1 Mantoloking & Super Storm Sandy. 2 AGENDA: Overview Current Status Short-Term Plan Long-Term Plan Resources.

Slides:



Advertisements
Similar presentations
RHID Basics (K.S.A et seq.)
Advertisements

Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Public Informational Meeting North Street Wood Avenue to St Joseph Avenue Plan no Project Nos , , & City of Marshfield,
91 st Annual Meeting & Exposition April 1 – 4, 2012 Anaheim, California Are You Prepared for a Disaster? Nancy Brooks, Iowa State University Cory Harms,
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
 11 years of service to the Borough of Mantoloking  Job titles included:  Chief financial Officer  Tax collector  Tax Search Officer  Michelle thank.
Bryan Station Middle – Renovation Architect: Clotfelter-Samokar Architects General Contractor: Preston Construction Group Substantial Completion Date:August,
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
Using GIS for Utility Mapping and Asset Management Sanitary Sewer, Storm Sewer, and Water Distribution City of Mason City Jessy Willadsen - Mason City.
Storm Water Mitigation Program March 17, Purpose of the Program Connections to the public sewer system within private residences or on private property.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
Public Works Jack Petkus, Director Informational Overview.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
Norwalk, Connecticut: A Public-Private Partnership Case Study Mayor Alex Knopp U.S. Conference of Mayors Urban Water Council October 2004.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
SUTTER BUTTE FLOOD CONTROL AGENCY Supplemental Presentation on Variances and Encroachments Feather River West Levee Project Project Area C May 24, 2013.
* General Fund * Ad Valorem proceeds assumes 3% Taxable Value growth at the current millage rate of * Minor fluctuations in Utility Service.
Utility Extension Project
Infrastructure Improvements Dependable infrastructure for CSUCI campus… Dave Chakraborty Director, Planning, Design & Construction.
2015 Financial Plan Public Hearing Presented: Tuesday, April 21 st, 2014 Dugald Community Centre.
1 Innovative Use of Administrative Order Authority Management, Operation and Maintenance (MOM) Program.
ReEntry Now They Are Coming Back!. Purpose: To promote and facilitate the timely reentry of essential response and recovery personnel, governmental officials,
Infrastructure – Condition Assessment Overview & Purpose Infrastructure Condition Assessment – General Findings/Conditions –Streets/Sidewalks/Parking Lots.
Downtown PRESENTATION Tuesday, May 3, 2011 R/C Theaters Movies 14.
Snow Removal Information Robert “Brutus” Cantoreggi, Director Carlos Rebelo, Highway and Ground Superintendent.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
Madison Avenue Reconstruction Department of Planning and Development.
Unit: P81 Unit P8 Public Works/Utilities Services Orientation.
Water Distribution Systems Pressures Locating Reservoirs Location in Ground.
15 Water Supply. 15 Objectives (1 of 2) Discuss rural water supplies. Describe how portable tanks are used to supply water for firefighting. Describe.
Hurricane Ike Recovery Projects CDBG Funding Galveston City Council Workshop  Sept. 17, 2015.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
City of Pasadena El Niño Preparedness Eric Klinkner – PWP Interim General Manager Steve Wright – City Engineer Lisa Derderian – Emergency Mngt Coordinator.
Public Works/Municipal Utilities Department FY City Council Budget Workshop June 15, 2015 Presented By: Glen W. C. Kau, PE Director of Public Works/Municipal.
Houston Area: Baltimore (81) Baltimore (81) Boston (48) Boston (48) Pittsburgh (56) Pittsburgh (56) San Francisco (47) San Francisco (47) Denver (153)
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
City of Sausalito Sewer CIP Vivian Housen, P.E. V. W. Housen & Associates March 25, 2015.
2015 Annual Financial Report December 31, Total Revenue $13,068,887Total Expenditure $14,006,870 Revenue Budget $14,957,884Expenditure Budget $15,669,564.
FY 2017 BudgetHearing September 8, 2016 Mike Loftin, Assistant City Manager - Finance 1.
PUBLIC WORKS 2017 PRELIMINARY BUDGET
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
2nd Street Drainage and Paving Improvements
Agenda Updates to Driveway and Sidewalk specifications and permits
Environmental Services
Gladewood Bridge Summary: Built in 1920 Crosses the Yellow Creek
What led to Temple Hill Road and Nirvana Gardens?
Interstate 15 North Phase 4 Cost Estimates 09/03/2015
HURRICANE MATTHEW AFTER ACTION REPORT.
Returning-Rebuilding-Preparing-Creating
SW Gage Blvd - Street Repair Project
Public Hearing Sanitary Sewer Fees
City of Greater Sudbury Lining Program Overview. Brittany Hallam, P
Walker Street Reconstruction Project 25% Design Public Hearing
Things You Need to Know about Underground Utility Contractors Dalton GA.
Larimer County: engineering
Presentation transcript:

1 Mantoloking & Super Storm Sandy

2 AGENDA: Overview Current Status Short-Term Plan Long-Term Plan Resources

Mantoloking & Super Storm Sandy – Current Status INFRASTRUCTURE: STATE DOT Project: Finished Working traffic light on Herbert Guardrails in place Sidewalks, curbs, grass (!?!)

Mantoloking & Super Storm Sandy – Current Status INFRASTRUCTURE: DEBRIS REMOVAL: 26,000 tons to date Continuous Private Property Debris Removal (including demolition) under discussion with FEMA. SAND REMOVAL/RE-USE: Army Corps dredging Lyman Temporary sifting station will be in place immediately after dredge work is complete.

Mantoloking & Super Storm Sandy – Short-Term Plan Access: New Access System in place Priority: First Responders / Residents Contractors next

Mantoloking & Super Storm Sandy – Short-Term Plan Administration: Tax reassessment- Complete assessment by Property by March, 2013 Prepare for Reconstruction: Planning Board considering new zoning req’s based on revised elevation guidelines from FEMA (issued last week) Streamline permit process Planning Board working with Borough: Resolution being drafted allowing: PODs, RVs, Boats, etc.

7 Mantoloking & Super Storm Sandy UTILITIES (Current Status): Sanitary Sewer Over 15,000 lf (3 miles) of sewer main cleaned and inspected Force main pressurized and discharging clean water to OCUA Water 90% of main restoration complete Pressure testing and water quality testing for 8” main on Rt. 35 Gas 70% of main restoration complete Portion of Barnegat Lane and Lagoon/Channel not pressurized Electric 85% of distribution grid energized Areas around Barnegat Lane and Herbert St breach not energized

Mantoloking & Super Storm Sandy UTILITIES (Short Term Planning): Sanitary Sewer Complete the remainder of sewer main CCTV inspection/cleaning Install temporary pump system at Herbert Street Water Repair damaged fire hydrants Install new services for properties off of new 8” main in Rt 35 Gas Pressurize and perform full assessment of Lagoon/Channel area Replace 2” main on Barnegat Lane Electric Complete the replacement of overhead distribution Ensure safety policies remain in place throughout restoration work

9

10

11

12

13

Mantoloking & Super Storm Sandy – Happy Holidays