Transport.tamu.edu Parking Garage Feasibility Study TSAC December 5, 2012.

Slides:



Advertisements
Similar presentations
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Advertisements

March 2012 Radnor High School Parking & Circulation Improvement Opportunities.
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Legal Descriptions and Site Plan Requirements
Achieving Sustainable Design with Automated Parking
Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Analette Ochoa, P.E., QSD/P, ToR, WRECO May 22, 2013.
1 University of Houston Central Campus Parking Study Overview November 2003 WALKER PARKING CONSULTANTS.
Core Campus Parking Analysis Executive Facilities Committee: Discussion FEB
Welcome “Sewers – The Key to Hauppauge Revitalization: The Next Economic Boom ” 1 June 23, 2010.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Classroom Addition Facility Planning funds to study a possible addition Enrollment Projections Increase capacity for 2300 students Program includes 19.
Transport.tamu.edu Options for Access Improvements Near MSC Wednesday, December 7, 2011.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Transport.tamu.edu Proposed 2013 Football Parking Rates Transportation Services Advisory Committee March 6, 2013.
Accredited with “Distinction in Performance” St. Clair R-XIII School District.
Transport.tamu.edu Accessible Parking Study TSAC January 11, 2012.
Science Research Laboratories (formerly PSL and LSL) 23,111 GSF $24 million Total Project Cost (PUF and RFS) November 2010 Completion 1.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site Illustrative S O F T B A L L & P.
Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client.
Suisun Valley School K Classroom Addition Project.
Feasibility Study Schemes: · Scheme 1—Renovating and expanding the meetinghouse. This scheme moves the meetinghouse about 20 ft. west, converts it to.
Facilities Advisory Committee Preliminary Feasibility and Cost Study April 2012.
Transport.tamu.edu Northside Parking Garage Study TSAC April 3, 2013.
Property Appraiser and Tax Collector Office Space Search Update Real Estate Management March 25, 2014.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Adams-14 School District Facilities Master Plan Kearney Middle School Focused Site Evaluation SITE DRAINAGE OBSERVATIONS General – Site drainage was primarily.
September 2005Urban Planning Carleton University 1 Drainage Systems _____________________________.
University of Toronto Mississauga Campus: UTM Master Plan Update Campus and Facilities Planning | March University of Toronto Mississauga Campus.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
Site Plan Requirements © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture.
First United Methodist Church Katy, Texas Preliminary Master Plan Presentation September 29, 2009.
Parking & Transportation Services Parking and Transportation Services will be a respected industry leader responsible for creating a campus wide parking.
New Brighton Planning Commission Meeting March 21, 2006 Public Hearing: Special Use Permit (06-004) for a porch addition at th Avenue NW.
Emergency Exit 235’ 154’ Current Store 201 Ethan Allen ≈ 5752 square feet Columbia Avenue Sycamore Parking Lot ≈ 8688 square feet Wooded Slope Carroll.
Design of Parking Facilities Chapter 16 Dr. TALEB M. AL-ROUSAN.
City of Rehoboth Beach Summary of Master Plan Consultations, Recommendations and Progress to date By Stan Mills for July 7 Board of Commissioner's Meeting.
First United Methodist Church Katy, Texas Preliminary Master Plan Presentation OCTOBER 6, 2009.
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
Affordable housing project
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Ingress and Egress The means of entering and leaving the site Regulated by state and local governments Width Slope Drive radius Pavement composition Encroachment.
Palomar College HUMANITIES BUILDING “Creating places and spaces that enrich the lives of those who use them” “... Supporting innovation to enhance and.
University of Toronto Mississauga Campus Update to the UTM 2000 Master Plan University of Toronto Mississauga Campus: UTM Master Plan Update Campus and.
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS SFAC Civic Design Review – Informational Overview February 8, 2016.
Transportation System Comments Santolina Level ‘A’ Master Plan.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Concept Design Community Center Proposed Spaces New Construction63,000 SF – Gym Spaces13,500 SF – Fitness Center 9,000 SF – Walking Track 4,000 SF – Multipurpose.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
West Cambridge Data Centre Ian Tasker Information Services.
Parking Lot Design Civil Engineering and Architecture
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
Conventional Facilities/Siting Jonathan Hunt Project X Machine Advisory Committee March 18-19, 2013.
White Pigeon Community Schools
Hillside Development Permit 09-38
Town of Brighton, Department of Public Works
Addition of Fire Alarm system. None existing.
General Road Construction Information
PROJECT PLANNING MEETING
1326 S. MICHIGAN APARTMENTS + RETAIL
Residential Site Plan Considerations
Site Plan Requirements
Urban Renewal Authority
West Campus Parking Deck & Roadway Update
Competency: Create site plan drawings
Presentation transcript:

transport.tamu.edu Parking Garage Feasibility Study TSAC December 5, 2012

transport.tamu.edu Study Elements $32,500,000 garage project in the 2015 System Capital Plan Existing Masterplan How big should the garage be? Where should garage be placed?

transport.tamu.edu Study Elements Campus supply / demand Site assessment studies Opinions of cost Next steps

transport.tamu.edu Campus Masterplan

transport.tamu.edu Supply / Demand Study Park+ model Existing deficiencies Latent demand Five year planning horizon

transport.tamu.edu Supply / Demand Study

transport.tamu.edu Supply / Demand Study

transport.tamu.edu Site Assessments

transport.tamu.edu Site Assessments

transport.tamu.edu Lot 47 Garage

transport.tamu.edu Lot 47 Garage

transport.tamu.edu Lot 47 Garage 1,116 spaces, 336 sf/space, 5- levels above grade, 4-bay Parking Structure with ± 27,250 SF of proposed office space. 674 net spaces are provided Summary of Lot 47 Structure: Five parking levels at and above existing Lot 47 and a portion of Lot 51 Four 58-ft wide parking bays (double loaded) Two-way head parking in first floor bay utilizing 10’ wide spaces One-way angled controlled access parking Segregated first floor bay entry / exit from the North and South loop roads Single controlled access entry /exit from the North loop road Parking on the ramp with flat end bay parking “Pros” of Lot 47 Structure: Provides efficient long-span construction parking that meets the future deficiency needs Entry / exit location is off two-way loop roads and adjacent to the existing engineering area surface lots Allows for a flexible and usable office space component on the ground floor Provides for segregated and separately controlled first floor bay Provides visitor parking in excess of what is currently provided Apparent consistency with the University Master Plan Avoids major existing utilities “Cons” of Lot 47 Structure: Potential pedestrian/vehicular conflict at the entry / exit gates Parking on sloped ramps Integrating office space into existing parking area is more costly than standalone office space in another building type

transport.tamu.edu Lot 30d Garage

transport.tamu.edu Lot 30d Garage

transport.tamu.edu Lot 30d Garage 1,082 spaces, 331 sf/space, 4- levels above grade, 4-bay Parking Structure. 870 net spaces are provided Summary of Lot 30d Structure: Four parking levels at and above existing Lot 30d and a portion of Lot 30c Four 58-ft wide parking bays (double loaded) One-way angled controlled access parking Single controlled access entry /exit from the South loop road Parking on the ramp with flat end bay parking “Pros” of Lot 30d Structure: Provides efficient long-span construction parking that meets the future deficiency needs Entry / exit location is off two-way loop roads and adjacent to the existing Northside area surface lots Provides parking on the perimeter of campus Apparent consistency with the University Master Plan Avoids major existing utilities No pedestrian/vehicular conflict at the entry / exit gates “Cons” of Lot 30d Structure: Minor utilities (water, storm sewer, and sanitary sewer will need to be relocated) Existing trees will need to be removed The existing storm drainage area will need to be “structured” and “spanned” by the proposed garage Parking on sloped ramps

transport.tamu.edu Campus Masterplan

transport.tamu.edu Opinions of Cost $21,171,986 + $15,840,683 = $37,012,669

transport.tamu.edu Next Steps Begin project programming Begin conceptual and final design for projects