APEX Engineering Ian Braun Andrew Halley Jorge Hernandez Mohamad Haikal Bin Maamor PROPOSED HUALAPAI MUSEUM SITE DESIGN 1.

Slides:



Advertisements
Similar presentations
Introduction to Hydraulic Engineering – CEE3420
Advertisements

Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Module 2: Bioretention Area Siting and Design Andy Rowe, PE, LEED AP, QSD Cannon.
Project Background and Objectives
Marin Community College District CIP Briefing – Citizen’s Oversight Committee September 13, 2005.
Legal Descriptions and Site Plan Requirements
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
Village of Denzil PS 3150 Pilot Project summary. Pilot Project Introduction A pilot project was initiated with the Village of Denzil to provide further.
217/ Sustainable practices on campus can help achieve Storm Water Compliance University of Illinois at Urbana-Champaign C. Eliana.
Board of County Commissioners June 10, CPA-AA Duke Energy Florida for HCR Limestone Department of Planning and Development Geographic Resources.
Betsy Kerrison Property Acquisition Town of Kiawah Island Municipal Campus Site October 28, 2014 October 30, 2014.
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
Wastewater Storage Pond Design
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
PowerPoint Presentation
Basketball Court Design Team Design:Adel Alnasser Daij Alfahad Hamad Alqalaf 1.
Progress Report – Design of Native Wetland Nursery Facility Design of Native Wetland Nursery Facility For Metro’s Native Plant Center Prepared by: Portland.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
BASICS OF SURVEYING Ivy Tech Community College. Surveying Definition DEFINITION The art and science of making such measurements as are necessary to determine.
Blue Prints.
Chapter 8 Plot Plans.
Sanitary Engineering Lecture 16
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Civil Engineering About 8 Different Subsets 1. Structures
Engineering and Technical Plans Description, process and standards Dh 2005.
October 4, 2004 Detrich B. Allen City of Los Angeles Environmental Affairs Department 1 Siting New Development Detrich B. Allen General Manager Environmental.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Trail Funding Sources & General Information
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
Capital Improvement Plans: Providing a Blueprint for the Community Bill Goldy, Associate Principal/Senior Planner David Doxtad, Associate Principal/Civil.
Peach Springs Underpass/Overpass (Structural) Presentation By: Flag-Tech Engineering Yuliang Wang, Yiyang Chen, Jonathan Melendez.
11 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager September 16, 2013 Bloomingdale Civic Association Briefing for: Northeast.
March 10, 2015 Second Public Hearing 1.  Workshop proposed ULDC changes: 1/27/15  Request to Advertise: 1/27/15  First Public Hearing: 2/24/15  Second.
Phase I ESA Environmental Site Assessment. Purpose Is to provide a professional opinion on the potential for current presence of RECS at the subject property.
PROJECT SCOPING FOR LOCAL AGENCY FEDERAL AID PROJECTS.
Avalon Park Retail Market Analysis Fishkind and Associates, Inc Corporate Blvd. Orlando, FL December 12, 2008.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
 Overview of Project  Economic Development Tools  Municipal Management Districts  Tax Increment Reinvestment Zones  Session Review, Q&A.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Sinclair Wash Stream Restoration Feasibility Study
Town of Brighton, Department of Public Works
Scoping Meeting April 20th 6:00 pm
NAU International pavilion expansion
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
Development Charge Public Meeting October 23, 2017
Site plan The plat map A plat map is the first step in development of a site plan. It delineates property lines with bearings, dimensions, streets, and.
Changes to Pace Master Campus Plan 1. Pod A Tear down Randall House, build new Lower School building in its place. Add new parking in front. 2.
Site Plan Requirements
Competency: Create site plan drawings
Love Field Modernization Program
URBAN TRAIL PROJECT UPDATES
CENE Old Town Frame Company
Commission Agenda Item # 17
What is Site plan and Site Plan Rendering Service Linesgraph.
Presentation transcript:

APEX Engineering Ian Braun Andrew Halley Jorge Hernandez Mohamad Haikal Bin Maamor PROPOSED HUALAPAI MUSEUM SITE DESIGN 1

 Project Understanding- Slide 3  Scope of Services- Slide 8  Projected Timeline- Slide 14  Proposed Budget- Slide 15 PRESENTATION OVERVIEW 2

 Background Information  Stakeholders  Existing Site Conditions  Design Challenges PROJECT UNDERSTANDING 3

BACKGROUND INFORMATION The Hualapai Reservation (nearly a million acres) located in Northwest Arizona, on Historic Route 66, 54 miles northeast from Kingman, was established by Executive Order in 1883, and is home to the Hwal’bay, or People of the Tall Pines. Capital: Peach Springs AZ 4

 Tribal Administration and Hualapai Nation  Bureau of Indian Affairs  Other Donors both Government and Private  Dawn Hubbs, Hualapai Program Manager STAKEHOLDERS 5

EXISTING SITE CONDITIONS  Total site 7.5 acres subdivided into 7 lots  Historic buildings  Hualapai cultural center  Un-paved parking lot for the Hualapai Cultural Center 6

 Presence of a railroad easement adjacent to the proposed site  Storm water wash runs through property  Preserve local trees and plants present on the site  Use of building materials native to the area  Pre-existing building foundations and abandoned reinforced concrete sewer lines  All building entrances must face East DESIGN CHALLENGES 7

 Project Management  Land Surveying  Fill/Grading Plan  Storm Water Drainage Design  Sanitary Sewer Systems  Municipal Water Supply  Parking Facility Design SCOPE OF SERVICES OVERVIEW 8

 Field Visits  Workshops with Client- Tribal Government and Community PROJECT MANAGEMENT Field Surveyor: Ian Braun Fill/ Grading Plan: Mohamad Haikal Bin Maamor Sidewalk/Paving : Jorge Hernandez General Manager: Andrew Halley 9

 First step for civil site design  Used to create a detailed topographic map  Necessary task for all aspects of civil site design  Establish control points from ADOT highway monuments  Confirm work with past surveyors Deliverables: Contour Map, Proposed Fill/Grading Plan, Control Point Data Table LAND SURVEYING 10

 The current condition of the 7.5 acre parcel is bare earth  A large combined parking facility is proposed  The proposed paved parking facility and museum structure will alter the existing hydrology of the property  Using the topographic map, the team will analyze new drainage issues  Sizing hydraulic structures such a drop inlets and culverts will be considered  Outflow will be fed into adjacent permeable grassland  Potential for an oil water separator Deliverables: Runoff Analysis, Hydraulic Structure Design Specifications STORM WATER DRAINAGE 11

 Peach Springs, AZ has citywide water distribution and wastewater removal  The proposed sanitary sewer should be designed and constructed in compliance with the Arizona Administrative Code  Blue stake will be contacted and existing utility lines will be shown on the contour map  Municipal water/sanitary sewer connection will be coordinated with public works Deliverables: Lines Located on Contour Map, Proposed Schematic for Acceptable Connection Location SANITARY SEWER/MUNICIPAL WATER SUPPLY 12

 The proposed Hualapai museum will bring increased traffic to the area.  A traffic count will be conducted on the surrounding intersection.  Utilizing a modeling software the parking facility can be sized accordingly.  Using the volumes from the analysis, and complying to the ADA guide lines the parking lot will be designed.  Walkways and sidewalks will be designed as deemed necessary by the stakeholders Deliverables: PetraPRO report, Synchro Printout, AutoCAD Drawing of Parking Facility PARKING FACILITY DESIGN 13

PROJECT DESIGN TIMELINE 14

PROPOSED BUDGET 15 Task NamePositionAmount Cost per Hour Duration (hrs) Total Land Survey Permitting for Onsite VisitN/A0$ $0.00 Research Land Information Sr. Engineer 1$ $2, Mobilization and DemobilizationEngineer4$75.006$1, Establishing ElevationCrew man2$45.002$ Topographic SurveyCrew man2$ $ Drafting Sr. Engineer 1$ $1, Grading Develop a Grading PlanEngineer2$75.008$1, Drafting of Grading PlanEngineer2$75.008$1, Building Footprint Design Building Footprint Sr. Engineer 2$ $4, Draft of Building Footprint Sr. Engineer 1$ $1,200.00

Task NamePositionAmount Cost per Hour Duration (hrs) Total Storm Water Drainage Design Precipitation Analysis/ Research Sr. Engineer 2$ $1, HEC RAS Modeling Sr. Engineer 1$ $ Sizing Hydraulic Structures Sr. Engineer 2$ $2, Parking/ Pedestrian Accommodations Traffic Flow CountEngineer2$75.008$1, Compile Traffic Count DataEngineer1$75.004$ Sizing Parking LotEngineer2$75.008$1, Drafting Parking Lot PlansEngineer1$75.006$ Teaching Garden Walkway Design Sr. Engineer 2$ $2, Drafting of Walkway Plans Sr. Engineer 1$ $ Total$26, PROPOSED BUDGET CONTINUED

QUESTIONS? 17