Herndon Metro Station: Cost Estimates for Town Requests August 6, 2014.

Slides:



Advertisements
Similar presentations
Belt Line Project Cost Update May 27, Belt Line – Project Overview Undergrounding of aerial utilities – electrical and telecom Two Phases – Marsh.
Advertisements

Utility Course Case Studies CEA and Road Builders Workshop Joe Mah, M.Eng.P.Eng.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Route 50 Widening Design/Build Project. 2  Virginia Department of Transportation  Shirley Contracting Company  Dewberry  Fairfax and Loudoun Counties.
6 th Street Water Main And Street Reconstruction 2013.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
Chapter 8 Plot Plans.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Superior Customer Service A Commitment to Excellence Personal and Organizational Accountability 1 OMAO Marine Operations Center – Pacific Transfer of Function.
Daniel C. Shapiro & Jessica M. Schramm August 30, 2011 APA Presentation.
1 Status Report on H. Ligarde Elementary School Parking Lot Facility Construction Department August 16, 2002.
Vacant Surplus City Property Administration & Finance Committee August 6, 2014.
UTILITY REIMBURSEMENTS Kenny Franklin Director of Utilities and Railroad.
Land Use Study for the Community of Winchester May 21, 2012.
JOINT REFERRAL COMMITTEE (JRC) FAST TRACK PROCESS EQUAL TO OR GREATER THAN EASEMENT EXCHANGE Request for the Abandonment and Sale of an Easement or Easements.
Trail Funding Sources & General Information
SAFETEA-LU Changes  Exemption of the Interstate System from Section 4(f) [Section 6007]  de minimis impacts to historic sites [Section 6009(a)]  de.
Client Logo Panther Creek Pool October 4, Annual Meeting President’s Report.
Broadview Second Access. Parlette Annexation What has changed? Parlette has asked for reconsideration –Recitals in agreement are not operative provisions.
24 CFR Funds may be used for activities which include, but are not limited to:
Shepherd University WV Route 480 Pedestrian Underpass August 3, 2011.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
Applicable Documents and KRS Statutes  FHWA Utility Relocation and Accommodation Guidelines  KRS  23CFR  23CFR  23CFR
FINAL BUDGET CITY COUNCIL PUBLIC HEARING SEPTEMBER 27, 2011.
Legal and Illegal Examples: Unified Development Code (C) Temporary Signs.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
1 Whatcom County Public Works Whatcom County Public Works GOOSEBERRY POINT LEASE STATUS & UPDATE OCTOBER 13, 2009.
Maintenance Agreement with Town Center At Palm Coast Community Development District City Council Workshop February 10, 2015.
Outline  Board Direction  Tasks Completed  Recommendation.
County of Fairfax, Virginia Silver Line Update Board Transportation Committee December 1, 2015 Mark Canale Fairfax County Department of Transportation.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
October 2011 Schlumberger Site Assessment 36 Old Quarry Road Ridgefield.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
City of Marshall Development Proposal to Ralco Nutrition, Inc. August 7, 2012.
Pedestrian Overpass Locations City of Kent 1. Objectives Find a location in Kent for a pedestrian overpass Allow better traffic movement by removing pedestrian.
Grand Landings Phase 1A Final Plat and Easements Application #2953.
Office of Real Estate 2045 Morse Road E2 Columbus Ohio /9/2016.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
Campus-to-Campus Public Workshop Evaluating the Routes April 15, 2010.
Approve the purchase of right of way and easements for Kimball Avenue Improvements from the properties at 1030 North Kimball Avenue, 2149 East Highland.
Resolution No , Authorize the city attorney to bring condemnation action for the purpose of obtaining street right of way and easements for construction.
1 Integrity Innovation Accountability Commitment to Excellence Teamwork Values Items 6D & 6E ZA & ZA OWNERS:Timothy & Lori Livingston and James.
Russell Home Property Donation October 27, Background Property Requested Action PRESENTATION OUTLINE.
CONGAMOND ROAD ROADWAY IMPROVEMENT INFORMATIONAL MEETING
Jemtegaard Trail Project was originally funded by a Safe Routes to School (SRTS) which is a federal grant administered by WSDOT Total funding for design,
Winchester Lift Station Odor Control Project
Request #2 Request #1 Segment built by LCPS.
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Project Funding Access Database
Right of Way – Eligible for State Aid Reimbursement
Non-Residential Customer Non- Residential - Capacity Evaluation Borough of Conshohocken Authority Customer Informational Meeting June 20, East.
MIDLAND FIRE DEPARTMENT OPERATIONAL COVERAGE
Dana Heiberg, Senior Planner February 5, 2018
MANASSAS PERMITS Rev. 9/09 Permit responsibilities include:
Proposed City of Wenatchee Comp Plan Update: Impact on Olds Station
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Silver Line Department of Transportation
URBAN TRAIL PROJECT UPDATES
Walker Street Reconstruction Project 25% Design Public Hearing
City of Spruce Grove Capital Region Partners Presentation 2019
2600 North mailboxes.
Presentation transcript:

Herndon Metro Station: Cost Estimates for Town Requests August 6, 2014

Herndon Station North Side PavilionAugust 6, Herndon Metro Station TOWN OF HERNDON RESTON

Town requested at the Metro Town-Side Pavilion: Herndon Station North Side PavilionAugust 6, Decorative black handrail/fence both sides of sidewalk (approx. 1000’) – VDOT special standard 1. Imprinted concrete along retaining wall (approx. 400’) – VDOT special standard 2. Metro Sign at Herndon Parkway 4. Canopy for 30 bike racks 5. More durable sidewalk standard

Herndon Station North Side PavilionAugust 6, For Today’s Consideration  Review MWAA Cost Estimates  Consider Town Options  Direct Staff

Herndon Station North Side PavilionAugust 6, Land to be acquired Permanent Easement to be acquired Temporary Easement Land to sold after construction Town-side entry pavilion Land Transactions for Town-Side Entry Pavilion

Town Easements to be Affected: trail, water and sewer Herndon Station North Side PavilionAugust 6, Approx. location existing trail and utility easement Town water and sewer lines & easements to be relocated

Herndon Station North Side PavilionAugust 6, Town Actions Associated with Town-Side Metro Facilities  Planning participation since 2010  Letter Agreement Town-Fairfax County-MWAA 2013  Authorization of Relocated water-sewer-trail easements  Consideration of Special Exception

Explanation of Cost Estimates August 6, 2014Herndon Station North Side Pavilion

August 6, 20149

Herndon Station North Side Pavilion10 Questions?