Preliminary Design of Galvez Estates Subdivision
Summary of Topics Introduction General Site Information Sanitary Sewer Design Design of Subdivision Hydrologic Analysis Traffic Impact References
General Site Location LA 42
General Site Information Development Site: Tracts A & B Development Size: 47.9 Acres Lot Size: 70’x150’ Minimum Number of Lots: 100 Land Cost: $30,000/acre Construction Cost: $450/linear foot of street Profit Goal: >$2.5 million
Sanitary-Sewer Design Pipe Size Design Based on: Peak Flowrate Manning’s with PVC Pipes Flowing Half-Full Q peak = 1.69 cfs Diameter = 1.7” ~ 2” Per EBR: Minimum Pipe size = 8”
Sanitary-Sewer Design Velocity Requirements Minimum Velocity = 2 fps Maximum Velocity = 10 fps Manning’s with PVC Pipes Flowing Half-Full V = 2.4 fps
Sanitary-Sewer Design
Design of Subdivision
Lot size of 70’x 150’ Lot frontage along Curved Right of Ways held to 70’ at building line Building Lines held to 25’ 122 lots Curb and gutter with subsurface drainage
Design of Subdivision Road Design 12 feet utility servitude outside 50 ft right-of-way Surfaced with 3”asphalt cement over 12” soil cement sub base Road designed above Base Flood Elevation of 18’ Minimum road slope of 0.4%
Road Cross Section
Preliminary Earthwork CUTFILL POND96,500 C.Y ROADWAYS8,700 C.Y.1,900 C.Y. LOTPADS T.B.D.
Drainage Design Site Conditions Topography Soil Types Flood Zone Pre-Development Drainage Post-Development Drainage Fill Mitigation Design Storm
Soil Types Calhoun Silt Loam 81.1% of Site Deerford-Verdun Complex 17.9% of Site Olivier Silt Loam 1% of Site Predominately Hydrologic Group D
FEMA F.I.R.M. FIRM Panel# 2205C0035E Flood Zones “AE” & “X” BFE=18.0’
Pre-Development
Catchment Area 1Discharge Rational Method Weighted Runoff Coefficient, C = 0.32 Intensity, I = 4.0 in/hr (EBR Drainage Manual) Area, A = 47.2 Ac (Includes 7 Ac of adjacent land) Pre Development Discharge, Q = 60.4
Post Development
Fill Mitigation Not an Issue Majority of Site is above Base Flood Elevation 1,100 C.Y. of Storage Loss due to Fill Pond Normal Pool Below B.F.E. B.F.E.=18.0’ Normal Pool = 13.75’ Potential for >30,000 C.Y. of Storage Offsets Loss due to Fill
Design Storm 10 yr, 24 hr Event Total Rainfall = 8.5” (EBR Drainage Manual) Modeled in HydroCAD SCS - Type III Event
Post-Development Hydrograph
Current Site Conditions Route: LA0042 milepoint: station: Year – ADT 2007 – Route: LA0933 milepoint: 0.82 station: Year – ADT
Traffic Impact Analysis (Per Institute of Transportation Engineers’ Trip Generation Model)
Design Vehicle S-Bus36 Minimum Design Turning Radius = 38.9’ Centerline Turning Radius = 34.9’ Minimum Inside Radius = 23.8’
Galvez La 932 La 932 Galvez Boulevard
Permits Lousiana DOTD Right Of Way Permits Highway Access, Utilities, Vegetation Department of Health And Hospitals Sanitary Sewer, Onsite Treatment Ascension Parish Subdivision Permit
References East Baton Rouge Parish Unified Development Code Trip Generation – Institute of Transportation Engineers - 6 th Edition Google Maps AASHTO Guide for Design of Pavement Structures