Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Bergen County Utilities Authority Bergen County Utilities Authority Little Ferry, New Jersey Rain Derived Infiltration/Inflow Reduction and Sanitary Sewer.
Onondaga County CSO Abatement Gray Project Update.
City of Berea North End Area Sewer Investigation Project- Phase I Commencing Fall 2011.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
Greeley and Hansen Agenda New Rules For Sanitary Sewer Systems EPA Enforcement Overflow from a Manhole on to the Ground – into a stream, into a basement.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
Storm Water Mitigation Program March 17, Purpose of the Program Connections to the public sewer system within private residences or on private property.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
Workshop on Clear Water Cross Connections & Inspections 7/23/2012.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Wastewater Neighborhood Meetings Code of Conduct: Be willing - participate fully; Be Kind - treat others with dignity and respect; Be open - consider new.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
1 Milwaukee Metropolitan Sewerage District Legislative Audit Bureau November 2003.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
MMSD’s Infiltration and Inflow Private Property Program Purpose of the program is to reduce infiltration and inflow from private property to.
Presentation to Maxwell Place Homeowners Association 1.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
Biennial Budget Budget Message Presented by Chris Jordan, City Manager April 27, 2009.
S A V E - R - B A Y North Bay Watershed Association September 11, 2009 Lateral Program Update Seeking to Resolve a Difficult Public / Private.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
Brockton Redevelopment Authority The BRA is a quasi-public agency contracted by the City of Brockton that is tasked with community development and economic.
Hallstead Borough and the Northern Susquehanna River Watershed Association presents Hallstead Borough and the Northern Susquehanna River Watershed Association.
Downtown PRESENTATION Tuesday, May 3, 2011 R/C Theaters Movies 14.
Separating Inflow Reduction From Infiltration Removal Using Simple Tools Frederick Bloetscher, PhD, PE Florida Atlantic University.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Aires Estates/Bald Eagle Estates) Improvement Project October 11, 2010.
Paper # LOS ANGELES COUNTY PRIORITIZATION OF SEWER REHABILITATION PROJECTS Fernando Villaluna, P.E. 1.
5/29/021 Informational Meeting May 29, 2002 Perry Township Administration Building Fourth Street/Bowman Road Sewer Improvement Area.
August 4, 2008 Smoke Testing Public Informational Meeting Smoke Testing Project – University/Prior Avenue Area Hamline Midway Library August 4, 2008 Short.
Smoke Testing Information
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
Omaha CSO Gilmore Avenue Sewer Separation South Omaha Neighborhood Alliance May 17, 2012.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
Aaron Cosentino City of Elgin Rob Linke, P.E., CFM Trotter & Associates, Inc. Lord Street Basin CSO Green Infrastructure Retrofit Project November 14,
Detroit 0% Interest Home Repair Loan Program 1 CITY OF DETROIT HOUSING & REVITALIZATION DEPARTMENT Program grant sub-recipient overseeing loan capitalization.
Effectiveness of Private Property Infiltration and Inflow Reduction efforts in East Tosa October 14, 2014: Wauwatosa Budget and Finance Committee Meeting.
Comprehensive Thinking and Planning
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
LFUCG Group 1 Remedial Measures Plans September, 2011 Presentation to Lexington-Fayette Urban County Residents.
South Central Economic Development District. Community Development Block Grants For Housing Housing grants support rehabilitation of owner- and renter-occupied.
City of Sausalito Sewer CIP Vivian Housen, P.E. V. W. Housen & Associates March 25, 2015.
VILLAGE OF SHOREWOOD PPII REDUCTION PROGRAM. Shorewood’s response to the 2010 flooding has been direct and decisive Immediately start identifying problems.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Agenda Updates to Driveway and Sidewalk specifications and permits
Welcome to the Libertyville Stormwater Master Plan Open House
Separating Inflow Reduction and Infiltration Removal
Marquis Hills Area Information Meeting December 7, 2016
“NYC Build” Presentation
Location Map.
107th & 110th Avenue North Public Utilities Renewal Projects
Springbrook Estates Sewer Improvement Area Informational Meeting
Rehabilitation Program impact on Sewer Management
Water Department has Six Divisions
Residential Sewer Lateral Maintenance Program Analysis
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
[OUR CITY NAME]’S OLD SEWERS
Fixing Our City’s Old Sewers
Housing Rehabilitation Program
2019 Capital Program Title of Presentation
2020 DWRF Project Plan Kalamazoo, Cooper and Parchment
Smoke Testing for Sewer Evaluations
Presentation transcript:

Department Of Public Works Environmental Engineering Section Inflow and Infiltration (I/I) Demonstration Project Sanitary Sewer Lateral Lining 1 City of Milwaukee, Environmental Engineering Willie C. Wade, Alderman 7 th District Zafar Yousuf, Sewer Design Manager City of Milwaukee Wednesday October 17 th, 2012

2 City of Milwaukee, Environmental Engineering What Area is Included in this Project?

3 City of Milwaukee, Environmental Engineering The purpose of this project is to reduce rain water from entering into the sanitary sewers, ultimately reducing the chances of basement flooding from sanitary sewer backups. The purpose of this project is to reduce rain water from entering into the sanitary sewers, ultimately reducing the chances of basement flooding from sanitary sewer backups. City of Milwaukee I/I Demonstration Project

4 City of Milwaukee, Environmental Engineering This project will focus on rehabilitating sanitary building sewers, also known as laterals, which is the pipe connecting the plumbing in your house to the City of Milwaukee sanitary sewer. This project will focus on rehabilitating sanitary building sewers, also known as laterals, which is the pipe connecting the plumbing in your house to the City of Milwaukee sanitary sewer. City of Milwaukee I/I Demonstration Project

City of Milwaukee, Environmental Engineering5 How Do Basement Backups Happen? During heavy rain storms, rain water enters into sanitary sewers through various defects. The amount of water in the sewer system can rise above your basement floor level, causing sewer backups. During heavy rain storms, rain water enters into sanitary sewers through various defects. The amount of water in the sewer system can rise above your basement floor level, causing sewer backups.

6 City of Milwaukee, Environmental Engineering In July 2010, the City of Milwaukee received over 10,000 complaints of flooding and basement backups. In July 2010, the City of Milwaukee received over 10,000 complaints of flooding and basement backups. Certain areas of the City of Milwaukee, including this area, were selected as a priority for sewer rehabilitation based on high concentrations of reported backups and flooding. Certain areas of the City of Milwaukee, including this area, were selected as a priority for sewer rehabilitation based on high concentrations of reported backups and flooding. In this area, over 62% (280 of 449) of residents reported basement backups in July In this area, over 62% (280 of 449) of residents reported basement backups in July In this area since 2010, The City of Milwaukee has completed $1.04 Million in public sanitary sewer main rehabilitation and replacement, with an additional $400,000 in sewer replacement proposed for In this area since 2010, The City of Milwaukee has completed $1.04 Million in public sanitary sewer main rehabilitation and replacement, with an additional $400,000 in sewer replacement proposed for Why Your Neighborhood Was Selected

7 City of Milwaukee, Environmental Engineering This project consists of inspecting and rehabilitating the sanitary building sewers (laterals) of homes. This project consists of inspecting and rehabilitating the sanitary building sewers (laterals) of homes. This program is 100% voluntary and the homeowners will not incur any costs. This program is 100% voluntary and the homeowners will not incur any costs. The estimated cost of the project is $3.6 million, which will be funded primarily through a grant from the Milwaukee Metropolitan Sewerage District (MMSD). The estimated cost of the project is $3.6 million, which will be funded primarily through a grant from the Milwaukee Metropolitan Sewerage District (MMSD). The City will work with residents to minimize disruptions and inconvenience for the duration of the project. The City will work with residents to minimize disruptions and inconvenience for the duration of the project. Project Details

8 City of Milwaukee, Environmental Engineering What will be done? A camera will be inserted in the lateral from the sewer main in the street. The condition of the lateral is then assessed for rehabilitation and/or repair.

9 City of Milwaukee, Environmental Engineering What will be done? A small 2 foot diameter excavation will be made in the yard as close to the house as possible.

10 City of Milwaukee, Environmental Engineering What will be done? A cleanout will be installed on the existing sewer lateral.

11 City of Milwaukee, Environmental Engineering What will be done? The hole will then be filled and the cleanout capped.

12 City of Milwaukee, Environmental Engineering What will be done? The lateral will be cleaned and prepared for rehabilitation.

13 City of Milwaukee, Environmental Engineering What will be done? The liner will then be prepared for installation.

14 City of Milwaukee, Environmental Engineering What will be done? The liner will be installed in the lateral and cured in place.

15 City of Milwaukee, Environmental Engineering After Rehabilitation Upon completion of the project, the yard will be restored.

16 City of Milwaukee, Environmental Engineering After Rehabilitation No concrete or shrubs will be disturbed during the project.

17 City of Milwaukee, Environmental Engineering Before and After Rehabilitation Before – Lateral is cracked and deteriorated. Water from the ground can enter the lateral freely. After – Lateral is smooth and sealed. Water from the ground can no longer enter the lateral.

18 City of Milwaukee, Environmental Engineering Why was this method chosen? Renews the sewer lateral with minimal disturbance to the property. Eliminates root infiltration problems and other minor defects.

19 City of Milwaukee, Environmental Engineering Why was this method chosen? Creates a one-piece pipe with no joints, eliminating groundwater infiltration. Creates a one-piece pipe with no joints, eliminating groundwater infiltration. Only requires a short period of limited water use, typically 8 hours or less. Other methods require longer periods of restricted water usage. Only requires a short period of limited water use, typically 8 hours or less. Other methods require longer periods of restricted water usage. Same proven method that was used in the Cooper Park area in 2012 and had 97% positive feedback. Same proven method that was used in the Cooper Park area in 2012 and had 97% positive feedback.

20 City of Milwaukee, Environmental Engineering Tentative Schedule of Work December 2012 – Invitation for bids. December 2012 – Invitation for bids. January 2013 – Contract award. January 2013 – Contract award. March / April 2013 – Lateral rehabilitation work may begin with inspections and cleanout installations. March / April 2013 – Lateral rehabilitation work may begin with inspections and cleanout installations. Late September Lateral rehabilitation project completion. The actual completion date will vary based on number of homes participating. Late September Lateral rehabilitation project completion. The actual completion date will vary based on number of homes participating.

21 City of Milwaukee, Environmental Engineering Goals Lower the amount of I&I in the sanitary sewer system. Lower the amount of I&I in the sanitary sewer system. Reduce the chances of having basement backups during a heavy rain event. Reduce the chances of having basement backups during a heavy rain event. Improve public health and overall quality of life in the City of Milwaukee. Improve public health and overall quality of life in the City of Milwaukee. For more information, please visit: For more information, please visit: