Village of Denzil PS 3150 Pilot Project summary. Pilot Project Introduction A pilot project was initiated with the Village of Denzil to provide further.

Slides:



Advertisements
Similar presentations
Legal Descriptions and Site Plan Requirements
Advertisements

Financial Statements – presentation to municipal staff and elected officials Government of Yukon Community Services Whitehorse, Yukon March 30, 2011.
Cost Estimation System Tool
Design of a Sewer System and Water Distribution Network for New Nablus Area Prepared By Saja Younes Shereen Lubbadeh Majd Samarow Supervisor Dr. Mohammad.
Using GIS for Utility Mapping and Asset Management Sanitary Sewer, Storm Sewer, and Water Distribution City of Mason City Jessy Willadsen - Mason City.
Architectural Drawing Sire Plan Drawings. Preliminary Planning How do I select a house and site that will fit my needs and format in AutoCAD?
2010 Draft Municipal Budget
EA204 Environmental Technology Pavement Drainage Stormwater Sewer Design.
Capital Improvement Plan May 8 th, 2013 Presented by City Administration: Public Works Department Finance Department.
APEX Engineering Ian Braun Andrew Halley Jorge Hernandez Mohamad Haikal Bin Maamor PROPOSED HUALAPAI MUSEUM SITE DESIGN 1.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
May 21 Osler Community Hall Community Information Night1 5/21/2014.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Simulating Future Suburban Development in Connecticut Jason Parent, Daniel Civco, and James Hurd Center for Land Use Education and.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
APV / ACEAM & Assetic pre conference LGAAQ – November 2010 Anthony Keleher, Manager Financial Accounting Bundaberg Regional Council.
1 Town of Tillsonburg Lifecycle/Capital/Debt Strategy.
Sanitary Engineering Lecture 16
Spreadsheet Session Purpose: To illustrate the process involved in recording municipal tangible capital assets Outline: Setting up municipal equipment.
WVDOT GTI SECTION Status Update for Districts. AGENDA Introduction. Introduction. Status Update. Status Update. How to Spatially Enable Database. How.
WVDOT GTI SECTION Status Update for Miss Utility.
GASB 34: Asset Management and GIS Jarrod Gerbaud Hansen Information Technologies.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
The GFOA of BC and the Ministry of Community Services have joined together to assist BC local governments with the New TCA reporting requirements impacting.
2014 Budget Department Presentations Infrastructure Funding Options.
Tangible Capital Assets Where Are We At? What Next? AAMDC Spring Convention & Trade Show Edmonton, Alberta March 18, 2008.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Air Estates/Bald Eagle Estates) Improvement Project December 13, 2010.
SESSION 10 ASSET SEGMENT PRESENTED BY: NATIONAL TREASURY.
Old Corvallis Road Urban Renewal Program An Overview May 4 th, 2009.
Why PS 3150? Gordon Sparks, Ph.D.,P.Eng Gordon Sparks, Ph.D.,P.Eng.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
City of West Linn Fiscal Year 2009 Budget Tuesday.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 13 Civil Engineering Detail Drawings.
Transfer Payment and Financial Reporting Branch Ministry of Education Implementation of Tangible Capital Asset (TCA) Reporting TPFR Information Sessions.
An-Najah National University Civil Engineering Department Analysis of the Water Distribution Network of howara- Nablus Submitted by: Rami Ahmad Mohammed.
Watershed Modeling using HEC-HMS and EPA-SWMM ©T. G. Cleveland, Ph.D., P.E. 10 July 2012 Lesson 2.
1 Module 6, Part 3: PPE (Property, Plant and Equipment) 1. Costs to Capitalize 2. Depreciation 3. Asset Sale or Impairment 4. Disclosure 5. Ratios.
GFOA November 5, 2004 Fixed Asset Accounting - Proposals.
So Much To Do, So Little Time! Tangible Capital Assets LGAA Annual Conference Red Deer, Alberta March 13, 2008.
LOCAL GOVT. FINANCE: An Introduction to CAPITAL PLANNING Alan Probst, Local Government Specialist Local Government Center University of Wisconsin – Extension.
Yorba Linda Survey : Results Presented by: Andrea Galvin Planning Commission/ City Council Joint Session October 13 th, 7:00 p.m.
Mapping of Traffic Conditions at Downtown Thessaloniki with the Help of GPS Technology P. D. Savvaidis and K. Lakakis Aristotle University of Thessaloniki,
4/26/061 presents Project Crimson April 26, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
City of McCall Sanitary Sewer I&I Study Community Stewardship for Economic Benefits Nathan Stewart, PE, City Engineer Matt Neukom, PE, Project Manager.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Haldimand County DFA Infrastructure International Inc. Presentation to Committee of the Whole January 11 th, 2016 & Water O.Reg 453/07 Financial Plan 1.
WATER SYSTEM WORKSHOP February 27, 2012
Welcome Open House Public Information Session Reconstruction Project Brunswick Avenue (Guelph Street to Blucher Street) Guelph Street (Ellis Avenue to.
Asset Degradation Modelling at Townsville Water
Board of Commissioners Meeting
Limited Service Agreements
Proposed Draft Financial Plan April 10, 2017
Town of Clayton 2016 Pavement Condition Survey
Location Map.
Town of Mamaroneck 2015 Preliminary Budget
Janet Ferguson Treasurer, The Municipality of Lambton Shores
Manchester’s CSO Program: A Look Behind and a Look Ahead
Development Charge Public Meeting October 23, 2017
Water Department has Six Divisions
Site Plan Requirements
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Asset Management Journey
Kentucky County Treasurer’s Fundamentals Course
Challenges and Innovations in Municipal Asset Management Presented by: Bhupesh Sakalley, Project Manager Zimran Khokhar, Project Manager February 7th,
MS4 OVERVIEW 2015.
Walker Street Reconstruction Project 25% Design Public Hearing
Mohammad Khalid Sawalha
City of Spruce Grove Capital Region Partners Presentation 2019
Stream Crossing Replacement Policy
Presentation transcript:

Village of Denzil PS 3150 Pilot Project summary

Pilot Project Introduction A pilot project was initiated with the Village of Denzil to provide further guidance on tangible capital assets to Urban Municipalities'

Project Participants Village of Denzil Kathy Reschny VEMAX Management Gordon Sparks Nicole Allen Ministry of Municipal Affairs Kathy Rintoul Steve Brown Stark and Marsh Chris De jong

PS 3150 Case Study Village of Denzil Nicole Allen

PS 3150 Case Study Deliverables This presentation will illustrate the methods, used for the Village of Denzil pilot, to; ▫inventory linear assets (roads, water mains & sewer mains) ▫value linear assets

Pilot Project Steps Discussion with Village of Denzil Administrator ▫PS 3150 Policy ▫Asset classes for Village of Denzil Completion of Asset Register (VEMAX) ▫Inventory ▫Asset valuation Discussion and review of methods with Accounting Advisors (Stark and Marsh)

Pilot Project Steps This method is outlined in six basic steps, which include: 1.Development and Review of PS 3150 Policy 2.Determining Inventory Information Source 3.Determining Infrastructure Asset Types 4.Process Used for Inventorying Infrastructure Asset Types 5.Process Used for Valuing Infrastructure Asset Types 6.Inputting Information into the Asset Registerwww.sasktca.ca

Step 1. Development and Review of PS 3150 Policy A threshold of $5,000 was used for all individual assets in the Village of Denzil A threshold of $25,000 was used for all pooled assets in the Village of Denzil This threshold was reviewed with project accounting advisors

PS 3150 Policy Review Once the PS 3150 policy has been drafted it should be reviewed with both your auditor and your council prior to continuing on to step 2.

Step 2. Determining Inventory Information Source Village of Denzil has a population of approximately 142 people Linear Assets include ▫51,720 m 2 of Roads ▫3,244 m of Water mains water treatment plant, wells and reservoirs ▫3,405 m of Sanitary sewer mains Sewage Lagoons and lifts

Inventory Source Engineering plan drawings Engineering asbuilt drawings Municipality engineered plans Municipality maps GIS based maps Internet based maps

Inventory Source It was determined that the inventory would be completed off the Village Asbuilt Drawings These Asbuilt Drawings were provided by the Village of Denzil Assets depicted on the Asbuilt drawings include roads, back lanes, water mains, sewer mains

Additional Inventory Source For linear assets not included on the asbuilt drawing (eg. sidewalks, newer assets), a combination of municipal maps and local knowledge was used

Step 3. Infrastructure Asset Types There are many types of linear assets that need to be considered for urban municipalities. A list of urban linear assets for villages is listed, in part, in the following slides. Linear assets that were recorded in the village pilot are highlighted in bold. More asset classes are listed in Appendix C of the “TCA Reference Manual” which can be found at pdf.

Asset Types - Roads Road Structure (Land under road, Subgrade, Culverts) Road Surface (Gravel, Asphalt, etc.) Back Lanes (Structure, Surface) Curb and Gutter Swales Sidewalks and Paths (cement sidewalks, Asphalt paths)

Asset Types - Water Water mains (Hydrants, Valves, Reducers, etc.) Water services to lots Water source (Wells, nearby community, etc.) Water reservoirs Water treatment plant

Asset Types - Sewer Sewer mains (Manholes, Cleanouts, etc.) Sewer services to lots Sewage lagoon Sewage treatment

Asset Types – Storm water Storm water mains Storm water services Storm water holding ponds Storm water treatment

Step 4. Inventory of Linear Assets The methods used for inventory of the linear assets is broken down by asset type

Road Infrastructure Includes ▫Road Structure ▫Road Surface ▫Back Lanes ▫Sidewalks

Road as 1 or 2 Assets? Some sources recommend recording roads as 2 separate assets (the road structure and the road surface) ▫This accounts for the difference in useful life between the road structure and surface

Road as 1 or 2 Assets? Accounting advisors review determined that: ▫Village of Denzil gravel surfaced roads could be inventoried as a single asset (structure and surface combined)

Inventory of Road Structure Roads were inventoried using the Asbuilt Drawings With the addition of road width, road type and year of construction from Village staff

Road Inventory Method 1. The road assets were segmented based on village blocks. 2.A single road asset was measured from the middle of one intersection to the middle of the next intersection 3.The length of the road segment was determined using the scale provided on the asbuilt drawings. 4.The width of the road was determined by Village staff. It is important to note that most plans illustrate the road right of way not the actual usable road. The road right of way width often includes sidewalks and ditches and is not all usable road.

Road Inventory Method 5.The area of the road segment was calculated by multiplying the road width by the road segment length (road area is used in the valuation process). 6.The years of construction for roads in the pilot were determined by Village staff. 7.The asset useful life was estimated in Step 1: Development and Review of PS 3150 Policy. For the pilot, roads were assigned a useful life of 40 years.

Inventory of Back lanes Back lanes were inventoried using the Asbuilt Drawings With the addition of lane width, lane surface and year of construction from Village staff

Back Lane Inventory Method 1.The back lanes all had a gravel surface and were inventoried as a single asset (surface and structure) 2. The back lanes were segmented based on village blocks 3. Segments were measured from the edge of the west adjacent road to the edge of the east adjacent road 4. The length of the back lane segments was scaled from the asbuilt drawings

Back Lane Inventory Method 5. The width of the back lane was determined by Village staff 6. The area of the back lane was calculated by multiplying the back lane segment length by the back lane width 7. The years of construction for the back lanes were determined by Village staff 8. The pilot policy assigned a useful life of 40 years to back lanes

Inventory of Sidewalks Sidewalks were inventoried using a Municipal Map Village staff provided sidewalk location, width and year of construction

Sidewalk Inventory Method 1.Village staff sketched the locations and widths of all sidewalks on the municipal map 2. The sidewalks were segmented by Village blocks 3. Segments were measured from the west adjacent road to the east adjacent road 4.The lengths of the sidewalks were scaled from the village map

Sidewalk Inventory Method 5. The widths of the sidewalks were determined by Village staff 6. The years of construction for sidewalks in the pilot was determined by Village staff 7. The pilot policy assigned a useful life of 30 years to sidewalks

Inventory of Water mains Water mains were inventoried using the Asbuilt Drawings With advice from Village staff regarding any recently constructed water mains

Water Main Inventory Method 1.The water mains were segmented by Village block. 2.Water main segments were measured from the center of one intersection to the center of the next adjacent intersection - If the properties of the pipe change within that segment (i.e. pipe diameter, year of construction, etc.) the segment needs to be divided to reflect unique properties for each segment 3.Water main features (i.e. valves, hydrants, etc.) were not individually inventoried and were assumed to be included with the water main.

Water Main Inventory Method 4.Water services to individual lots were not inventoried and are assumed to be included with the water main 5.The asbuilt drawings list water main properties including year of construction, pipe size, and material type 6.The length of each water main was scaled from the asbuilt drawings 7.In the pilot policy water mains were assigned a useful life of 75 years

Inventory of Sanitary mains Sanitary mains were inventoried using the Asbuilt Drawings With advice from Village staff regarding any recently constructed sanitary mains

Sanitary Main Inventory Method 1.The sanitary sewers were segmented based on sanitary manholes 2.Sanitary segments were measured from the upstream manhole to the next manhole 3.Sanitary features (i.e. cleanouts, manholes) were not inventoried individually and were assumed to be included with the sanitary main 4.The asbuilt drawings list most required information for the sanitary mains including year of construction, pipe size, material type and segment length 5.In the policy sanitary mains were assigned a useful life of 75 years

5. Valuing Infrastructure Inventory When valuing assets it is important to consider the relative importance of the information you are searching for. PS 3150 is not intended to be a task in recovering information from 40 years ago. To determine what level of detail is required for the valuation the following chart can be used.

Valuation Flow Chart

Roads - Valuation Flow Chart All but one road were past the useful life The remaining road, had no historical cost

Estimating Replacement Costs How can replacement costs be estimated if required? The Urban Linear Asset Costing Survey has a summary of replacement costs for all asset types and will be distributed in early October

Road Replacement Costs From the Linear Costing Survey: Estimated replacement cost of gravel roads ▫~ $24.55 /m 2 This estimated unit cost of $24.55 /m 2 then be multiplied by the road area found in Step 4.

Back lanes - Valuation Flow Chart All back lanes are past the useful life

Sidewalks- Valuation Flow Chart All sidewalks are past the useful life

Water mains - Valuation Flow Chart All water mains have remaining useful lives

Water main Replacement Costs From the Linear Costing Survey: All water mains in the Village of Denzil are 150mm Estimated replacement cost of 150mm water main without services ▫~ $ /m Estimated replacement cost of 150mm water services ▫~ $44.01 /m

Water main Replacement Costs Therefore to calculate the estimated replacement cost, of a 150mm water main in Dalmeny, with services ▫$ /m + $44.01 /m = $ /m This estimated unit cost of $ /m can then be multiplied by the pipe length found in Step 4 to determine the segment replacement cost.

Sanitary Mains - Valuation Flow Chart All sanitary mains have remaining useful lives

Sanitary main Replacement Costs From the Linear Costing Survey: All sanitary mains in the Village of Denzil are 200mm Estimated replacement cost of 200mm sanitary main without services ▫~ $ /m Estimated replacement cost of 200mm sanitary services ▫~ $81.20 /m

Sanitary main Replacement Costs Therefore to calculate the estimated replacement cost, of a 200mm water main in Dalmeny, with services ▫$ /m + $81.20 /m = $ /m This estimated unit cost of $ /m can then be multiplied by the pipe length found in Step 4 to determine the segment replacement cost.

6. Inputting Information into Asset Register This will not be covered in this webinar A webinar for use of the Asset Register is available on the website, under the resources tabwww.sasktca.ca

Other Assets

General Assets Include ▫Land ▫Land Improvements ▫Buildings ▫Cultural & Historical Assets ▫Machinery & Equipment ▫Vehicles ▫Etc.

General Assets The following tools are available for help with inventorying and valuing general assets ▫Pilot Project Summaries (available October) ▫RM of Buckland Pilot presentation (sasktca.ca)  PS 3150 Project Summary (RMAA Presentation) PS 3150 Project Summary (RMAA Presentation) ▫Town of Dalmeny Pilot presentation (sasktca.ca)  Presentation slideshow part 2 - Nicole Allen/Shelley Funk Presentation slideshow part 2 - Nicole Allen/Shelley Funk

Questions and Answers