentation transcript:

Infrastructure Committee Formed in March 2007 to review coverage of the sewer system and determine possible improvements Comprised of volunteers Lauren Angelo, Gloria Chen, Bob Johnson, Mark Kroot, Mansour Moussavian and Councilmember Mike O’Malley Worked with Town Staff including Cyrus Kianpour, Richard Chiu, Michelle Chen and Karen Jost Met twice per month on average over the past 18 months Surveyed all 1,650 residents not on sewer and received a 40% response rate (649 responses) Presented initial findings to Council in Feb 2008 Agenda #10

Initial Findings Approximately 50% of Town’s residents are on sewer and 50% are on septic systems. While there is an argument that septic systems put some water back into environment, most engineering professionals believe sewer systems are preferable to septic from an environmental standpoint. Santa Clara County Health Department requires that new residences must connect to sewer system if there is an existing sewer main within 200 feet of residence Septic systems fail with age and replacement of existing leach field can be problematic

Initial Findings - Page 2 While not conclusive, Realtor Owen Halliday reviewed residential sales over the past three years in LAH and data showed homes with sewers sell for significantly higher prices ($400K) than homes with septic (newer homes tend to have sewer) Main issue in connecting to sewer is proximity to existing sewer main - longer distance from sewer main means less likely to connect Even at cost of $40,000, 56% of those surveyed would be interested in connecting in next 5 years

Two Case Studies In an effort to understand the economics of building sewer mains in areas of high interest we identified two projects and studied them in depth: –Robleda: From Purissima to Orchard Hill Lane –Moody: Extension from Tanglewood to Canyon Road and up Moody Court Contacted residents who had expressed interest in the 2007 sewer survey Interested residents signed letters of intent expressing willingness to pay up to $25,000 for sewer

Robleda Project Total residences served: 57 Letters of intent received: 13 Length of sewer extension: 5,055 feet Total project cost: $1.01 million Cost per 13 residents with strong interest: $80,000 Cost if 40 of the 57 residences connected: $25,000

Moody Project Total residences served: 40 Letters of intent received: 22 Neighborhood interest: 50% Length of sewer extension: 7,646 feet Total project cost: $1.5 million Cost per 22 residents with strong interest: $66,000 Cost if all 40 residences connected: $37,500

Case Study Conclusions Even with up to 50% interest in some areas, project cost is still too high to be borne by interested residents. Without financing assistance, status quo will persist –Failing septic systems and new construction will lead to new septic systems where sewer is unavailable, and the neighborhood will lose another resident interested in sewer –Town will continue to see a trickle of sewer connections (approximately 10 per year) –There will be an occasional sewer reimbursement district (about one every other year) formed where one or two residents have a driving need (either property development or septic failure)

Recommendations Town must finance the extension of the sewer into neighborhoods with high interest Expectation that Town will be paid back over time as residents connect Interested residences in these areas connect for a higher connection fee (e.g. $25,000-$40,000) Each year connection fee increases to offset inflation/Town’s interest rate Expectation that residents with failing septic systems or new construction will connect to sewer if available New committee with Finance involvement needed to drive this process