Project Management. 5 Basic Functions of Managing ßPlan ßStaff ßOrganize ßDirect ßControl A Review… What do these terms mean to you relative to your project?

Slides:



Advertisements
Similar presentations
Teaching Students Project Management Dr. Bill Oakes, EPICS Director Pamela Dexter, EPICS High School Coordinator 2011.
Advertisements

Unit 252 Planning and monitoring work
Chapter 2: Project Management
Systems Analysis and Design
Slide 1 Systems Analysis and Design with UML Version 2.0 Alan Dennis, Barbara Wixom, and David Tegarden Chapter 5: Requirements Determination John Wiley.
Projmgmt-1/17 DePaul University Project Management I - Work Breakdown Structure Instructor: David A. Lash.
PowerPoint Presentation for Dennis, Wixom & Tegardem Systems Analysis and Design Copyright 2001 © John Wiley & Sons, Inc. All rights reserved. Slide 1.
Systems Analysis and Design Kendall & Kendall Sixth Edition
IS 421 Information Systems Analysis James Nowotarski 11 November 2002.
PowerPoint Presentation for Dennis, Wixom & Tegarden Systems Analysis and Design Copyright 2001 © John Wiley & Sons, Inc. All rights reserved. Slide 1.
IS 421 Information Systems Analysis James Nowotarski 4 November 2002.
© 2008 by Prentice Hall 1 Chapter 2. © 2008 by Prentice Hall 2 Project – a planned undertaking of related activities to reach an objective that has a.
Requirements Gathering. Adapted from PowerPoint Presentation for Dennis, Wixom & Tegardem, Systems Analysis and Design, John Wiley & Sons, Inc. For CSU’s.
L ECTURE 3 – P LANNING - P ROJECT I NITIATION Opportunity Identification System Request Feasibility Analysis Project Management The Project Plan Software.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design Copyright 2000 © John Wiley & Sons, Inc. All rights reserved. Slide 1 Systems.
Planning. SDLC Planning Analysis Design Implementation.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Project Management and Scheduling
Lecture 4: Project Management (Continuation) Dr. Taysir Hassan Abdel Hamid November 3, 2013.
1 Chapter 3 Defining The Problem: Project and People Skills.
PowerPoint Presentation for Dennis, Wixom, & Tegarden Systems Analysis and Design with UML, 3rd Edition Copyright © 2009 John Wiley & Sons, Inc. All rights.
1 Chapter 5 Formulating Solutions: - Project and People Skills.
Project Management Chapter 3. Objectives Become familiar with estimation. Be able to create a project workplan. Understand why project teams use timeboxing.
Requirements Gathering Chapter 5 Alan Dennis, Barbara Wixom, and David Tegarden John Wiley & Sons, Inc. Slides by Fred Niederman Edited by Solomon Negash.
PowerPoint Presentation for Dennis, Wixom & Tegardem Systems Analysis and Design Copyright 2001 © John Wiley & Sons, Inc. All rights reserved. Slide 1.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
Project Management. Lecture 5-2 Introduction This lecture discusses the key components of project management, role of project manager and techniques to.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Chapter 3: Project Management
© Copyright 2011 John Wiley & Sons, Inc.
PowerPoint Presentation for Dennis, Wixom, & Roth Systems Analysis and Design, 3rd Edition Copyright 2006 © John Wiley & Sons, Inc. All rights reserved..
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
PowerPoint Presentation for Dennis, Wixom & Tegardem Systems Analysis and Design Copyright 2001 © John Wiley & Sons, Inc. All rights reserved. Slide 1.
PowerPoint Presentation for Dennis, Wixom, & Tegarden Systems Analysis and Design with UML, 3rd Edition Copyright © 2009 John Wiley & Sons, Inc. All rights.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Project Management in the Software Development Environment CIS490.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
Lecture 3: Project Management Dr. Taysir Hassan Abdel Hamid.
PowerPoint Presentation for Dennis, Wixom, & Roth Systems Analysis and Design, 3rd Edition Copyright 2006 © John Wiley & Sons, Inc. All rights reserved..
Project Management Chapter 3
YOU'VE CHOSEN YOUR TEAM August 1997 HOW DO YOU MAKE IT WORK? BERLING ASSOCIATES C 1997 R. Michael O'Bannon and Berling Associates.
Information System Project Management.  Some problems that org faced with IS dev efforts include schedule delays, cost overrun, less functionality than.
PowerPoint Presentation for Dennis, Wixom & Tegardem Systems Analysis and Design Copyright 2001 © John Wiley & Sons, Inc. All rights reserved. Slide 1.
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design, 2 nd Edition Copyright 2003 © John Wiley & Sons, Inc. All rights reserved.
Working and Writing in Teams Module Eighteen Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Copyright © 2015 John Wiley & Sons, Inc. All rights reserved. Information Technology for Management Chapter 13: Project Management and SDLC Prepared by.
Tuckman’s 5 Stages of Group Development
Slide 1 Critical Success Factor : Project Management Project Management is the process of _______ the development of a system with a specified _____ frame.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Slide 1 Systems Analysis and Design with UML Version 2.0 Chapter 4 Project Management.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Lecture 3: Project Management Dr. Taysir Hassan Abdel Hamid.
Slide 1 Project Management Chapter 4. PowerPoint Presentation for Dennis, Wixom & Tegardem Systems Analysis and Design Copyright 2001 © John Wiley & Sons,
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit.
PERTEMUAN-2 Chapter 2. Project Selection and Management
Project Management Chapter 3.
Project Management Processes
Systems Analysis and Design
“Plan the work. Work the plan.” ~ Old Saying
Planning Phase: Project Control and Deliverables
System analysis and design
Project Organization Chart Roles & Responsibilities Matrix
Part II Project Planning © 2012 John Wiley & Sons Inc.
Project Management Processes
Presentation transcript:

Project Management

5 Basic Functions of Managing ßPlan ßStaff ßOrganize ßDirect ßControl A Review… What do these terms mean to you relative to your project?

Key Definitions ßProject management is the process of planning and controlling the development of a system within a specified timeframe at a minimum cost with the right functionality. ßA project manager has the primary responsibility for managing the hundreds of tasks and roles that need to be carefully coordinated. Without a project manager, how will you make sure the tasks and roles in your teams will be managed & coordinated?

CREATING THE WORK PLAN

A Workplan Example Work Plan InformationExample Name of taskPerform economic feasibility Start date`Jan 05, 2001 Completion dateJan 19, 2001 Person assignedMary Smith, sponsor Deliverable(s)Cost-benefit analysis Completion statusOpen PriorityHigh Resources neededSpreadsheet Estimated time16 hours Actual time14.5 hours Note, you would have one of these for each TASK.

Identifying Tasks ßTop-down approach ßIdentify highest level tasks ßBreak them into increasingly smaller units

Top Down Task Identification Phases Phases with high level steps Work PlanDeliverablesEstimatedActual Assigned hourshoursTo *

Getting the Right Numbers for Estimation ßPrior projects ßPast experience ßDetailed analysis

Increasing Complexity with Larger Teams

Timeboxing ßFixed deadline ßReduced functionality, if necessary ßFewer “finishing touches” There will come a point in time when you will have to say, “ENOUGH! We have to move on with what we’ve got.” You will not attain perfection.

Timeboxing Steps ßSet delivery date ßPrioritize features by importance (A) ßBuild the core (B) ßPostpone unfinished functionality (C) ßDeliver the system with core functionality ßRepeat steps A-C to add refinements and enhancement as time allows

STAFFING THE PROJECT Subtitle: Managing the People Element

Teams are Susceptible to Risky Shifts ßGroups tend to gamble more than individual members would if each were making the decision alone ßFor example: when groups try to do more with a project than they have time available. ßUnderlying cause: a diffusion of responsibility ßE.g., It is not clear who is in charge of the outcome, so no one is ßRemedy: Specific roles & responsibilities for members

Roles & Responsibilities ßRecorder: takes notes on major points that are raised and summarizes as needed ßTimekeeper: monitors the time allocated to discussion and reminds the group of how much time is left ßDiscussion Leader: provides overall guidance and direction to the group's activities. Essential to facilitate smooth, efficient functioning of a group.

ßSpokesperson: reports on the group's activities ßLogical Thinker: insures that the positions developed are supported by evidence ßDevil's Advocate: challenges what others say ßProcess Observer: comments on how the group worked together after completion of a group meeting We will revisit these momentarily...

3 Typical Issues for Teams Output QualityHigh Time Required Team AcceptanceHigh Low

3 Typical Issues for Teams Scenario 1 Output QualityHigh Time Required Team AcceptanceHigh Low Hurry Up! I can’t waste any more time on this! What happens to Decision Quality & Team Acceptance?

3 Typical Issues for Teams Scenario 1 Output QualityHigh Time Required Team AcceptanceHigh Low Hurry Up! I can’t waste any more time on this! What happens to Decision Quality & Team Acceptance?

3 Typical Issues for Teams Scenario 2 Output QualityHigh Time Required Team AcceptanceHigh Low What happens Time Required? I refuse to settle for any grade lower than an A!

3 Typical Issues for Teams Scenario 2 Output QualityHigh Time Required Team AcceptanceHigh Low What happens Time Required? I refuse to settle for any grade lower than an A!

Conflict Avoidance Strategies ßClearly define roles and project plans ßHold individuals accountable ßCreate project charter listing norms and groundrules ßDevelop schedule commitments ahead of time ßForecast other priorities and their possible impact on the project

Beware! Teams Can Fall Victim to Groupthink... Essentially groups come to believe: "There is only one way to do things -- our way." "We can do no wrong here."

Indicators of Groupthink ßpush all team members to think alike ßignore or discount alternative points of view ßbelieve that the group is incapable of making a bad decision ßput down or chastise those who criticize the "will of the majority" ßto ignore or discount criticism of the group's work or the product it produces

Groupthink... ßaffects groups working on almost any task where there is pressure to finish a task in a relatively short amount of time. ßRemedy: members assume the roles of ßdevil's advocate ßlogical thinker ßprocess observer

CONTROLLING AND DIRECTING THE PROJECT

The Hurricane Model Project Stage Time

Hurricane Model The rest of the team swirls around one dominant person

Tornado Model Destructive whirlwind of activity

Team Model Planned activity where each team member creates a piece that fits into and completes the whole

Tracking Tasks Using Gantt Chart Action Week

Documentation ßProject binder ßTable of contents ßContinual updating

Managing Scope ßScope creep -- a major cause of problems ßFormal change approval We’ve already been through this … 30 minutes -> 3 hour presentations

Classic Mistakes ßOverly optimistic schedule ßFailing to monitor schedule ßFailing to update schedule

Summary ßProject management is critical to successful development of new systems ßProject management involves planning, organizing, directing, controlling and reporting on time and labor.

Resources: ßPowerPoint Presentation for Chapter 4, Project Management, in Dennis, Wixom & Tegardem, Systems Analysis and Design, 2001, John Wiley & Sons, Inc. ßAnthony Grasha, Teaching with Style, 1996, Alliance Publishers