Fay, Spofford & Thorndike TOWN OF BELMONT WINN’S BROOK SEWER OVERFLOW MITIGATON Presentation to the BOARD OF SELECTMAN December 7, 2009.

Slides:



Advertisements
Similar presentations
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Advertisements

Bergen County Utilities Authority Bergen County Utilities Authority Little Ferry, New Jersey Rain Derived Infiltration/Inflow Reduction and Sanitary Sewer.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Washington Avenue Reconstruction Project City of Chelsea Public Informational Meeting May 31, 2011.
City of Clinton Fiscal Year 2013 Sewer Rate Recommendations Committee of the Whole April 24, 2012.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
October Storm Flows City of Worcester DPW & Parks Department, Sewer Operations Division January 26,2006.
1 Informational Meeting March 5, 2003 Perry Township Administration Building Delmar Addition/Glenn Avenue Sewer Improvement Area.
Greeley and Hansen Agenda New Rules For Sanitary Sewer Systems EPA Enforcement Overflow from a Manhole on to the Ground – into a stream, into a basement.
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
Presented by NEORSD Richard J. Switalski, P.E. Presented by NEORSD Richard J. Switalski, P.E.
1 CE 548 Analysis and Selection of Wastewater Flowrates and Constituent Loading.
MARCH 4, ND ANNUAL AIRPORT CONFERENCE HERSHEY, PA Innovative Approaches for Managing Stormwater Runoff: Constructed Wetlands.
Massachusetts Water Resources Authority Presentation to American Council of Engineering Companies April 11, 2013 Michael J. Hornbrook Chief Operating Officer.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
Timeline of Key Milestones and Dates DateKey Milestone February 2007Washtenaw County Drain Commissioner’s Office authorizes a project to identify opportunities.
Evaluation of CSO Control Alternatives in Small Communities Michael Sullivan Limno-Tech, Inc.
Fox Valley OperatorsAssociationCMOM Capacity Management Capacity ManagementOperationMaintenance January 2011 C apacity M anagement O peration & M aintenance.
Massachusetts Water Resources Authority Frederick A. Laskey Executive Director 20 Years of Change: Boston Harbor Pollution Abatement Project Timelines.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
1 The fully constructed combined sewer overflow (CSO) program will reduce CSOs by 96% and over 98% in the Anacostia River alone, relieve flooding in northeast.
Chicago Transit AuthorityJune, 2007 Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
The City of North Bend Sanitary Sewer System
- SEWER REHABILITATION - A TEN-STEP STRATEGIC PLAN GEORGE KURZ, P.E., DEE * A significant portion of this work was conducted.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
SSES and GIS, A Great Partnership Cindy Fort, PE Technical Director Environmental Engineering and Jeff McCann GIS Coordinator.
Special Order by Consent Wastewater Collection Improvement Projects Mark Fisher and Dennis Asbury Final Report to City of Eden October 20, 2009.
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
Separating Inflow Reduction From Infiltration Removal Using Simple Tools Frederick Bloetscher, PhD, PE Florida Atlantic University.
Facilities Plan Update July 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
South Fork improvements program – a mid-program report
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
Metropolitan Council Environmental Services A Clean Water Agency Proposed Combined Sewer Overflow Changes Environment Committee March 11, 2008 Keith Buttleman.
Approaches to CSO Control Adrienne Nemura, P.E. Limno-Tech, Inc.
Omaha CSO Gilmore Avenue Sewer Separation South Omaha Neighborhood Alliance May 17, 2012.
Frederick A. Laskey Welcome to the EBC Breakfast Meeting The CSO Program Update Frederick A. Laskey Executive Director Massachusetts Water Resources Authority.
Public Information Meeting Wastewater Treatment January 26, 2016.
Multi-Jurisdictional-Use Facilities Flow Analysis Study Update Presented to Blue Plains Regional Committee March 24, 2011 District of Columbia Water and.
Using New Jersey’s State Revolving Fund to Reduce Combined Sewage Flooding in Camden City Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer.
Kevin Colvett, P.E. Nashville Corrective Action Plan and Engineering Report, Phase III for Metro Water Services and the City of Brentwood, TN Presentation.
City of Belmont Pavement Reconstruction Project October 15, 2014.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
City of McCall Sanitary Sewer I&I Study Community Stewardship for Economic Benefits Nathan Stewart, PE, City Engineer Matt Neukom, PE, Project Manager.
Aaron Cosentino City of Elgin Rob Linke, P.E., CFM Trotter & Associates, Inc. Lord Street Basin CSO Green Infrastructure Retrofit Project November 14,
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
Effectiveness of Private Property Infiltration and Inflow Reduction efforts in East Tosa October 14, 2014: Wauwatosa Budget and Finance Committee Meeting.
SMALL BUSINESS OPPORTUNITY FORUM Water Department 2015 Capital Program & 2016 Outlook.
Spring 2009 Town Meeting Article 41 East Framingham Sewer Improvement Project (EFSIP) May 2009 Town of Framingham Department of Public Works "Preserving.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
Town Branch Wet Weather Storage Public Information Meeting February 19, 2014 Lexington Fayette Urban County Government Division of Water Quality.
February 26, 2013 City of Sausalito Status Update on EPA Order Compliance (and new 2012 NPDES Permit)
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
Welcome to the Libertyville Stormwater Master Plan Open House
Presented by Cory Foreman
Update on PI Modeling and Nitrogen Removal at Blue Plains
Sewer System Presentation
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Separating Inflow Reduction and Infiltration Removal
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Manchester’s CSO Program: A Look Behind and a Look Ahead
Measure A Financial Oversight Committee August 7, 2013
Study of Miles City Slough
Facilities Plan Update
Hidden Capacity How Proper Maintenance and Cleaning of Sewer Systems Can Have Huge Benefits! Presentation by the Jersey Water Works CSO Committee For the.
Presentation transcript:

Fay, Spofford & Thorndike TOWN OF BELMONT WINN’S BROOK SEWER OVERFLOW MITIGATON Presentation to the BOARD OF SELECTMAN December 7, 2009

Fay, Spofford & Thorndike Presentation Objectives Project background Causes of sewer overflows Conceptual design and modeling Final Design Opinion of probable construction cost Funding Schedule

Fay, Spofford & Thorndike Winn’s Brook Area Low lying area in Northeast Belmont Close proximity to MWRA connection on Flanders Road 85% of Belmont tributary to Flanders Road Extensive upstream sewer system Two different sewer subsystems

Fay, Spofford & Thorndike The Problem Periodic sanitary sewer overflows and backups into basements of homes in the Winn’s Brook Area

Fay, Spofford & Thorndike

Reported Backups DatesNumberRainfall (inches) October June March May

Increased Hydraulic Grade Line Creates Sewer Backups HGL

Fay, Spofford & Thorndike Causes of an Increased Hydraulic Grade Line (HGL) System Capacity Constraints Infiltration/Inflow in Belmont –2007 Flow Monitoring Program Elevated downstream HGL –Flanders Road Connection to the MWRA

Fay, Spofford & Thorndike Project Timeline 2005 – Geographical Information System (GIS) –InfoWorks Sewer Model Used by Cambridge & MWRA 2006 – Winn’s Brook Area Study 2007 – State (SRF) Loan Application 2009 – Final Design

Fay, Spofford & Thorndike Solution Constraints No transference of the problem to Cambridge or significant increase in flow to MWRA interceptor No transference of problem within Belmont Continued I/I reduction will be required –2009 Sewer System Evaluation Survey

Fay, Spofford & Thorndike Mitigation Concepts Increase sewer capacity Flow diversion Storage Isolation and Pumping I/I Removal 13 Mitigation Alternatives Modeled

Fay, Spofford & Thorndike Collaboration with the City of Cambridge Cambridge integrated Belmont’s model into the complete downstream system model Key in refining the selected Alternative NO ADVERSE IMPACT TO CAMBRIDGE NO INCREASED CSO RELEASE (MWRA)

Fay, Spofford & Thorndike Selected Alternative No. 12 Isolate Winn’s Book Area during elevated HGL conditions –New sewers and diversion structures –Divert flow to an off-line pumping station Divert upstream flow –Dean Street –Leonard Street & Alexander Ave. In-line storage conduit (Dean St) –Restricted discharge 15% Townwide I/I reduction

Fay, Spofford & Thorndike

Predicted Impact at Key Manholes Outside Winn’s Brook Area (MH rim to HGL) HamiltonBakerOliverChanning Baseline (May 2006) Alt. 12 (15 % I/I red)

Fay, Spofford & Thorndike Flanders Road Predicted Discharge May 2006 Mother’s Day Storm Peak Discharge MGD 24-Hour Volume MG Baseline Alternative Difference1.98%-2.84%

Fay, Spofford & Thorndike

Opinion of Probable Construction Cost - Contract 3 Base Bid Winn’s Brook Sewer Overflow Mitigation Facilities $6.6 Million Additive Alternates Townwide I/I Removal $1.4 Million TOTAL$8.0 Million

Fay, Spofford & Thorndike Project Funding $11.6 M State Revolving Loan (SRF) –ARRA “Shovel Ready” Projects Contract 1 – Wellington Brook Area Sewer and Storm Drain Improvements Contract 2 – Stony Brook Road and Woodbine Road Pump Station Replacement Contract 3 – Winn’s Brook Area Sewer Overflow Mitigation

Fay, Spofford & Thorndike Winn’s Brook – Contract 3 Construction Schedule 11/25/ Advertised for Bid 12/21/ Bids Received 01/15/ Contract Execution 02/01/ Notice to Proceed 07/31/ Construction Complete (18 months)

Questions? Justin Gould, P.E. Fay, Spofford & Thorndike