Basic Response Letter Last Updated 01.31.2009. Basic Response Letter The response redesign in SERFF 5.6 introduces the concept of inline schedule item.

Slides:



Advertisements
Similar presentations
Welcome to eDMR This PowerPoint presentation is designed to show eDMR users how to login and begin using the eDMR system.
Advertisements

Welcome to the Online Employment Applicant Tutorial Click here for next screen.
Welcome to WebCRD.
Introduction to Online Ordering. Log in to OK Choice The web address for OK Choice is Enter your User.
Creating and Submitting a Necessary Wayleave Application
Google Apps Access Google Apps from the Parkland Intranet Page:
Refresher Instruction Guide Strategic Planning and Assessment Module
EvalS Application User Guide version September 17, 2011.
1 Vendor Reverse Auction - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines.
CPIT 102 CPIT 102 CHAPTER 1 COLLABORATING on DOCUMENTS.
GSA eBuy Seller’s Tutorial
Center Accreditation Online System
HELP GUIDE NEW USER REGISTRATION (SLIDE 2) TAKING A QUIZ (SLIDE 8) REVIEWING A QUIZ (SLIDE 17) GROUP MEMBERSHIP (SLIDE 26) CREATING QUIZZES (SLIDE 31)
How to Submit a New Human Ethics Application. Click to create a new Human Ethics application for a brand new study.
1 of 6 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
WebCT CE-6 Assignment Tool. Assignment Tool and Assignment Drop Box Use “Assignment” button under Course Tools (your must be in “Build” mode) to: –Modify.
The Objection Icon Last Updated The Objection Icon The Objection icon was introduced as part of the Response Redesign in SERFF v5.6. This.
Compliance Assist Refresher Instruction Guide Adding or Editing Unit/College Strategic Goals.
1 Vendor RFI - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
Quick Start Guide: Filters Advanced Learn about: 1.What filters are and their functionality 2.How to create a filter using Samples, Equipment & Labels.
Gasoline and Diesel Event User Guide. Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
Indistar® Leadership Team Meetings. Where can we plan a meeting? From the Navigation Toolbar, simply click on ‘Team Agendas & Meetings’
Introduction to eForms and Workflow In OnBase For the Finance Center User February 2015 For the Finance Center User February
UC Berkeley, Employment Services Candidate Gateway Tutorial External Applicants.
UC Berkeley Employment Services Candidate Gateway Tutorial Internal Applicants.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Nipissing’s ROMEO e-System Internal Research Funding (IRF) Internal Research Grant Application Form (IRG)
EContract Authoring Supplier Training Material. ‘Supplier Review’ Process.
Log on to the site using your User ID and Password and select journal and click “Log In” Click here to create a new account Click here to check the system.
Division of Alcoholic Beverages and Tobacco Liquor Distiller’s and Rectifier’s Monthly Report.
1 OrderPro Point of Sale (POS) Training Prepared by Christina Van Metre Independent Educational Consultant CTO, Business Development Team © Training Version.
Pmz/lt/mypres/c1Intro1 LiveText at CBU Electronic Portfolios! Introduction to LiveText New Generation (C1)
How to Respond to Requested Changes and Provisos.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Processing Exempt Submissions 1-page Reference Guides.
How can I respond to an IRB CAL Letter? It’s easy…just follow the steps on the next few slides.
How to Electronically Sign your Protocol on the eIRB IRB Office Building 1- Room 229 Version: January 28, 2015.
Compliance Assist Refresher Instruction Guide Adding or Editing Student Learning Outcomes.
Researcher training for ACAP © Created by Isaac P. E. Mailleue Research Integrity Coordinator University of North Carolina at Greensboro September 2013.
Vendor’s Malt Manufacturing Return. Log in with the user id and password provided through the EDS registration process and click on the Login button.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
Ver. 02/13/  Registration  New Studies  Continuing Reviews  Amendments  Reportable Events  Tips & Tricks  Questions 2.
Training Guide Copy/Print. Log into Inside Augsburg.
Indicator 13 Secondary Transition. Main Menu SPP13 has a navigation toolbar located at the top of each screen. If you use the toolbar to navigate to another.
Contract Invoice Guide
How to Submit a New Human Ethics Clinical Application.
How to Submit a New Human Ethics Behavioral Application.
EContract Authoring Supplier Training Material Caterpillar Non-Confidential.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
Contact Contact Teacher Training Service Tracking.
Installing RMS 3.0 Contractor Mode
Journal of Mountain Science (JMS)
Customer Online Ordering
Administrator Training
ADE EDIS READ & Optimizer TRAINING Colorado Department of Education
OCC/RAPS Feature Commonwealth of Pennsylvania Department of Revenue
Searching and Navigating in Coeus
Audit Documentation and Administration
SUNY Pre Award and Compliance Systems Institutional Review Board (IRB)
Distributor Want aka. Dis-WAnt
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Overview of Contract Association Batch Upload
References & Recommendations
Controller’s Office – Journal Voucher eForm January 22, 2019
Home Tab – Task List Now please remember that in order to utilize this functionality trade users will need “Full Access” to “Forms” and the mode of communication.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Training Continuing Reviews and Amendments for General AUPs.
References & Recommendations
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

Basic Response Letter Last Updated

Basic Response Letter The response redesign in SERFF 5.6 introduces the concept of inline schedule item editing. Rather than starting with the Response Letter, the user will start by making their schedule item changes directly on the schedules. Revisions and additions can be made to the Form, Rate/Rule, and Supporting Documentation schedules. Please note that on the Rate/Rule schedule, only schedule item data may be added or revised. The rate data is not currently revisable and may not be added if omitted on the original submission.

Once all the necessary schedule item changes have been made, it is time to start the Response Letter. To do so, navigate to the Correspondence tab and click the Respond button next to the Objection Letter. The "Respond" button will not be available if the filing is closed or is still in Revise Mode. To exit Revise mode, click "Save". Basic Response Letter Click here to start a Response Letter.

Upon initiation of a new Response Letter, SERFF will attempt to match schedule item changes to an Objection. These automatic matches will be made between Objections and revisions of the schedule items to which they pointed. SERFF will create a copy of that item to which you can make your changes. If an attachment is changing, be sure to remove the old version by click the remove link next to the attachment name. You may then add the new version of the attachment. If a schedule item has multiple attachments, only remove and replace the ones that are changing. Basic Response Letter The Response Letter will be displayed to the user in a new window. The Objections from the corresponding Objection Letter will be displayed in order and below each will be any schedule item changes the system matched to that Objection.

If a schedule item is listed for an Objection to which it does not belong, click the "Remove" button next to that schedule item. This will disassociate the schedule item from that Objection. It will not remove the draft schedule item from the filing or from other Objections. Review each Objection to ensure it reflects all the appropriate changes for the state's review. Here are some tips on making sure changes go in the right place. Basic Response Letter Click Here to revise this schedule item.

SERFF will display a list of all the draft schedule item additions and revisions on this filing. Select the items to match with this Objection and click "Add Item(s)." The changes will be associated with the Objection. If you made a schedule item addition or revision that goes with the Objection but it does not display, click the "Add Schedule Item(s)" button. Basic Response Letter Click Here to revise this schedule item. Click here to associate another schedule item addition or revision with this Objection.

SERFF will display a list of all the draft schedule item additions and revisions on this filing. Select the items to match with this Objection and click "Add Item(s)." The changes will be associated with the Objection. SERFF will display a list of all the draft schedule item additions and revisions on this filing. Basic Response Letter Click Here to revise this schedule item. Select the items to match with this Objection and click "Add Item(s)." The changes will be associated with the Objection.

SERFF will display a list of all the draft schedule item additions and revisions on this filing. Select the items to match with this Objection and click "Add Item(s)." The changes will be associated with the Objection. Once all comments have been entered and changes have been associated with the various objections, click “Save”. Basic Response Letter Click Here to revise this schedule item. Review the Response Letter in it’s entirety. When everything is complete, click “Submit”.

Remember that a schedule item revision or addition can go with multiple Objections if appropriate. If no schedule item revisions or additions were needed for a given Objection, simply enter a comment for that Objection. Additional schedule item additions or revisions can not be made within the Response Letter. To make another change, save the Response Letter and go back into Revise mode. Once the changes are made and saved, return to the Response Letter through the Filing Correspondence tab and associate the items with the appropriate Objection. The Comment field for each Objection is required. The user will not have a submit button until all required fields are complete. Other Tips Basic Response Letter Click Here to revise this schedule item.