CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES.

Slides:



Advertisements
Similar presentations
The State of Natural Gas Pipelines in Fort Worth.
Advertisements

Department of Environmental Quality Environmental Management System Overview.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Gas Gathering Update Pipeline Safety – Getting to Zero Pipeline.
August 21, 2012 Western Regional Gas Conference Paul Gustilo Southwest Gas Corporation.
Pipeline Replacement Programs Presentation By Frank Radigan Hudson River Energy Group June 26, 2012.
Interstate Natural Gas Association of America INGAA Action Plan to Build Confidence in Pipeline Safety INGAA Integrity Management Continuous Improvement.
Overview of Key Rule Features
Workplace Safety and Health Program
You Don’t Always Have To Be Told What To Do Christina Sames Vice President Operations and Engineering November 2011.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration U. S. Department of Transportation Pipeline and Hazardous.
ILLINOIS COMMERCE COMMISSION Darin Burk Pipeline Safety Program Manager.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
South Dakota Gas Pipeline Safety Program 2011 Summary.
ORC Asia Pacific Safety, Health & Environment Forum Mind of the Customer Presentation ExxonMobil Scott Arvin Asia Pacific Downstream & Chemical SHE Manager.
Western Regional Gas Conference August 25, 2009 Distribution Integrity Management Programs (DIMP) & SHRIMP.
Technical Advisory Committee December 2012 Fitness for Service.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Lessons Learned….. Were PG&E practices an anomaly or the tip of a bigger problem? How would we know? 2011 Pipeline Safety Trust Conference – Getting to.
LOGO Arizona Corporation Commission Safety Division Robert Miller.
Scenario Based Auditing
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration National Association of Pipeline Safety Representatives US DOT.
Asset Management Planning for Pipe Renewal Peter Kraft Treated Water Planning.
D AMAGE P REVENTION : A RE THE S TATES AS E NGAGED AS T HEY N EED TO B E ? C HRISTINA S AMES V ICE P RESIDENT O PERATIONS & E NGINEERING A MERICAN G AS.
Distribution Integrity Management – What To Expect John Erickson, PE American Public Gas Association Western Regional Gas Conference.
Safety Stand Down – Together We Will Make the Difference.
RAILROAD COMMISSION OF TEXAS Alan C. Mann Oversight and Safety Division September 2015.
Aging Infrastructure Management and Challenges Sue Fleck Vice President Pipeline Safety Trust “Getting to Zero’ Conference 2011.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
ILLINOIS COMMERCE COMMISSION Darin Burk Manager – Pipeline Safety 1.
Pipeline Safety: How the Mayor’s Council On Pipeline Safety Can Help Presentation to: Mayor’s Council on Pipeline Safety Conference Name: Christopher A.
Reducing Third Party Damage to High Pressure Pipelines Neil Jackson Policy Manager, Transmission.
1 November 3, 2006 David Knoelke API Public Awareness Committee Chair (BP Pipelines N.A.) Greater Public Involvement – What does that mean?
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Pipeline Safety – 2015 Year in Review. Large PHMSA Budget Increase Pipeline Safety spending in 2015 was increased $26.9 million. Main areas of expansion.
How Old is too Old? Who Makes that Decision? Alan Mayberry New Orleans, Louisiana Pipeline Safety Trust Annual Conference
Distribution Integrity Management Program
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
1 Compression Fittings. 2 Background Advisory Bulletin ADB Advisory Bulletin PHMSA-RSPA Incidents Other Issues Post Failure Modes Other.
LESSONS LEARNED FROM RECENT PIPELINE INCIDENTS FLORIDA NATURAL GAS ASSOCIATION (FNGA) OPERATING & MARKETING CONFERENCE ROD WALKER PRINCIPAL CONSULTANT.
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
Pipeline Safety Trust Public Awareness Issues John W. Pepper Project Manager Office of Pipeline Safety Southwest Region, Houston, Texas.
Pipeline Safety Management Systems
Federal Regulatory Update
2017 Mid Year Meeting Denver, CO
Leading With Safety Mike Huwar, President
Melissa Holbrook Cell:
Update on regulations and SIF programs American Public Gas Association
Melissa Holbrook Kentucky Public Service Commission September 19, 2017
Pipeline Safety Issues
Meter Set Protection American Gas Association
Public Awareness at Consumers Energy
Workforce Planning and Forecasting
AGA Workshop Resource Management and Work Forecasting
Gas Utility Operations Best Practices Program
Leak Management Best Practices
AGA Positions on Current PHMSA Rulemakings
TEIC Integrated Management System
Key Performance Indicators
Public Awareness Compliance Elevating Awareness...Creating Engagement
Public Awareness Best Practices Executive Roundtable Presentation PG&E
What’s next for Gas Utilities?
DTE Gas Company Leak Management Plan
Minnesota Energy Resources Danny Quint Compliance Supervisor
AGA Operations Conference
Distribution Integrity
Presentation transcript:

CAST IRON INVENTORY DARIN BURK PIPELINE SAFETY PROGRAM MANAGER, IL COMMERCE COMMISSION PAST CHAIRMAN, NATIONAL ASSOCIATION OF PIPELINE SAFETY REPRESENTATIVES

NATIONAL INVENTORY DECEMBER 2013 CAST IRON GAS MAIN EXISTS IN 35 STATES 30,905 MILES 11,991 CAST IRON SERVICE LINES

CAST IRON MAIN INVENTORY REDUCTION

CAST IRON SERVICE LINE REDUCTION

BARE STEEL PIPE INVENTORY DECEMBER ,883 MILES OF BARE STEEL MAIN NATION WIDE 2,361,093 INDIVIDUAL BARE STEEL SERVICE LINES NATION WIDE

BARE STEEL MAIN REDUCTION

BARE STEEL SERVICE LINE REDUCTION

STATES WITH COST RECOVERY MECHANISMS AS OF SEPTEMBER 2012

EXCAVATION DAMAGE REMAINS THE NO. 1 CAUSE OF SIGNIFICANT INCIDENTS

SIGNIFICANT DISTRIBUTION INCIDENTS

DISTRIBUTION INCIDENT FATALITIES

GAS DISTRIBUTION INCIDENTS 2013

CAST IRON REPLACEMENT CHALLENGES RISK BASED REPLACEMENT PROGRAMS QUALIFIED WORKFORCE SCHEDULE CONFLICTS WITH MUNICIPALITIES EXPANSION VS. REPLACEMENT

RISK BASED REPLACEMENT PROGRAMS IDENTIFICATION OF HIGHEST RISK PIPE BASED ON DIMP PROGRAM CAST IRON MAY NOT BE THE HIGHEST RISK PIPE IN THE SYSTEM BARE STEEL COPPER VINTAGE PLASTICS

VERIFICATION OF IMPLEMENTATION MUNICIPAL PROJECT DEVIATIONS ROAD OPENING PROHIBITIONS BUDGET CONSTRAINTS UNFORESEEN FINANCIAL ISSUES MAY DELAY PROJECTS

RISK BASED PROGRAM SHOULD IDENTIFY CORROSION / GRAPHITIZATION LEAK PRONE PIPE SPECIFIC RISKS TO PIPE THIRD PARTY DAMAGE OUTSIDE FORCES MATERIAL FAILURE ETC.

QUALIFIED WORKFORCE LIMITATIONS NEW CONSTRUCTION IS NOT A COVERED TASK UNDER OPERATOR QUALIFICATION CONTRACTED LABOR CAN INSTALL NEW PIPE BUT CANNOT PERFORM TIE IN TO LIVE GAS OPERATOR QUALIFIED WORKFORCE CANNOT KEEP UP WITH CONTRACTOR CREWS MOVE OUT OF METER SETS LINE STOPPING MAIN TIE INS

SCHEDULE CONFLICTS MUNICIPAL INFRASTRUCTURE REPLACEMENT PROGRAMS CI OFTEN REPLACED IN CONJUNCTION WITH SEWER REPLACEMENT OR ROAD RENEWAL MUNICIPAL PERMITTING EXCAVATION PERMITS MUNICIPAL LINE LOCATING TRAFFIC ROUTING ISSUES

SYSTEM EXPANSION VS. REPLACEMENT POPULATION GROWTH IN SOME AREAS PULL RESOURCES FROM REPLACEMENT PROJECTS OPERATORS FOCUSED ON OBTAINING NEW REVENUE SOURCES EXPANSION OF NATURAL GAS AVAILABILITY

INTERIM CUSTOMER AND PUBLIC PROTECTION PUBLIC AWARENESS PROGRAMS (PA) INNOVATIVE, ROBUST PA PROGRAMS TO ENSURE RISKS ARE KNOWN TO ALL STAKEHOLDERS ENHANCED PA EFFECTIVENESS EVALUATIONS USE OF NEW INTERACTIVE PROGRAMS AS PIPELINE WATCH TO ENGAGE PUBLIC GA EMERGENCY RESPONDER TRAINING PROGRAM

ENHANCED DIMP CAN REDUCE RISK PROGRAMS THAT FULLY IMPLEMENT THE INTENT OF THE CODE NOT SIMPLY COMPLIANT ENHANCED KNOWLEDGE OF THE SYSTEM CAPTURING INFORMATION AT EVERY OPPORTUNITY ENSURING THAT THE DATA COLLECTED FOR NEW PIPING IS APPROPRIATE AND USEFUL

API RP 1173 PIPELINE SAFETY MANAGEMENT SYSTEMS CAN REDUCE RISK ENGAGE ENTIRE WORKFORCE FROM TOP MANAGEMENT TO FRONT LINE FIELD EMPLOYEES COMMUNICATION OF RISKS IMPLEMENTATION OF OPERATIONAL CONTROLS INCIDENT AND NEAR MISS INVESTIGATIONS SAFETY CULTURE VS. COMPLIANCE CULTURE