1 Scope 1.18km of sewers (500mm to 3000mm dia) 2.2 lift stations 3.Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International.

Slides:



Advertisements
Similar presentations
Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
Advertisements

Water & Wastewater Construction Back Forward Wastewater Treatment Plant and Pump Station Improvements, Haverhill, MA.
Area -10,1km2, Inhabitants – (2013) –  Shareholder – Saldus municipality  Operation area – Saldus town  Activities of Saldus Komunalserviss.
1 Objective  Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope  6 Contracts km of 2.2m,
January 6. January 7 January 8 January 9 January 10.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Truro DG5 Scheme April Integrated Urban Drainage Schemes Proposed Hendra Road surface water separation Kenwyn Street Proposed Redannick Lane surface.
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
X. X September Mo Tu We Th Fr Sa Su
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
This project is co-funded by the European Union, the Russian Federation and the Republic of Finland Activity 4. Utilities network analysis (KRIMEL, KAEEC,
District Council Worksession March 18, 2014 The Maryland-National Capital Park and Planning Commission Prince George’s County Planning Department.
City of Lino Lakes Public Hearing on Proposed 2010 Operating Budget and Property Tax Levy December 14, 2009.
Team Member(s) Your name. 25 January SOLD: BUY: Copy of stock pdf.
What day is today? What`s the date?. Sunday Monday Tuesday Wednesday Thursday Friday Saturday What day is today?
Town of Tecumseh 2012 Capital Works Projects. Road Projects ProjectBudget Road Paving Projects……………………..$850,000 – Asphalting – tar & chip – crack sealing.
Lakes Creek Road Waste Transfer Station Construction highlights.
Truro sewer upgrade Timetable of work and maps. Key plan Victoria Square Kenwyn Street New / upsized combined sewer - red New / upsized surface water.
Enumclaw High School Pre-Design Workshop 6 March 11, 2015.
Incentives & Infrastructure  Estimated incentives and Infrastructure cost: $87,000,000  We will have a Development Agreement with Microsoft that will.
La Grange Reservoir Turlock Lake Eastside Reservoir or Optional Canal West Satellite Reservoir Cattle Reservoir Turlock Lake South Pump Station Northwest.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Balchik Integrated Water Project in Bulgaria ISPA Measure 2002 BG 17 P PE 017 WWTP BALCHIK.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
The months of the year January February. The months of the year March April.
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
Project Parkway Timeline to 2011 April 1, 2010 Town Hall Meeting Steering Committee Schools February 2009 May 18, 2009 Project Parkway Community Kick-
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Richland Creek Water Supply Program Contract for Reservoir, Pump Stations, and WTP Final Design Services Paulding County, Georgia Water and Sewer Advisory.
CITY OF NEW BERLIN SECTION 35 Neighborhoods G & H Comprehensive Plan Amendment Public Input January 2012.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
Sixth Amendment to the Orange County / City of Winter Garden Joint Planning Area Agreement and Utilities Territorial Agreement April 17, 2007 Sixth Amendment.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
FY 2017/18 General Budget Workshop
Deadline for Requisitions Payment Processing Date
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Municipal Infrastructure
Deadline for Requisitions Payment Processing Date
Wastewater Treatment Plant Biological Nutrient Removal & Digester Project - Package 2 Construction Contract City Council Meeting – August 1, 2017 Package.
Community Services Infrastructure Development
Construction Report March 25, 2010.
Spelling this week!
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Town of Dunn Sanitary District No. 3
13-block rotation schedule
Timeline Tool Kit December 25, 1946
Colchester Interceptor System Improvements Project
The SAT will be given at ECHS on the dates below!
McDonald’s Kalender 2009.
Melbourne Main Sewer Replacement Project Briefing for Canoeing Victoria August 2008 February 22, 2019.
Water Advisory Board March 29, 2016.
McDonald’s calendar 2007.
PUBLIC INFORMATION SESSION
Proud As A Peacock! We are very proud of__________________
Montgomery County Municipal Utility District No. 8 January 4, 2019
DATES DESCRIPTION September 27, 2018
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

1 Scope 1.18km of sewers (500mm to 3000mm dia) 2.2 lift stations 3.Demolition of 4 pumping stations – Jurong West, Jalan Bahar, Corporation and International Road pumping stations 4.Grouting of 18km of twin pumping mains (660mm to 950mm dia) Sewerage Schemes to serve Developments in Jurong Eastern Catchment and Jurong Lake District Objective  Extend sewers to serve new developments & phase out 4 pumping stations

2 Sewerage Schemes to serve Developments in Jurong Eastern Catchment and Jurong Lake District

3 Expected Calling Date – December Package A – Proposed Sewers along Yuan Ching Road 500mm dia sewer – 1.2km 900mm dia sewer – 1.3km 2.Package B (Contract 1) – Proposed Lift Station at Jurong Town Hall Road 300 l /s capacity lift station Expected Calling Date – January Package B (Contract 2) – Proposed Sewers along Jurong Town Hall Road 300mm dia sewer – 750m 500mm dia sewer – 1.5km 900mm dia sewer – 700m Sewerage Schemes to serve Developments in Jurong Lake District

4 Expected Calling Date – February Package A (Contract 1) – Proposed Sewers along Pioneer Road and Jalan Ahmad Ibrahim 3000mm dia sewer – 3.1km 2.Package B – Proposed Sewers along Jalan Boon Lay 3000mm dia sewer – 3.2km Expected Calling Date – March Package A (Contract 2) – Proposed Sewers along Jurong West Avenue mm dia sewer – 2.5km Sewerage Schemes to serve Developments in Jurong Eastern Catchment

5 Expected Calling Date – April Package C (Contract 1) – Proposed Lift Station at Jurong Water Reclamation Plant 164,000 cmd capacity lift station Expected Calling Date – May Package C (Contract 2) – Proposed Sewers along Jalan Tukang and International Road 2000mm dia sewer – 1.9km Sewerage Schemes to serve Developments in Jurong Eastern Catchment