1 Launch of Development & Construction Manual Launch Shepparton 2 May 2007 Broadford 9 May 2007 1.

Slides:



Advertisements
Similar presentations
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Advertisements

PRESENTATION FOR CWEA TRAINING Keys to Successful Pipeline/Infrastructure Projects Pipeline Flow Diversion Presented by: Tom Epperson, PE, Tetra Tech.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
1 Important Changes to the Victorian Electricity Industry for Electrical Infrastructure Civil Works 1 July 2009.
KRAH AG : STRUCTURED WALL PIPE TECHNOLOGY
Chapter 20 Plumbing Plans.
Remote Operations Indigenous Community Development.
Grinder pumps are selected, instead of gravity sewers, when you need more freedom to run sewer up hills, through isolated flat lands, or in areas with.
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
BS9990 : 2015 Updates and/or Changes
Concrete Pre Cast Panel By Peter Spence ID:
N.F.P.A. 13R Justin Bohlmann FIR-204.
Residential Fire Sprinklers Building Codes Plan PreparationPlan Preparation The sprinkler contractor should be required to submit a set of complete, detailed.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Presentation Template
The Quote Request Model Joanne Woytek. 2 Conference ‘11 Why Use the Quote Request Tool  Only recommended method for: Determining what is available on.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
WILLBROS A Good Job On Time Hydrostatic Testing Practices Establishing Verifiable, Traceable, and Accurate Documentation August 20, 2013 Hal Ozanne Willbros.
LPA – Utility Coordination Natalie Parks StructurePoint November 20, 2013.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
2015 MASS Re-Issue Changes-Division 50. MASS’s many hats Capital Projects Private Development Private Systems Outside communities Agency Use - ADEC PM&E.
Risk Consulting REVISION TO EN and CEA 4001 EFSN – MAY 2014.
Potential Underground Wiring Meeting with Residents Wednesday, September 15, 2010 lionsbay.ca Lower Lions Bay Water Line Replacement The Village of Lions.
You Should Know Bulletin No. 135 © ACPA All Rights Reserved.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter 1Project: El Chaguite Water System.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
Processing Major Repair Application from DSS School REO’s Perspective 1.
John Howe. THE PRECAST CONCRETE PAVING A N D K E R B A S S O C I A T I O N BPCF Organisation Chart BPCF InterpaveBoxCACSMAACACPPAPFFPCASPA.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
BASIC IRRS TRAINING Lecture 7
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives The Mission Report Purpose and objectives What is not needed? Evolution of the.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
Ray Fassett ADSC WCC PAST PRESIDENT Condon-Johnson & Assoc. Inc WEST COAST CHAPTER.
Specification & Quantities Estimating
1 Smart Schools Bond Act Completing the Smart Schools Investment Plan
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
TRENTON Casing Filler Presentation
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
DEPARTMENT OF HEALTH CARE SERVICES
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
SMART SCHOOLS BOND ACT Michelle Okal-Frink (716) Contact Michelle or your CSR for more information.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
Confined Spaces. Definition: Are large enough that an employee can bodily enter them Are not designed for continuous occupancy. Have limited or restricted.
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
© 2012 Queensland Urban Utilities Queensland Urban Utilities reference Contractors Forum Tuesday 31 March 2015 Development Services Contracts & Assurance.
The Fire Sprinkler Certification Process What prevents certification? Matt McLellan Aon Sprinkler Certification October 2014.
Unit 209: Drainage systems
A2 Agreement Trial ICT November Outline Agenda  Welcome and introductions  10.05Travel Expenses  10.10GCE ICT –Entries and Transitional.
Optimising Stormwater Management BH:
Grey Owl Municipal Water feasibility study
Agenda Updates to Driveway and Sidewalk specifications and permits
Contractor Submissions
MDX-R3 INSTALLATION PROCESS NON-ADJUSTABLE CONCRETE POOLS
Appearance Approval Report (AAR)
Principal Contractor Licensing Scheme Standard
4th Annual Construction Law Summit
Cold water supply and Treatment
Engineering Waiver Management
New Equipment & System Approvals
TRENTON Casing Filler Presentation
Operations and Maintenance
Contestable Works Consultative Committee
Presentation transcript:

1 Launch of Development & Construction Manual Launch Shepparton 2 May 2007 Broadford 9 May

2 INTRODUCTION TO DEVELOPMENT & CONSTRUCTION MANUAL Les Goudie – Manager Network Planning & Development Welcome Introduction to the Manual Benefits for developers, consultants & GVW GVW expectations of consultants & contractors

3 Development & Construction Manual Steven Nash & Ignatius Alampi Manual comprises of –Melbourne Retail Water Agencies (MRWA) water supply & sewerage codes –Goulburn Valley Water (GVW) supplements to the MRWA codes –GVW sewage pump station design manual –Standard proformas and operating instructions –Construction Agreements –Process flowchart

4

5 MRWA Water Supply & Sewerage Codes GVW is using the MRWA edition of the Water Services Association of Australia (WSAA) Water Supply and Sewerage Codes These codes replace Goulburn Valley Water and Water Industry Technical Standard (WITS) codes Available from WSAA Victoria GVW will review any new versions Advise upon acceptance and update Manual as required

6 Water Changes from previous standards −All mains to be looped in court ends −Water mains up to and including 300mm diameter allowed in PVC −Cover reduced as per MRWA DICL pipe under roads still required Pipe material accepted −Refer to Water Services Association of Australia (WSAA) technical selection chart −OPVC, uPVC, MPVC, PE, DICL −To be a minimum of Class 12 and stiffness of 10,000Nm

7 Sewerage Changes from previous GVW Standards −PVC sewers allowable in all residential areas (including Shepparton) −CCTV inspection of all new sewers −Marker tape required above all sewer rising mains −Max length of property drain 10m Variations from MRWA –1.0m clearance required from outside pipe to boundary and/or easement –Maintenance Shafts are not approved

8 Sewage Pump Stations Changes from previous GVW Standards −Minimum internal diameter of 2m −PE for discharge pipe work −No light weight or thin walled fittings −New permanent hand rail system −Flow meters on all distribution pump stations

9 Feasibility Reports Project Initiation to GVW To be completed in accordance with pro-forma Need to include justification for any GVW contributions to project costs and GVW is to be treated as a client Common omissions –Developers name for the Deed of Agreement –Overall Servicing Strategy plan –Plan of Subdivision –GVW Contributions Need to keep GVW informed of tenders, variations and extras for expenditure relating to GVW contributions

10 Process Certification forms updated and now include –Reference to new codes –CCTV inspection details GVW requires adequate time to process and arrange inspections, where required, for –Feasibility Reports –Preconstruction –Water main shutdown –Confined Space Entry –Preliminary Acceptance CCTV tapes/report to be provided Justification report of GVW expenditure, if required

11 Construction – Water Peter French Water assets to be constructed in accordance with MRWA Water Code and GVW’s supplement Common Non-Conformances –Unsupported hydrant and valve covers –Inadequate anchor and thrust blocks (concrete preferred) –Hydrant & valve marker posts Not installed correctly Offsets not clearly painted onto posts (80mm high) Non approved marker posts used (Note: GVW valve marker posts are black rather than MRWA blue) –No corrosion protection applied to Flanges & Gibaults

12 Construction – Water AC Handling –Ensure contractors are meeting Workcover requirements –Submit form to Workcover as required. Form to be submitted to Goulburn Valley Water also Connections (cut ins) under pressure are preferred

13 Construction – Sewer Sewer assets to be constructed in accordance with MRWA Sewer Code and GVW’s supplement Common Non Conformances –Poorly constructed maintenance hole bases –Step irons installed incorrectly (first step should be between mm from top of maintenance hole) –Maintenance hole covers overfilled with concrete (should be installed in accordance with manufacturers requirements and key holes left clear) –Properly constructed jump-ups chased into the trench wall to allow compaction next to the connections Channel Baskets must be used to catch debris Confined space notice to be submitted to GVW prior to entry into a live Authority sewer

14 Endorsement of Designs Steven Nash & Ignatius Alampi Design Plan –Pipe material and class –Offsets from boundaries –GVW endorsement template –Reference to correct standards/codes (MWRA edition, GVW supplements) –Other civil infrastructure (SWD, roads, etc) –Fittings clearly labelled –Plans produced to reasonable size e.g. text legible –3 copies

15 Preliminary & Final Acceptance GVW may audit the site upon request by the consultant for Preliminary & Final Acceptance Consultant is expected to have visited the site Joint inspections are encouraged GVW frequently receives requests directly from developers for compliance immediately upon submission of documents for Preliminary & Final Acceptance Consultants to inform clients on status of projects

16 Preliminary & Final Acceptance Preliminary Acceptance Issues –Sewer – CCTV Inspection report to be included after review by consultant –Actual costs –Justification, documentation for GVW contributions

17 Trench Backfill Damien Byrne – BM Consulting Methods of compaction Difference between standard & modified compaction testing Optimum moisture content Watering in

18 GVW encourage feedback and comments from industry, particularly consultants & contractors who use the documents The Development & Construction Manual is available on the GVW web page Water and Sewer Codes are available from WSAA Victoria Advice to consultants & contractors via of updates and important information Summary

19 Discussion & Questions

20 Thankyou for your attendance

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35