Earl Pendley Robert Lisy March 6, 2007 Earl Pendley Robert Lisy March 6, 2007 Upper Stage RFP Volume III ITO Cost Volume Briefing.

Slides:



Advertisements
Similar presentations
RFP AND CONTRACT PHASE Jeff Wassenaar, P.E., HQ Project Development Benjamin Acimovic, P.E., Region 1.
Advertisements

U.S. Pretrial Services and Probation Office Northern District of Ohio.
Closeout (Preparing for the End)
Contract Pricing and Pricing Strategies
FAR Part 44: Subcontracting Policies & Procedures February 5, 2012.
1 Cost/Price Proposal Overvi ew Communications, Outreach, Multimedia and Informational Technology (COMIT) John Moore Cost/Price Analyst February 18, 2015.
Andrea O’Neill Cost/Price Analyst ACC-RSA. Elements of a Proposal; Proposal Example Indirect Rate Calculations Unallowable Costs; Preparing For Negotiations;
I n t e g r i t y - S e r v i c e - E x c e l l e n c e PPNM’s/PNM’s Date: 29 Dec 2006.
February 2006 The Importance of Subcontract Management to Program Success.
Welcome to the Johnson Space Center International Space Station Russian Language and Logistics Services (RLLS) Cost and Pricing Pre-Proposal Conference.
Dryden Flight Research CenterNovember 8, Aerospace Ground Equipment Support Services Price Proposal & Evaluation Linda Gaugler Mathematician (Lead)
Source Selection. What is Source Selection? Source Selection is the process of conducting competitive negotiations. Source Selection allows the Government.
IDOA Office Supply and Toner Products Pre-Proposal Conference May 14, 2012 Adam Thiemann IDOA Strategic Sourcing Analyst.
GWAC Ordering Procedures Overview
Aerospace Ground Equipment (AGE) Support Services Pre-Proposal Conference/ Site Visit Kari M. Alvarado Contract Specialist NASA-DFRC November 8, 2006 Dryden.
Indiana Hoosier Lottery Lottery Draw Witness Pre-Proposal Conference September 14, 2012 Stan Judson IDOA Strategic Sourcing Analyst.
Welcome to the Johnson Space Center Center Safety and Fire Operations (CSFO) Contract Cost and Pricing WebEx November 13, :00 a.m. - 10:30 a.m. 1.
IDEM/OWQ Laboratory Analytical Services Pre-Proposal Conference December 5, 2011 Adam Thiemann IDOA Strategic Sourcing Analyst.
Welcome to the Johnson Space Center International Space Station Mission and Program Integration (MAPI) Cost and Pricing Pre-Proposal Conference February.
Welcome to the Johnson Space Center (JSC) Pricing Forum Tuesday, June 28, 2005 Gilruth Center, Alamo Ballroom 1:30 – 3:30 PM.
Welcome MAIL AND DUPLICATION SUPPORT SERVICES (MADSS) Price Overview Herb Rocha Price Analyst June 12, 2014.
Advertising Agency Services Request for Proposal Pre-Proposal Conference February 22, 2012 Chad Johnson Strategic Sourcing Analyst.
1 Johnson Space Center RFP Pricing WebEx Advance Technology and Integration Contract (ATIC) Volume III, Price Proposal Overview July 25, 2013 Wally Khan.
Pre-Proposal Conference January 17 th, :00AM Jennifer Michael, IDOA Strategic Sourcing Analyst Assessment Classes Pertaining to Level III Assessor/Appraiser.
Proposal Pricing Training February 2004 Lance I. Stadler Pricing Manager, Corporate Headquarters Stanley Headquarters 300 North Washington Street, Suite.
1 Final RFP Pricing WebEx JSC Engineering, Technology and Science Contract (JETS) May 3, 2012 Rosa Arevalo Cost/Price Analyst.
Indiana State Personnel Dept. CDL/Non-CDL Controlled Substance and Alcohol Testing Pre-Proposal Conference September 24, 2012 Greg Moorman IDOA Strategic.
Indiana Public Works Vertical Lift Equipment Maintenance Request for Proposal Pre-Proposal Conference June 18, :00 AM Greg Moorman, Strategic.
IDOA RFP Media Buy Pre-Proposal Conference June 11, 2013 Adam Thiemann IDOA Strategic Sourcing Analyst.
OCCUPATIONAL MEDICINE AND OCCUPATIONAL HEALTH CONTRACT(OMOHC) COST VOLUME INSTRUCTIONS Joe Campbell (BD) February 16, 2005.
Additional Commercial Contract Types FAR Case Summary of Comments from October 19, 2004 Public Meeting Appropriate Use Terms and Conditions Payment.
New Time and Material Requirements Glenn Baer March 2007.
A/E Acquisition Process 1 Architect – Engineer Acquisition Process Robert Theel – Director Arch. & Eng. Programs Division (Reg. 5) Regional Chief Architect.
1 Welcome to the Johnson Space Center Integrated Mission Operations Contract II (IMOC II) Cost and Pricing Preproposal WebEx August 14, 2013.
1 Test Operations Contract RFP Volume III ITO Briefing RFP NNS09ZDA008R – TEST OPERATIONS CONTRACT (TOC) Ground rules This presentation is intended to.
Software, Robotics, and Space System Services Contract
Priced Proposal Training October/November 2015 DEPARTMENT OF TRANSPORTATION.
Management & Development of Complex Projects Course Code - 706
Submitting a Quality Offer On the GSA Language Schedule GSA Federal Supply Service.
Project Chartering & Approval Process
1 Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) Area 3 Pre-Proposal Site Visit HSBP1015R0040 Sectors EL PASO / BIG BEND, TX
Welcome HUMAN RESOURCES INTEGRATED PROFESSIONAL SERVICES CONTRACT (HRIPS) Price Factor Overview Herb Rocha Cost/Price Analyst October 30, 2015.
1 Welcome to the Johnson Space Center Safety and Mission Assurance Engineering Contract Cost and Pricing Preproposal WebEx September 17, :00 a.m.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
Bureau of Motor Vehicles Alarm Monitoring Services, Equipment and Support Request for Proposal Pre-Proposal Conference July 8, :00 PM Greg.
Technical Information Services Procurement Presentation to Industry October 30, 2003.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
Welcome to the Johnson Space Center International Space Station Russian Language and Logistics Services (RLLS) Cost and Pricing Pre-Proposal Conference.
Federal Acquisition Service U.S. General Services Administration Area Facility Operation Specialist (aFOS) 88 th Regional Support Command Pre-Bid Meeting.
California Energy Commission 1 TECHNICAL SUPPORT FOR INCREASING ENERGY EFFICIENCY IN EXISTING BUILDINGS California Energy Commission Request for Proposals.
Solicitation VA69D-16-R-0583 Rehab Renovation Pre-Proposal Conference June 22, :00am CDT NCO 12 Great Lakes Acquisition Center.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
Presented by NAVSEA, NSWC, for NAVSUP
INDIANA DEPARTMENT OF ADMINISTRATION
CON 280: Source Selection and the Administration of Service Contracts
Post-Award Compliance
Vehicles Request for Proposal 12-2
TRAVEL SERVICES Request for Proposal
CON 280: Source Selection and the Administration of Service Contracts
Shawn Ralston SB Program Manager National Governments AECOM
Cost or pricing data John Cancellara 7 March 2018.
Advice to Industry Panel – Contract Management Perspective
Contracts & Grants Functionality
Today’s Agenda Welcome and Introductions Human Resources – FY’15 Budget Salary Action Guidelines Budget Workshop Calendar Budget Policy Updates Budget.
Omnibus IV Procurement Overview Michael D’Alessandro
Omnibus IV Contracting Strategy Michael D’Alessandro
DOTD Form September 4, 2014.
Certified Cost or Pricing Data vs
IGCE & Technical Evaluation
Presentation transcript:

Earl Pendley Robert Lisy March 6, 2007 Earl Pendley Robert Lisy March 6, 2007 Upper Stage RFP Volume III ITO Cost Volume Briefing

2 Upper Stage RFP Volume III ITO Briefing RFP NNM R - Ares I Upper Stage Ground rules This presentation is intended to assist potential Offerors in their understanding of the Section L Cost Volume III, Instructions to Offerors. In the event of a discrepancy between this presentation and the solicitation, the SOLICITATION TAKES PRECEDENCE. General clarification questions on the presentation will be responded to; however any other questions must be followed up with a written comment per the instructions in the RFP.

3 Upper Stage RFP Volume III ITO Briefing RFP NNM R - Ares I Upper Stage L.14 Proposal Page Limitations Volume III – Cost Factor No Page Limit Cost information only – NO technical data L.15 Proposal Format All Volumes – Submitted in Hard copy and on CD No PDF files, Microsoft Office software

4 Upper Stage RFP Volume III ITO Briefing L.21 Volume III – Cost Factor Prime & Subcontractor Proposals submitted together Copy of Proposal to Gov Audit Office – Hard and CD Proposals are not Certified – “Other than Cost & Pricing Data” requested Major Subcontractor - $50 million at any tier Cost “Visibility” 80% of CLINS 1 & 3 – Prime and Subs 100% of all costs must be accounted for WBS are mapped to CLV master – Table L-2

5 Upper Stage RFP Volume III ITO Briefing L.21 Instructions to Offerors (ITO) Cost Volume - 5 Parts, 11 Sections Part 1 General Cost Information Section 1 – Cover Page Section 2 – Summary Data (Workbook 1) Section 3 – Cost PN-BOEs Section 4 – FAS 13 Section 5 – Subcontractor Analysis (FAR) Section 6 – Systems Reviews CAS, CESR, CPRS, CECSR Section 7 – Information Summary Table L-3

6 Upper Stage RFP Volume III ITO Briefing.L.21 Instructions to Offerors (ITO) (Cont) Part 2 Excel Pricing Model (EPM) Government Standard Format Offeror may “modify” workbooks Section 8 – Workbooks 14 Workbooks – MS Excel files Attachment L-1 Must be self calculating

7 Upper Stage RFP Volume III ITO Briefing  Section 8 – Workbooks  Upper Stage Project Summary  Cost Summary Table  Design, Test and Engineering Support Data  Ares 2 Test Flight  Orion 3 Test Flight  Orion 4 Test Flight  Producibility Engineering  Design, Development, Test and Engineering Phase IDIQ  Operational Upper Stage Flight Unit  Operational Upper Stage Flight Unit Supporting Data  Production Phase IDIQ  Options Upper Stage Flight Unit  Cognizant Audit Office Template

8 Upper Stage RFP Volume III ITO Briefing L.21 Instructions to Offerors (ITO) (Cont) Part 3 Offeror’s Pricing Model Section 9 Offeror’s Pricing Model (OPM) IAW FAR , Table 15-2 Must be self calculating Separate Binder Hard copy and on CD

9 Upper Stage RFP Volume III ITO Briefing L.21 Instructions to Offerors (ITO) (Cont) Part 4 - Contractor Basis of Estimate (BOE) Section 10 Contractor Basis of Estimate Separate Binder Types and Quantities shall reflect Technical and Cost Detail at WBS level Separate Binder Hard copy and on CD

10 Upper Stage RFP Volume III ITO Briefing L.21 Instructions to Offerors (ITO) (Cont) Part 5 – CLIN 5 Pricing Narrative-BOE Provide pricing rational utilized to arrive at each unit price Cost impact of increased production for each of four optional units Ties into Volume 1, Mission Suitability proposed methodologies

11 Upper Stage RFP Volume III ITO Briefing CAOT Submit with Past Performance Volume Cognizant Audit Office Template Workbook 14 CAOT - Cognizant Audit Office Template Is not included in PPV page count

12 Upper Stage RFP Volume III ITO Briefing

13 Upper Stage RFP Volume III ITO Briefing PSTCST Upper Stage Project Summary Workbook 1 CST Cost and Fee totaled on PST Pre Loaded for CLIN 2 & 3 Project Summary Template -PST Tab

14 Upper Stage RFP Volume III ITO Briefing

15 Upper Stage RFP Volume III ITO Briefing EPM Tabs

16 Upper Stage RFP Volume III ITO Briefing STRTBOE Design, Development, Test and Engineering Support Data Workbook, #4 & #11 BOE WYE transfer to STRT WYE #s Summary Technical Resources Template, Subcontractor WYE-STRT Tab

17 Upper Stage RFP Volume III ITO Briefing

18 Upper Stage RFP Volume III ITO Briefing SCT Subcontractor Proposal Design, Development, Test and Engineering Support Data Workbook, #4 & #11 Subject to Prime’s Negotiation Adjustments SCT total amount to equal WBS amounts Subcontractor Cost Template-SCT Tab

19 Upper Stage RFP Volume III ITO Briefing

20 Upper Stage RFP Volume III ITO Briefing TCT Design, Development, Test and Engineering Support Data Workbook, #4 & #11 BOE’s shall justify TCT travel. TCT total amount equals WBS travel amount. Travel Cost Template -TCT Tab BOE

21 Upper Stage RFP Volume III ITO Briefing

22 Upper Stage RFP Volume III ITO Briefing Design, Development, Test and Engineering Support Data Workbook, #4 & #11 MCT BOE MCT – Material Cost Template BOE’s shall justify MCT. MCT total amount equals WBS material amount.

23 Upper Stage RFP Volume III ITO Briefing

24 Upper Stage RFP Volume III ITO Briefing Design, Development, Test and Engineering Support Data Workbook, #4 & #11 ODCT BOE ODCT – Other Direct Cost Template BOE’s shall justify ODCT. ODCT total amount equals WBS ODC amount.

25 Upper Stage RFP Volume III ITO Briefing

26 Upper Stage RFP Volume III ITO Briefing OHTIRLT Design, Development, Test and Engineering Support Data Workbook, #4 & #11 OHT & GAT may be modified for FPRA Overhead Template -OHT Tab

27 Upper Stage RFP Volume III ITO Briefing

28 Upper Stage RFP Volume III ITO Briefing GATIRT Design, Development, Test and Engineering Support Data Workbook, #4 & #11 OHT & GAT may be modified for FPRA GAT Tab

29 Upper Stage RFP Volume III ITO Briefing

30 Upper Stage RFP Volume III ITO Briefing LPTPHCT-T Design, Development, Test and Engineering Support Data Workbook, #4 & #11 Productive Hours used to calculate labor costs Productive Hours Conversion Template – Team - PHCT-T Tab

31 Upper Stage RFP Volume III ITO Briefing

32 Upper Stage RFP Volume III ITO Briefing 1.0 WBS CST Cost Summary Table, Workbook #2 CLIN 1, 8 WBS amounts are summed in the CST by WBS by CY 1.1 – 1.8 WBS X.X.1 – X.X.12 WBS

33 Upper Stage RFP Volume III ITO Briefing

34 Upper Stage RFP Volume III ITO Briefing

35 Upper Stage RFP Volume III ITO Briefing Design, Developmental, Test and Engineering; Ares 2 Test Flight; Orion 3 Test Flight; Orion 4 Test Flight; Producibility Engineering Workbook 3,5,6,7,8 IRT GAT IRT – Indirect Rate Template IRT will provide the weighted average indirect rate for Contractor Fiscal Year to Contract Year (CY)

36 Upper Stage RFP Volume III ITO Briefing

37 Upper Stage RFP Volume III ITO Briefing Design, Developmental, Test and Engineering; Ares 2 Test Flight; Orion 3 Test Flight; Orion 4 Test Flight; Producibility Engineering Workbook 3,5,6,7,8 ILRT OHT ILRT – Indirect Labor Rate Template ILRT will provide the weighted average indirect rate for Contractor Fiscal Year to Contract Year (CY)

38 Upper Stage RFP Volume III ITO Briefing

39 Upper Stage RFP Volume III ITO Briefing Design, Developmental, Test and Engineering; Ares 2 Test Flight; Orion 3 Test Flight; Orion 4 Test Flight; Producibility Engineering Workbook 3,5,6,7,8 ILCT LPT ILCT – Indirect Labor Cost Template ILCT will calculate using the weighted average indirect rate direct labor costs for the CY ILRT

40 Upper Stage RFP Volume III ITO Briefing

41 Upper Stage RFP Volume III ITO Briefing LPT input ILRT input

42 Upper Stage RFP Volume III ITO Briefing Design, Developmental, Test and Engineering; Ares 2 Test Flight; Orion 3 Test Flight; Orion 4 Test Flight; Producibility Engineering Workbook 3,5,6,7,8 MCT ICT SCT TCT ODCT IRT ICT - Indirect Cost Template ICT – Calculates Non Labor Indirect Costs

43 Upper Stage RFP Volume III ITO Briefing

44 Upper Stage RFP Volume III ITO Briefing Design, Developmental, Test and Engineering; Ares 2 Test Flight; Orion 3 Test Flight; Orion 4 Test Flight; Producibility Engineering Workbook 3,5,6,7,8 ICT WBS LPT ILCT SCT TCT WBS – Work Breakdown Structure Costs MCT ODCCT WBS by CY by WBS 1.0 WBS

45 Upper Stage RFP Volume III ITO Briefing Cost Summary Table Workbook 2 CST WBS CST – Cost Summary Template CST summarizes WBS costs by CY

46 Upper Stage RFP Volume III ITO Briefing

47 Upper Stage RFP Volume III ITO Briefing  EPM tabs

48 Upper Stage RFP Volume III ITO Briefing  EPM tabs OHTLRT IRTPBTGAT RDT-T RDT-CS CDST-WAB Correct Flow Diagram Prime and Subcontractor Add ILRT CLIN 2 & 4 ILRT

49 Upper Stage RFP Volume III ITO Briefing IRT Design, Development, Test and Engineering Phase IDIQ Workbook 9 & 11 GATOHT OHT-Overhead Template GAT-General and Administrative Template IRT-Indirect Rate Template Templates are the same as Workbooks 3,5,6,7, & 8

50 Upper Stage RFP Volume III ITO Briefing Design, Development, Test and Engineering Phase IDIQ Workbook 9 & 11 LRTRDT-CS LRT-Labor Rate Template Weights Fiscal Year rate to CY rate

51 Upper Stage RFP Volume III ITO Briefing

52 Upper Stage RFP Volume III ITO Briefing RDT-CS Design, Development, Test and Engineering Phase IDIQ Workbook 9 & 11 RDT-T RDT-CS – Rate Development Template Contractor Specific Develops Fully Burden Labor Rate by CY for an Offeror

53 Upper Stage RFP Volume III ITO Briefing

54 Upper Stage RFP Volume III ITO Briefing Design, Development, Test and Engineering Phase IDIQ Workbook 9 & 11 PBTRDT-T Prime Burdens Template For Subcontractors Labor Rates

55 Upper Stage RFP Volume III ITO Briefing

56 Upper Stage RFP Volume III ITO Briefing RDT-T Design, Development, Test and Engineering Phase IDIQ Workbook 9 & 11 CDST-WBS Rate Development Template - Team Weights Labor Rates for Prime and Subcontractors to Standard Labor Category by CY

57 Upper Stage RFP Volume III ITO Briefing

58 Upper Stage RFP Volume III ITO Briefing Design, Development, Test and Engineering Phase IDIQ Workbook 9 & 11 CDST-WBS Contract Rate Summary by Contract Year – Work Breakdown Structure Establishes Not to Exceed Bid Labor rates for Standard Labor Categories

59 Upper Stage RFP Volume III ITO Briefing

60 Upper Stage RFP Volume III ITO Briefing BOE - Basis Of Estimate

61 Upper Stage RFP Volume III ITO Briefing The End