PUMP STATION ELECTRICAL DESIGN

Slides:



Advertisements
Similar presentations
Control Circuit Protection Supplementary Protectors vs
Advertisements

Introducing Electricity and Electrical Safety
RMM Systems, LLC By Sam Rietta RMM Systems, LLC is a manufacturer's representative firm focused on providing value added sales solutions by providing.
10 The Service Entrance. 10 The Service Entrance.
2014 NEC Code Changes Ted “Smitty” Smith E Light Electric.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
Emergency Lighting Code Review Presented by Iota Engineering LLC.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
Mark W. Earley, P.E. Chief Electrical Engineer.  Also known as the NEC ® or ANSI/NFPA 70  There are two electrical codes that govern electrical installation.
Switching Device Product Line General Duty and Heavy Duty Safety Switches.
EET Survey of Electronics
Electrical Power Systems
© 2011 Ericson Manufacturing, Willoughby, Ohio
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
INTRODUCTION TO T&T ELECTRICAL WIRING CODE TTS 171: PART 1: 2002
Hazard - Inadequate Wiring
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
SECTION 4 ELECTRIC MOTORS UNIT 19 MOTOR CONTROLS.
Section 4: Electric Motors
The Home Inspection Book: A Guide for Professionals By Marcia Darvin Spada Copyright, Thomson/South-Western, 2003, Revised, 2006.
Chapter 3 Manual Starters.
By Carlin Bright. Electricity The flow of electrons in a conductor.
Troubleshooting Electric Control Devices
Electrical Principles and Wiring Materials
ELECTRICAL SAFETY OSHA 29 CFR 1910 SUBPART S
Copyright 2005 Ted "Smitty" Smith Two Minute Drill Number Three Improving your skill in code Look Up Increasing Speed Drill.
Electrical Review Electricity Resistance Insulator
7.1.3 Student Book © 2005 Propane Education & Research CouncilPage Applying a Systems Approach to Gas Appliance Troubleshooting Troubleshooting.
Two Minute Drill #10 Copyright 2005 Ted "Smitty" Smith.
Calculation Speed Drill # NEC
Copyright 2008 Ted "Smitty" Smith.  Left click on the presentation ICON located at the bottom of the slide directory to the left of the this slide. 
Assumption University Thailand EE4503 Electrical Systems Design Main Circuit 1.
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
3-Phase Submersible Motor Control
Introduction to switchgears
Ag. Mechanics for Beginning Teachers
By: Mr. Brock.  Electricity- Source of energy that can be easily converted into light, heat or power  Ampere (Amp)- Unit of measure of the rate of flow.
E4 HVACR Electrical Installation
Safety Around Irrigation Systems
 E4 HVACR Electrical Installation #3 Circuit breakers, disconnects, and fuses.
Utilities & Engineering Department16 Blossom St., Boston Introduction to the Hospital Emergency Power Supply System (EPSS) Jason D'Antona,
HOUSE WIRING Final Review. Electricity Electricity = flow of electrons Conductor= electricity passes thru easily - Metal, water, person Insulator = restricts.
Switches and Over Current Protective Devices Class Instructor ALPHER E. DE VERA, uap.
HOUSE WIRING NOTES. Electricity  Proton – positive charge  Electron – Negative charge  Electricity = flow of electrons Conductor= electricity passes.
ELECTRICAL WIRING WIRING BASICS Written by Bobby Joslin
REDA Production Systems
ELECTRICAL INSTRUMENTS ( service and utilization )
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
ELECTRICAL SAFETY GA Ag Ed Curriculum Office To accompany the Georgia Agriculture Curriculum Lesson AG-AMI VGP.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Electrical Safety OSHE 382, Spring 2016
Special-Purpose Outlets— Electric Heating, Air Conditioning
"Don't Get Amped Up! Electrical Safety to Keep Your Team Grounded!"
Agricultural Systems Technology II
Special-Purpose Outlets—Water Pump, Water Heater
Practice Code Look Up Two Minute Drill #7
Catching up with Code: Updates from
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Overcurrent Protection— Fuses and Circuit Breakers
EET 323 – Electrical System Design Lecture 9: Grounding
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Safety Meeting Topics Standby Generator Safety
Smitty’s Two Minute Drill Grounding and Bonding
Smitty’s Two Minute Drill Services, Feeders, and Branch Circuits 1
Presentation transcript:

PUMP STATION ELECTRICAL DESIGN 40 Years Lessons Learned Maynard Wayne Robertson, PE, CEM mwrobertson@vaughnmelton.com mwrdcr@comcast.net TAUD Technology Conference Gatlinburg, TN March 13, 2013

Pump Station Design Requirements Tennessee Dept. Environment & Conservation Environmental Protection Agency NFPA- 70- National Electrical Code Tennessee Fire Marshall- Electrical Inspections OSHA/TOSHA

TDEC Requirements General Design Requirements for Sewerage Works Key Chapters for Pump Stations; 1, 2, 14 Chapter 2. Section 2.5 Pump Stations Alarm System and totalizers on All stations 2.6.3 All wet well wiring to be Class l, Division l, per NEC 2.7.3 PS Capacity Greater Than - 1.0 MGD Requires Flow Meters Requires Back Up Power System

TDEC Requirements Chapter 2.6.1.6 Requires to comply with All OSHA Rules. Work place safety. Chapter 2.7- Operability/ Reliability Do you need generator/backup power? Essentially EPA requirements. Reliability Class 1, Class 2, Class 3.

TDEC 2.5 Septicity Controls. I guess something that smells BAD. Do not make it smell worse. Setting controls for minimum time in wet well. Auto Pump Out (Timed pump start after low level contact made, low cost to reduce odor ) Electric Power Systems Chapter 1.3.11.5 www.tn.gov/envionment/wpc/publications Design Criteria for Sewerage Works

National Electrical Code Latest Version NEC-2011 Next Version NEC-2014 Code revised on Three Year Cycle Version adopted in Tennessee NEC-2008

NFPA CHAPTER 70 National Electric Code / 70E work place safety NEC 2008 Used Statewide *Exceptions In Some Cities NEC-2011 70E Work Place General Safety Requirements Installation Of Equipment Protection Of Electrical Equipment

NEC-2008 Organization Chapters: One thru Nine Articles Tables Appendix Chapters: One Thru Four Basic Wiring Requirements. Apply to all Wiring Installations. Chapters: Five thru Nine Special Conditions

NEC Chapters Chapter 1 – General Chapter 2 – Wiring and Protection Chapter 3- Wiring Methods and Materials Chapter 4 – Equipment for General Use Chapter 5 – Special Occupancies Chapter 6 – Special Equipment Chapter 7 – Special Conditions Chapter 8 – Communications Systems(Stands alone) Chapter 9 – Tables Annex A thru H ; Informational Only

Key NEC Articles for Sewer Pump Stations Articles: 200, 215, 220, 240, 250, 310, 312, Table 310.16, 400, 430, 445, 500 & 700. Note: Entire Code Applies Always!!

Tennessee State Fire Marshall Requires Electrical Inspection of all New and Modified Electrical Installations. Require Use of Listed Equipment- UL, etc. Current Enforcement NEC -2008 Authority Having Jurisdiction

EPA EPA-430-99-74-001 Operability and Reliability Class 1 Standby Power nearly always required Class 2 Standby Power maybe Required Class 3 Normally not Required

Service Terms Service Service Entrance Metering Service Disconnect Service Type Overhead Underground Single or Three Phase Available fault Current

NEC Voltage Low Voltage = Less Than 600 Volts Single Phase Motors 5 HP or Less( 7.5 & 10.0 are manufactured) Three Phase 120/240 Volt Delta Connected 120/208 Volt Wye Connected 277/480 Volt Wye connected

Electrical Service Entrance Capacity for both pumps to operate Service disconnect rated for service entrance and capacity to allow second motor to start without tripping Service Equipment( Main Breaker and panel boards, etc.) rated for available fault current Fault Currents can be high at PS as result of large transformer and short wire runs Standard Interrupting capacity: 10,000, 22,000, 65,000amps Grounding and Bonding Adequate work space in front of electrical equipment For outdoor locations shield panels from sun and heat

Wiring Methods NEC Article 250 Grounding and Bonding Table 250.122 Size of Equipment Ground Conductor Grounded Conductor Ground Wire Lightning protection Table 310.16 /Table 310.15B(2)a, more than 3 conductors in raceway/conduit Conductors Rated at 75C Conductors Rated for Wet Location

Control Panels Correct NEMA Enclosure ( 3R, 4X, etc. ) Ventilation/Cooling Drains Labeled (UL, CSA) Alarms Control Transformer (Reduce line Noise) Instrumentation (Runtime, Volts, Amps, Calibration)

Motor Starters Manual Across the Line starters( NEMA SIZE 0, 1, 2, etc.) Part winding Auto transformer Soft Start VFD (6 pulse more noise and 12 pulse less noise) VFD noise may interfere with controls/SCADA

PHASE CONVERSION Single Phase Power to 3 Phase Power Phase Conversion Using VFD Size VFD Based On Single Phase Load Plus 15% 20Hp, 3P, 230V, FLA=54 Amp Based on single phase = 100 Amp Use 120 Amp VFD

Common WWPS Problems Corrosion, Corrosion, Corrosion!!!! Electrical Junction Boxes in Wet Wells Excessive Pumps starts/ Short run time Unlisted Electrical Equipment (Inspector Rejects) FAILURE TO DERATE CONDUCTORS in Conduit. (more than three) Lack of Phase Loss Protection Phase to Phase Voltage/excessive voltage difference. Poor Electrical Grounding No Isolation of sewer gas from control Panels thru use of junction boxes with double conduit seals. Complete failure less than 1 year. Circuit Breakers too small, Result excessive heat in Panel.

Common WWPS Problems NO Conduit Seals, Sewer Gas direct line to control Panel. Pump Rotation Wrong NEMA Class Enclosures Low Equipment Electrical withstand Ratings. VFD noise on Control circuits No GFIC Receptacles Generators/ transfer switches improperly wired/ Phase Reversed.

Checklist/Records Always use startup Checklist Voltage, Line to Line, Line to Ground, Phase to Phase Amperes Discharge Head Pumping Rate Photos Nameplate Data Terminals Tight

WWPS Life Cycle Cost Initial Cost Installation Commissioning Cost Maintenance and Repairs Cost ENERGY COST 90 PERCENT OF TOTAL High Efficiency Motors High Efficiency Pumps

Generators Correctly Sized to start second pump with all loads energized Portable /Permanent Transfer switches/ Manual or automatic Fuels/ Diesel, Natural Gas, Propane, Gasoline. Long Term maintenance cost

PUMP STATION ELECTRICAL DESIGN 40 Years Lessons Learned Maynard Wayne Robertson, PE, CEM mwrobertson@vaughnmelton.com mwrdcr@comcast.net TAUD Technology Conference Gatlinburg, TN March 13, 2013