Permitting and Design Guidelines Working with Regulators Melissa Mormilo, P.E., LEED AP DOWL Engineers.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Metro Muncipal Agreement Program
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Erosion & Sediment Control Program Steven Gucciardi, CPESC
CREW CAMP ENVIRONMENTAL REVIEW L. David Glatt, P.E. North Dakota Department of Health Environmental Health Section.
Subdivision Plat Submittals Subdivision Plat Submittals
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
What is NPDES? “National Pollutant Discharge Elimination System”
Water Main Extension Permits Interplan LLC Richard Lott, P.G., P.E. Program Manager-Drinking Water February 18,
Stormwater, Wellhead Protection and Drainage Issues Public Hearing.
Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013 Ohio’s Composting Program Barry Chapman and Jen Hagar.
1 WELCOME MAP “TUNE-UP” WORKSHOP September 19-20, 2007.
NPDES REQUIREMENTS. Pollution Control is Contractor’s responsibility PennDOT is responsible for enforcement Its our Public Duty Environmental compliance.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
Permits. The Process Plans are developed by an Architect or Engineer and presented to the Municipality – State Environmental Quality Review (SEQR) declaration.
Engineering and Technical Plans Description, process and standards Dh 2005.
Staying on Top of Permits & Public Comments Public Comments Policy Track: Sunday, February 28, :30 pm.
National Pollutant Discharge Elimination System(NPDES) Permit.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Sharman S. Brooks Senior Planner Kristine Goddard, AICP Principal Planner
RIPDES Storm Water Program: Large and Small Construction.
Remarks will print on the completed form Generate Quantity Book Entry Generate Pay Quantity.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
1 The Plan and Plan Review Issued May 2009 Level IB: Advanced Fundamentals Seminar Education and Training Certification Requirements for Persons Involved.
Procedures for Applying for an Alternative Oyster Culture Permit Oyster Advisory Committee April 18, 2013 ________________________________________.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
PLANNING DEPARTMENT CITY OF PEARLAND PLANNING DAY MARCH 13, 2008.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
The Clean Water Act © Dr. B. C. Paul (Jan. 2000).
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
Connecticut Department of Energy and Environmental Protection.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Environmental Decision Making SC.912.L Why have environmental laws?  To regulate activities that are harmful to the environment. a. E.g., Clean.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Slide 1April 8, 2015, Financial Assistance Council Meeting.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
IT’S THE 11 TH HOUR And General Engineering is … HOLDING US UP!
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
The Clean Water Act (1977, 1981, 1987) By: Jonas Szajowitz.
Permit Process & Application Guide
Water and Wastewater Infrastructure Project Financing 1.
Environmental Mitigation and ePM Project Commitment Database.
Pollution Control: For Field Office Construction Sites.
Joy Patterson, Principal Planner City of Sacramento March 16 th, 2016 For the 2016 Planning Academy.
Crabtree, Rohrbaugh & Associates, Architects Montoursville Area School District Value Engineering Study Analysis February 23, 2016.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
City of Clarksville Storm Water Management Manual Revisions 2014.
Subdivision Review Star Valley Conservation District February 25, 2016.
Water Efficiency Ordinance ZCA No. 750
Contractor Submissions
Construction Oversight
State Aid Plan Approval Process
Model Water Efficient Landscape Ordinance
The Clean Water Acts of 1977, 1981, & 1987
CONSTRUCTION REGULATIONS AND CODES
Belpre Construction / Post Construction
Flow chart to determine whether coverage is required
Use of Domestic Reclaimed Water
USES OF DOMESTIC RECLAIMED WATER
Project Manager / Utility Liaison
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Permitting and Design Guidelines Working with Regulators Melissa Mormilo, P.E., LEED AP DOWL Engineers

Regulatory Agencies Municipality of Anchorage Municipality of Anchorage City or Borough City or Borough Anchorage Water and Wastewater Utility Anchorage Water and Wastewater Utility Alaska Department of Environmental Conservation Alaska Department of Environmental Conservation U. S. Fish and Wildlife U. S. Fish and Wildlife Environmental Protection Agency Environmental Protection Agency State of Alaska Department of Transportation and Public Facilities State of Alaska Department of Transportation and Public Facilities U.S. Army Corp of Engineers U.S. Army Corp of Engineers

What Needs to be Permitted? Grading Grading Drainage Drainage Water service Water service Sewer service Sewer service Driveways Driveways Wetland/Waterways Wetland/Waterways Floodplain Floodplain Coastal Zone Coastal Zone

Grading Who is permit authority? Who is permit authority? MOA, City or Borough MOA, City or Borough What is required? What is required? Permit Application Permit Application Signed Grading Plan Signed Grading Plan How long does it take? How long does it take? 6 to 8 weeks to obtain permit 6 to 8 weeks to obtain permit

Drainage Who is permit authority? Who is permit authority? MOA (Within MOA) MOA (Within MOA) ADEC (Outside MOA) ADEC (Outside MOA) What is required? What is required? MOA MOA SWPPP (Project 1 acre or more) SWPPP (Project 1 acre or more) Erosion and Sediment Control Plan Erosion and Sediment Control Plan ADEC ADEC SWPPP SWPPP Pre- and Post- Drainage Plan Pre- and Post- Drainage Plan How long does it take? How long does it take? 6 to 8 weeks to obtain permit 6 to 8 weeks to obtain permit

Water Service Who is permit authority? Who is permit authority? AWWU (Within MOA) AWWU (Within MOA) ADEC (Outside MOA) ADEC (Outside MOA) What is required? What is required? AWWU AWWU Permit Application Permit Application Fee Fee Signed Plan and Profile Drawings Signed Plan and Profile Drawings ADEC ADEC Permit Application Permit Application Fee Fee Signed Plan and Profile Drawings Signed Plan and Profile Drawings How long does it take? How long does it take? AWWU – 4 to 6 weeks AWWU – 4 to 6 weeks ADEC – 6 to 8 weeks ADEC – 6 to 8 weeks

Sewer Service Who is permit authority? Who is permit authority? AWWU (Within MOA) AWWU (Within MOA) ADEC (Outside MOA) ADEC (Outside MOA) What is required? What is required? AWWU AWWU Permit Application Permit Application Fee Fee Signed Plan and Profile Drawings Signed Plan and Profile Drawings ADEC ADEC Permit Application Permit Application Fee Fee Signed Plan and Profile Drawings Signed Plan and Profile Drawings How long does it take? How long does it take? AWWU – 4 to 6 weeks AWWU – 4 to 6 weeks ADEC – 6 to 8 weeks ADEC – 6 to 8 weeks

Driveways Who is permit authority? Who is permit authority? MOA MOA ADOT&PF ADOT&PF If intersecting ADOT&PF ROW If intersecting ADOT&PF ROW City or Borough City or Borough What is required? What is required? Permit Application Permit Application Fee Fee Drawings showing driveway design Drawings showing driveway design TIA (if required) TIA (if required) How long does it take? How long does it take? 8 weeks to 12 weeks 8 weeks to 12 weeks

Wetlands/Waterways Who is permit authority? Who is permit authority? MOA MOA Type C Wetlands Type C Wetlands U.S. Army Corp of Engineers U.S. Army Corp of Engineers U.S. Fish and Wildlife U.S. Fish and Wildlife What is required? What is required? Permit Application Permit Application Fee Fee Drawings showing the wetlands or work below ordinary high water mark impacts Drawings showing the wetlands or work below ordinary high water mark impacts Calculations Calculations Amount of Fill in Wetlands Amount of Fill in Wetlands Acres of Disturbance Acres of Disturbance How long does it take? How long does it take? 8 weeks to 1 year 8 weeks to 1 year

Floodplain Who is permit authority? Who is permit authority? MOA MOA Within MOA Within MOA City or Borough City or Borough What is required? What is required? Permit Application Permit Application Fee Fee Drawings showing the floodplain impacts Drawings showing the floodplain impacts Calculations Calculations Drainage Calculations Drainage Calculations How long does it take? How long does it take? 8 weeks to 1 year 8 weeks to 1 year

Coastal Zone Who is permit authority? Who is permit authority? ADNR ADNR What is required? What is required? Application/questionnaire Application/questionnaire Cover letter Cover letter How long does it take? 30 to 60 days 30 to 60 days

Miscellaneous Permits ADOT&PF ADOT&PF Utility Permits Utility Permits Approach Road Review Approach Road Review Other Agency Review Other Agency Review U.S. Fish and Wildlife Permit U.S. Fish and Wildlife Permit Fish Habitat Fish Habitat

Other things to Consider Variance Variance P&ZC and UDC hearings P&ZC and UDC hearings Platting Platting Letters of non-objection Letters of non-objection Access and Parking Agreements Access and Parking Agreements Other Agreements (drainage, no-build) Other Agreements (drainage, no-build) If you anticipate what is needed for these items, you won’t be scrambling when the contractor is screaming for a permit!

Permit Process Submit Required Documentation Submit Required Documentation Wait for Comments Wait for Comments Address Comments Address Comments Resubmit Drawings (if required) Resubmit Drawings (if required)

Addressing Comments How? How? In person In person By letter By letter Via (with caution) Via (with caution) Remember: You need the permit # no matter how you address comments! Check for MOA review comments on-line! Be Proactive! Don’t wait for architect or contractor to give you the comments to address!

Resubmitting Drawings Bring sets of revised drawings and (re)submittal form Bring sets of revised drawings and (re)submittal form Check with Agency regarding how many copies Check with Agency regarding how many copies Meet with reviewer Meet with reviewer Change drawings out (if applicable) Change drawings out (if applicable) Make sure old drawings are superseded and new drawings are stamped with permit # and date!

Documentation What should you keep copies of? What should you keep copies of? Entire submittal package Entire submittal package Review comments generated by Agency Review comments generated by Agency Response to review comments (with documentation) Response to review comments (with documentation) Sign-offs by reviewers Sign-offs by reviewers Drawings, s, phone conversations regarding comments, resolution and signoff Drawings, s, phone conversations regarding comments, resolution and signoff Copies of revised drawings and specs Copies of revised drawings and specs

Documentation Send it to project file Send it to project file Send copies to the client, design team contractor for their use (cc appropriately) Send copies to the client, design team contractor for their use (cc appropriately) Remember to distribute revised drawings and specs!

Keep in Mind Timelines for required permits, sign-offs, etc. Timelines for required permits, sign-offs, etc. How permits/sign-offs relate to one another How permits/sign-offs relate to one another Lead time for signatures and fees Lead time for signatures and fees

Design Guidelines MOA MOA Title 21 Title 21 MOA Design Criteria Manual MOA Design Criteria Manual Special Provisions Special Provisions Handouts Handouts Wetlands and Floodplain Mapping Wetlands and Floodplain Mapping AWWU AWWU Design and Construction Practices Manual Design and Construction Practices Manual City or Borough City or Borough Design Guidelines Design Guidelines Special Provisions Special Provisions Floodplain Mapping Floodplain Mapping

Design Guidelines EPA EPA NPDES NPDES On-Site Wastewater Treatment Systems Manual On-Site Wastewater Treatment Systems Manual ADEC ADEC Drinking Water Regulations Drinking Water Regulations Wastewater Regulations Wastewater Regulations Storm water Regulations Storm water Regulations ADOT&PF ADOT&PF Special Provisions Special Provisions Pre-Construction Manual Pre-Construction Manual

QUESTIONS?