Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.

Slides:



Advertisements
Similar presentations
Proposed Water & Sewer Rates FY2014 Department of Utilities & General Services April 1,
Advertisements

Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
Rural Development Underwriting Program Consulting Engineers Training June, 2012.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
Copyright Rehmann Robson Pennfield Charter Township Water and Sewer Utilities Rate Study.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
DECEMBER 15, :00 PM TWSD RATE ADJUSTMENT HEARING.
Municipal & Financial Services Group Village of Downers Grove Water Rate Study Rate Study Overview and Recommendations September 21, 2010 Presented by:
1 Amador Water Agency System-Wide Cost of Service and Wastewater Rate Study October 9, 2014 The Reed Group, Inc.
Maintaining Sustainable Water and Waste Disposal Services Copyright 2011 Community Resource Group, Inc. No part of this presentation may be copied or.
1 Combined Utility System Cost of Service Rate Study Presentation April 6, 2010.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
Fiscal Year 2009 Rate Adjustments Presentation to FPUA Board 1 March 3, 2009.
Final Budget FY O&M and rate setting Capital Budget Debt Service Budget 1.
2014 Budget Department Presentations Infrastructure Funding Options.
Your Water System Sources of Water reservoir underground aquifer Energy Sources pumps gravity Distribution Network of Pipes.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
Page: Water and Wastewater Rate Study and Financial Forecast Council Presentation City of Cottonwood July 2009.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
1 Why Budgeting Matters NC Local Government Budget Conference Wilmington, NC July 2007.
Elk Grove Water District Water Rate Update and Connection Fees Habib Isaac – Principal April 10, 2013.
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
Long Beach Water Department Review of FY 12 Budget.
Financial Impact of Drought March 5, 2008 Updated 3/17/08.
2015 Financial Plan. PROCESS Staff began work on this budget in September 4 meetings including today are scheduled – Jan 26, 28 and Feb 2 and further.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASIBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
1 User Rate Adjustments June 30, 2008 Financial Analysis - Karen Spence.
Village of Almont WATER, SEWER, AND SSO RATES 2012 – 2013 FISCAL YEAR.
1 Public Hearing User Rate Adjustments April 8, 2008.
2016 Water and Wastewater Rates Committee of the Whole November 16, 2015 Presenter: Mike Mayes – Director, Financial Services/Treasurer.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
Commission Meeting November 18, 2015 WSSC Customer Use and Pricing.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
Presentation for a W ATER R ATE S TUDY Chris Fisher Jeff McGarvey Tony Thrasher CITY OF SOLEDAD, CALIFORNIA Presented by.
FEBRUARY 22, 2016 FY 2017 County Administrator’s Recommended Budget.
Town of Yountville B ARTLE W ELLS A SSOCIATES Independent Public Finance Advisors Water and Wastewater Rates Prop. 218 Hearing February 15, 2011.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
RATE ANALYSIS FY FY 2019 March 6, 2014 CARSON VALLEY WATER UTILITY FUND 326 – DEPARTMENT 864.
Resolution 2014R-099 December 18,  Board Direction ◦ Establish a monthly cost-of-service rate of $ for FY 2015 and utilize a General Fund.
Kevin Burnett Presented by CITY OF TULARE, CALIFORNIA.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
FY 2016 Water & Sewer Rates Presented by: The Department of Public Works Works.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
What are they and how are they calculated? May 2015.
FY 2016 Budget Discussion Prior to Proposed Budget Submittal July 23 rd,2015.
Global Service Provider Buildings Energy Environment Transportation Water Water and Wastewater Rate Study Village of Villa Park, Illinois Presented to.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Financial and Capital Highlights Fiscal Year Second Quarter Charles Turner, Director of Finance
May 31, 2016 WATER & SEWER RATE STUDY PRESENTATION 5/9/2016 City of Greenfield, California.
Town of Yountville B ARTLE W ELLS A SSOCIATES Independent Public Finance Advisors Water and Wastewater Financing Plan Rate Study 2010 December 14, 2010.
Current Water Rates $26.66 per month readiness to serve fee (billed on a quarterly basis at $80.00) 5.14 per 1,000 gallons of water used The City of Flushing.
Portugal Cove - St. Philip’s
City of Petersburg Water and Wastewater Rates
Water and Wastewater Rates
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Final Rate Study Findings
City of Sisters, OR 2017 Water & Sewer Rate Study
FY Proposed Budget and Rates
City of Petersburg Water and Sewer Rates April 26, 2011
Water and Sewer Rate Study
Water Cost-of-Service
Water & Sewer Rate Study Presented by: Chris Gonzalez, Project Manager
City of Lebanon, Missouri Electric Department
City of Rehoboth Beach Water and Wastewater Financial and Rates Review
SEWER DEPARTMENT BUDGET WORKSHOP
2018 Water/Wastewater Rate Study and Financial Forecast
Presentation transcript:

Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority Presented by: Edward Donahue Eric Callocchia

Contents 2  Objectives  Revenue Requirements  Rate Projections  Recommendations

Objectives - Why Review Water and Sewer Rates? 3 To ensure that rates and fees are stable through sound financial management at a level that fully recovers the costs of providing services and appropriately allocates costs to customers. To Meet Objective: Review current water and sewer rate structures and revenue adequacy Design and analyze an alternative three tiered water structure as well as a cap on non-winter sewer use. Tier 1: Small Users Tier 2: Average Users Tier 3: Excessive Users Separate costs between user rates and capital fees (availability fees) to ensure the proper cost allocation

Revenue Requirements 4

O&M Expenses – Future Forecasts Escalation factors for projecting future expenses based on the following: Actual FY customer information Most recent full fiscal year of information Budgeted FY O&M Expenses Actual existing debt schedule County’s 5 year CIP Personnel expenses projected based on a combination of indices. Current assumption is 3% increase per year throughout the projection period 5

Operating and Maintenance Expenses 6 Current FY Operating and Maintenance Budget Total Budget = $2.96 million

in millionsFY 12FY 13FY 14FY 15FY 16FY 17 Water $0.74$0.73$0.76$0.80$0.83$0.85 Sewer $1.51$1.49$1.54$1.59$1.63$1.68 Water Maint. $0.40$0.39$0.40$0.42$0.43$0.44 Sewer Maint. $0.31$0.40$0.41$0.42$0.43$0.45 % Change 1.9%3.4%3.6%3.0% O&M Expenses Forecast 7

Existing Debt Service Payments (in millions) 8

Capital Improvement Projects – Water Fund 9 ProjectsFY 12FY 13FY 14FY 15 Generator Upgrade Project$32,500$225,000 St. Pauls Storage and SCADA Upgrades$30,000$150,000 Peppermill Water Storage and Interconnect Upgrades$50,000$175,000$125,000 Presidential Lakes Arnolds Corner Interconnect & Controls Upgrade $125,000 Fairview Beach/Potomac Landing Well Replacement Project $640,000 Indiantown Well Improvement Project$100,000$650,000 Route 206 Water Improvement Project$200,000$2,000,000 Fairview Beach Water Tank$940,000 Total Annual CIP Spending$1,735,000$232,500$700,000$2,775,000 Projects are funded by a combination of cash, borrowing and availability fees

Capital Improvement Projects – Sewer Fund 10 ProjectsFY 12FY 13FY 14FY 15 Generator Upgrade Project$32,500$225,000 Bayberry Gravity Sewer Replacement$80,000$40,000 Fairview Beach WWTP Effluent Filter Project$800,000 Purkins Corner to Hopyard Force Main & Pump Station Project $175,000$787,500 Oakland Park to Hopyard Force Main & Pump Station Project $200,000$1,650,000 Total Annual CIP Spending$80,000$1,247,500$2,662,500$787,500 Projects are funded by a combination of cash, borrowing and availability fees

Operating & Maintenance Reserve 11 Serves as working capital. Industry Practice is to maintain 90 days of annual operating expenses for fund (25% of annual O&M) - typically required by Virginia SCC for investor-owned utilities. Current Cash and Cash equivalents exceeds the target balance for the entire planning period in each fund, so no further contribution is currently recommended for either the water or sewer operating reserve.

Repair, Replacement & Rehabilitation Reserve (“3R”) 12 ► What Should We Spend? Book Value Estimated useful life and approximate age ► What Are We Spending? Repair and replacement projects from the capital budget ► What is the Required Contribution to Make Up the Difference? Difference between annual spending and annual required reinvestment Revenue raised through current user fees, not future borrowing

Repair, Replacement & Rehabilitation Reserve (“3R”) - Preliminary Results 13 in millionsFY 12FY 13FY 14FY 15FY 16FY 17 Sewer $0.00 $0.10 in millionsFY 12FY 13FY 14FY 15FY 16FY 17 Water $0.00 $0.03$0.07$0.10

Revenue Requirements – Water Fund (millions)FY 12FY 13FY 14FY 15FY 16 Operating Costs Total Operating Expenses $1.14$1.12$1.16$1.22$1.25 Operating Reserve Contribution $ - Total Operating Expenses $1.14$1.12$1.16$1.22$1.25 Capital Costs Existing Debt Service Payments $0.11$0.12 $0.15$0.17 Cash Funded Capital Projects $0.03 $0.10$0.13$ - Projected Debt Service Expense $ -$0.11 3R Reserve $ - $0.03$0.07$0.10 Total Capital Expenses $0.14$0.26$0.37$0.45$0.38 Total Revenue Requirement $1.28$1.38$1.53$1.67$1.63 Less Miscellaneous Other Revenues $0.09$0.05 $0.06 Net Revenue Requirement from User Rates $1.19$1.33$1.47$1.61$ Numbers may not add due to rounding.

Revenue Requirements – Sewer Fund (millions)FY 12FY 13FY 14FY 15FY 16 Operating Costs Total Operating Expenses $1.82$1.89$1.95$2.01$2.07 Operating Reserve Contribution $ - Total Operating Expenses $1.82$1.89$1.95$2.01$2.07 Capital Costs Existing Debt Service Payments $0.18$0.19 $0.26$0.27 Cash Funded Capital Projects $ -$0.03$ - Projected Debt Service Expense $ -$0.07 3R Reserve $ - $0.10 Total Capital Expenses $0.18$0.29$0.36$0.43$0.44 Total Revenue Requirement $2.00$2.18$2.31$2.43$2.51 Less Miscellaneous Other Revenues $0.08$0.06 $0.07 Net Revenue Requirement from User Rates $1.91$2.11$2.25$2.37$ Numbers may not add due to rounding.

Financial Conditions with Current Rates Water Fund (millions)FY 12FY 13FY 14FY 15FY 16 Net Revenue Requirement $1.19$1.33$1.47$1.61$1.57 Revenues under Current Rates/Customer Base $1.36$1.43 Surplus / (Shortfall) $0.17$0.10($0.05)($0.18)($0.15) Annual Breakeven Revenue Increase N/A 3%13%10% 16 Sewer Fund (millions)FY 12FY 13FY 14FY 15FY 16 Net Revenue Requirement $1.91$2.11$2.25$2.37$2.45 Revenues under Current Rates/Customer Base $1.63$1.79 Surplus / (Shortfall) ($0.29)($0.33)($0.46)($0.58)($0.66) Annual Breakeven Revenue Increase 18% 26%33%37% Numbers may not add due to rounding. FY12 and FY13 numbers include the budgeted rate increases: 5% water, 10% sewer

Revenue Requirement Conclusions  Current Water Fund User charges recover costs associated with current expenditures, but will need adjustment in the coming years in order to maintain a self-funding water system.  Average residential water use (year round) ~ 5,000 gallons per month  About 90% of residential water bills are for less than 10,000 gallons per month  Current Sewer Fund User charges do not recover costs associated with current expenditures. Significant revenue adjustments will be necessary in the coming years in order to maintain a self-funding sewer system.  Average residential user’s summer water use is about 30% higher than winter usage. 17

Financial Plan and Rate Recommendation 18 FY 12FY 13FY 14FY 15FY16 Current Structure Fixed Bi-Monthly Charge $16.54$17.03$17.54$18.07$18.61 Usage Rate per 1,000 gal. $3.86$3.98$4.10$4.22$4.35 Alternative Rate Structure Fixed Bi-Monthly Charge $16.87$17.26$17.66$18.06 Residential Usage Rates per 1,000 gal. Tier 1: 0 to 6k gallons (35% of bills) $2.99$3.09$3.19$3.30 Tier 2: 6k to 20k gallons (59% of bills) $4.48$4.63$4.79$4.94 Tier 3: Over 20k gallons (6% of bills) $7.47$7.72$7.98$8.24 Non-Residential Usage Rate $4.04$4.17$4.31$4.45 Net Revenue Requirements $1.19$1.33$1.47$1.61$1.65 Revenue under Financial Plan $1.40$1.46$1.52$1.59$1.66 Surplus / (Shortfall) $0.20$0.13$0.05($0.02)$0.01 Numbers may not add due to rounding. Water Revenue Increases 3%

Financial Plan and Rate Recommendation 19 FY 12FY 13FY 14FY 15FY16 Current Structure – Based on 100% of water Consumption Fixed Bi-Monthly Charge $25.09$28.85$33.18$38.16$40.06 Usage Rate per 1,000 gal. $8.61$9.90$11.39$13.10$13.75 Alternative Rate Structure – Capped at Winter Consumption Fixed Bi-Monthly Charge $42.64$48.65$55.51$57.83 Usage Rate per 1,000 gal. $12.02$13.85$15.96$16.80 Net Revenue Requirements $1.91$2.11$2.25$2.37$2.45 Revenue under Financial Plan $1.59$1.85$2.16$2.51$2.67 Surplus / (Shortfall) ($0.32)($0.26)($0.09)$0.14$0.22 Numbers may not add due to rounding. Sewer Revenue Increases 15% 5%

Sample Bills 20 Customer ClassMeter Size Residential5/8" Winter UseNon-Winter Use 10,00012,000 Customer ClassMeter Size Residential5/8" Winter UseNon-Winter Use 20,00026,000 Customer ClassMeter Size Commercial1" Usage 40,000 Average User High User, Peak User Average Commercial

Summary and Recommendations 21  Recommended Water Revenue Increase and Rates  Recommended Sewer Revenue Increase and Rates FY 13FY 14FY 15FY16 Water Fund Revenue Increase 3% Fixed Bi-Monthly Charge $17.03$17.54$18.07$18.61 Residential Usage Rates per 1,000 gal. $3.98$4.10$4.22$4.35 Tier 1: 0 to 6k gallons (35% of bills) Tier 2: 6k to 20k gallons (59% of bills) Tier 3: Over 20k gallons (6% of bills) $16.87$17.26$17.66$18.06 Non-Residential Usage Rate $2.99$3.09$3.19$3.30 FY 13FY 14FY 15FY16 Sewer Fund Revenue Increase 15% 5% Fixed Bi-Monthly Charge $42.64$48.65$55.51$57.83 Usage Rate per 1,000 gal. $12.02$13.85$15.96$16.80

Benchmarking 22 Monthly Water and Sewer Cost, Residential User, 5/8” Meter, 6,000 Gallons Average = $73

Sample Bills 23 Customer Class Meter Size Winter Use Bi-Monthly usage Current Rates 2013 Breakeven Rates % Change 2013 Alternative A % Change Water Residential5/8"1012$59.91$ %$61.723% Residential5/8"2026$111.43$ %$ % Commercial1"40 $186.58$ %$ % Sewer Residential5/8"1012$114.68$ %$ % Residential5/8"2026$222.34$ %$ % Commercial1"40 $363.60$ %$ % Combined Residential5/8"1012$174.59$ %$ % Residential5/8"2026$333.77$ %$ % Commercial1"40 $550.18$ %$ %