Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.

Slides:



Advertisements
Similar presentations
NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Advertisements

Internalizing Stormwater Requirements Between TBR and Facilities Construction Projects and Permanent Stormwater Treatment Mgmt. Steve Casey, PE, CPESC.
MS4 Permit and Storm Water Management Program Overview
The Urban Connection: NPDES and Storm Water in the State of Delaware Sandra M. Goodrow, Ph.D., C.F.M. Environmental Scientist IV Surface Water Discharge.
SW101 Municipal Separate Storm Sewer Systems (MS4s)
Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
4/27/2015 Licking County Engineer’s Office MCM#6 Training MCM#6 – Pollution Prevention/Good Housekeeping for Municipal Operations Licking County & Partners.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
What is NPDES? “National Pollutant Discharge Elimination System”
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Middle Tennessee State University
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
MCM #6: Pollution Prevention and Good Housekeeping for Municipal Operations What to expect during an MS4 INSPECTION.
Stormwater Management University of North Carolina at Chapel Hill Sharon Myers, L.G. Environment, Health, and Safety (919)
Statewide Basic Requirements for Stormwater. New Development, Redevelopment, and Existing Development Stormwater quality issues related to new development,
NPDES Stormwater and the Town of Wrightsville Beach.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
MS4/sMS4 Annual Report Development Thea Lomax Presenter Storm Water Enforcement Thea Lomax Presenter Storm Water Enforcement Prepared 07/04/2011.
TOWN OF NEW CASTLE PHASE II ANNUAL STORMWATER REPORT GP Effective May 1, 2010 Expires: April 30, 2015 Reporting Period: March 10, 2014-March 9,
Module 1: Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
MS4 Permitting Process William Creal Water Bureau Permits Section Chief.
Introduction to MS4 Stormwater Requirements (2009)
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Stormwater Management for Colleges and Universities Phase II for Colleges and Universities State Stormwater Programs Industrial Facilities.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
DRAFT PHASE II STORMWATER PERMIT New Requirements Terri Fashing - MCSTOPPP Manager Wendy Atkins – City of Sonoma Stormwater Coordinator With assistance.
Phase II National Storm Water Regulations What’s in it for you?
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
An Overview of our Community’s Stormwater Management Program
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
Small MS4 General Permit Renewal 1 Small MS4 General Permit Renewal (OHQ000002) Jason Fyffe Ohio EPA Central Office.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
MS4 Permit – Meaning, History, and Annual Report Results Watershed Partners 4/13/
North Hennepin Community College MS4 Plan October 24, 2014.
Fred Noble, P.E. State NPDES Administrator Florida Department of Transportation NPDES MS4 Permit Overview 2016 Maintenance Conference.
NPDES Stormwater Rules Phase 1 implemented in 1990 –Large cities (
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
Summit County MS4.
John Tinger U.S. EPA Region IX
MS4 OVERVIEW 2015.
MS4 = Municipal Separated Storm Sewer System
Presentation transcript:

Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.

Regulatory Oversight Environmental Protection Agency (EPA) – Clean Water Act 1972 Tennessee Department of Environment and Conservation (TDEC) – NPDES Permits for Small Municipal Separate Storm Sewer Systems (MS4)

Phase II MS4 What is an MS4? A conveyance or system of conveyances Owned by a city, town, or other public entity (university) that discharges to water of the U.S. Designed to collect or convey stormwater (including drains, pipes, ditches, etc.) NOT a combined sewer NOT part of a POTW (sewage treatment plant) Who is covered by Phase II? Operators of small MS4s in “urbanized areas” as delineated by the Census Bureau. Essentially, any MS4 not already covered by Phase I. How did APSU end up on this list? In TN, TDEC decided that education institutions that housed students would be considered a small MS4, essentially a small city within a city.

What does this mean for APSU?

Stormwater Management Submit Notice of Intent Receive Notice of Coverage Stormwater Management Plan (SWMP)

Six Minimum Control Measures Public Education and Outreach Public Participation and Involvement Illicit Discharge Detection and Elimination Construction Site Runoff Control Post-Construction Runoff Control Pollution Prevention / Good Housekeeping

Timeline for Implementation NOC- July 2012 PIE Plan – 12 months – July 2013 Illicit Discharge Policy - 18 months – Jan 2014 Enforcement and Response Plan – 18 months – Jan 2014 Stormwater Management Plan (SWMP) – 12 months – July 2013 Inventory of BMPs – 12 months – July year Permit Cycle – BMPs for each year

YEAR ONE – Public Education and Outreach Athletics Grounds / Maintenance HousingCourses Project WET Website PIE

YEAR ONE – Public Participation and Involvement Public Meetings * Citizen Involvement Hands-On Events Method for Public Reporting / Complaints / Questions

YEAR ONE – Illicit Discharge Detection and Elimination Administrative Policy prohibiting non- stormwater discharges - DRAFT Develop and maintain a storm/sewer system map of campus Complaint Reporting Mechanism (Work Order Line or Online) Sanitary wastewater (sewage overflows) Car wash, laundry, or industrial wash water Concrete truck washout – construction Improper disposal of automotive fluids Mop water dumping in storm drain

Construction Site Runoff Control Maintain an inventory of all projects disturbing 1 acre or more* Modify contract language requiring SWPPPs Develop a review process for SWPPPs Develop an audit program with an audit checklist Staff performing inspections attend TDEC’s Level 1 training

Permanent Stormwater Management Develop an inventory and tracking system for permanent stormwater treatment BMPs Review existing design standards for impediments to implementing green infrastructure

Pollution Prevention / Good Housekeeping YEAR ONE Review existing service contracts and modify as necessary Provide General training to Physical Plant staff Develop pollution prevention policies, as applicable Storage of sand, gravel, salt, etc. Sweeping of parking lots What to do with those unknown chemicals Reasonable application of fertilizers and pesticides

TMDLs and 303d Listed Streams Total Maximum Daily Load (TMDL) for e-coli – Red River 303d listed streams – State listed priority impaired streams – Red River

SWMP Oversight and Reporting Develop and maintain the written Stormwater Management Plan Committee – Krissy Spicer, Tom Hutchins, Lindsay Jackson, Mark Davidson, Director of Facilities, Projects and Planning Annual Report to TDEC