DROUGHT PRICING – LESSONS LEARNED A Presentation to 2003 RMSAWWA / RMWEA Joint Annual Conference by Kerry Kuykendoll Manager of Rate Administration Denver.

Slides:



Advertisements
Similar presentations
Current Legal Developments on Ratemaking - A Primer on Budget-based Water Rate Structures 1 Paul D. Jones II, P.E. General Manager, Eastern.
Advertisements

Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
1 Amador Water Agency Financial Impacts of Water Shortage and Proposed Shortage Strategy April 9, 2015 The Reed Group, Inc.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Water Service and the Challenges Ahead Maryland-DC Utilities Association Tom Curtis Deputy Executive Director American Water Works Association.
DECEMBER 15, :00 PM TWSD RATE ADJUSTMENT HEARING.
1 BILLING ADJUSTMENTS Utilities Department Orange County Board of County Commissioners March 20, 2012.
California Water Revenue Decoupling Pilot Programs Lisa M. Bilir, Senior Policy Analyst, Division of Ratepayer Advocates NASUCA 2010 Mid-Year Meeting.
Taxes and TIF’s A School District Perspective. What is the Tax Cap? What is the Tax Cap? (PTELL) The tax cap limits the extension of a taxing body’s budget.
Pathways to Lasting Solutions “The Longest Yard” Water Budget Rate Structures & The City of Boulder, Colorado January 25, 2007 © 2006 Malcolm Pirnie, Inc.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
What is the proposed ballot issue? Referred measure 3B: Increased funding for education in School District 51 only Shall taxes on peoples’ property (house,
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
FINANCIAL PLANNING: SHORT TERM AND LONG TERM 1 ENTREPRENEURIAL FINANCE.
Overview of 2011 proposed budget.  Defunded Five Positions  Maintained Service Levels  Continued Infrastructure Improvements  Cut spending early to.
Your Water System Sources of Water reservoir underground aquifer Energy Sources pumps gravity Distribution Network of Pipes.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Smart Metering East Coast, Raleigh NC Revenue Protection Practices Ken Sharratt Principal, Sharratt Water Management Ltd. Toronto, ON, Canada.
Page: Water and Wastewater Rate Study and Financial Forecast Council Presentation City of Cottonwood July 2009.
Independent Review of FY 2008 Proposed Rates D.C. Water and Sewer Authority Public Hearing June 13, 2007.
Elk Grove Water District Water Rate Update and Connection Fees Habib Isaac – Principal April 10, 2013.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
New Hampshire’s Public Water Systems Climate Change Challenges 2014 Annual Meeting Robert Scott, Commissioner, New Hampshire Public Utilities Commission.
Putting Customers in the Driver’s Seat! Shaping Loads through Inverted Block Rates APPA Business & Financial Conference September 24, 2007 Austin, Texas.
One Step Ahead: Using a Finance Plan for Regional Water System Operations Deena Hood Central Wyoming Regional Water System Carol Malesky Integrated Utilities.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
PROPOSAL TO ADJUST CURRENT WATER RATES Goal: Address frequently expressed concerns of citizens  Simplicity  Understandability  Fairness  Liability.
Financial Impact of Drought March 5, 2008 Updated 3/17/08.
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
Cost of Service Based Water and Wastewater Rates City of Lawrence, Kansas February 11, 2004 J. Rowe McKinley Keith D. Barber.
Formation of DWID – Buyout PWCo & SWCo Revenue, Financing and Operational Cost Projections All cost projections are based on PWCo & SWCo Annual Reports.
Winchester Municipal Utilities 2009 Rate Plan April 9, 2009.
Making Conservation Work for You Chris Brown Chris Brown Consulting for Office of Rural Community Affairs December 2, 2003.
Utility Financial Management AWWA Intermountain Section Leadership Forum Session Two November 10, 2015.
1 Public Hearing User Rate Adjustments April 8, 2008.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
Eugene Water & Electric Board Jill Hoyenga, Water Management Services Supervisor.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
Presented to the City of Dover, Delaware June 6, 2006 Revenue Requirements, Cost of Service and Rate Adjustments for the Electric Utility.
Use and Effectiveness of Municipal Water Restrictions During Drought in Colorado Bobbie Klein and Doug Kenney 2002 Drought – the Context Study Methodology.
Goal: Identify Overriding Principles and Provide Guidance to a Consultant for the Development of an Improved Rate Structure.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
RATE ANALYSIS FY FY 2019 March 6, 2014 CARSON VALLEY WATER UTILITY FUND 326 – DEPARTMENT 864.
June 17, 2015 (Regina) June 18, 2015 (Saskatoon) SaskEnergy 2015 Rate Application.
Town of Lochbuie Water 2015 Water Rate Options Presented to the Town of Lochbuie Board of Trustees Raftelis Financial Consultants, Inc. December 16, 2014.
Ladwpbnds2011a\Presentation Feb 2011\Rating Agency Deck (Both) v9 Part I.pptx CALIFORNIA MUNICIPAL RATES GROUP 2016 Spring Conference April 28-29, 2016.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Community Choice Aggregation Demonstration Project Marin County Base Case Feasibility Analyses Overview April 5, 2005.
Water and Wastewater Rates Public Hearing July 15, 2015 The Reed Group, Inc. 1.
1 City of Cocoa Michael Burton - President Andrew Burnham - Sr. Vice President Eric Grau - Project Consultant Presented by: Water, Sewer & Reclaimed Water.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
City of Fernley, Nevada – 164 th Ave. NE, Suite 300, Redmond, WA April 18, 2007 Rate Study Findings Water and Sewer Utility Rates.
Raw Water Availability in the Integrated Vaal River System Presented to:WSF Presented by:Kobie Mare Date:25 May
City of Petersburg Water and Wastewater Rates
Water Finance and Ratemaking
Water and Wastewater Rates
MOUNTAIN REGIONAL WATER
Final Rate Study Findings
City of Sisters, OR 2017 Water & Sewer Rate Study
Springfield Utility Board Proposed 5.0%
Comprehensive Rate Study & Cost Allocation Analysis
Water Cost-of-Service
City of Lebanon, Missouri Electric Department
Drought Planning Through Integrated Rate Design
Drought Rate Study Continued from May 19, 2015
Water Rates Public Hearing
Presentation transcript:

DROUGHT PRICING – LESSONS LEARNED A Presentation to 2003 RMSAWWA / RMWEA Joint Annual Conference by Kerry Kuykendoll Manager of Rate Administration Denver Water September 14, 2003

DENVER WATER BACKGROUND Denver Water provides water to approximately 1 million people. Denver Water provides water to approximately 1 million people. Customers are located both inside and outside city boundaries. Customers are located both inside and outside city boundaries. Customer groups include residential, commercial, industrial, government and wholesale. Customer groups include residential, commercial, industrial, government and wholesale. Water supply is 100% surface water. Water supply is 100% surface water. Reservoirs fill with spring runoff. Reservoirs fill with spring runoff. Snow pack is critical. Snow pack is critical.

-334 MI Distributors

DROUGHT: “I’LL KNOW IT WHEN I SEE IT.” Denver Water had revised its Drought Response Plan in July Denver Water had revised its Drought Response Plan in July The worst 100-year drought occurred This one beats it in intensity. The worst 100-year drought occurred This one beats it in intensity. Snow pack in the winter of 2001/2002 was 63% of normal. Storage was average. Snow pack in the winter of 2001/2002 was 63% of normal. Storage was average. Spring runoff was 25% of normal. Precipitation was 33% of normal. Spring runoff was 25% of normal. Precipitation was 33% of normal. Other communities started declaring drought in early spring. Denver Water did not until two months later. Other communities started declaring drought in early spring. Denver Water did not until two months later.

5/27/2003

Average = 296,000 af 2002 = 63,000 af (21% of average) Example of Mother Nature’s irregularity.

Reservoir Contents

FINANCING RESPONSE: In-Drought Concerns Utility’s Perspective Utility’s Perspective Commissioners’ Perspective Commissioners’ Perspective Customers’ Perspective Customers’ Perspective Post-Drought Concerns Financing Concerns Financing ConcernsSummary Lessons Learned Lessons Learned

FINANCING RESPONSE - UTILITY’S PERSPECTIVE Limited to no guidance available. Limited to no guidance available. Managing revenue shortfalls and reserve balances. Managing revenue shortfalls and reserve balances. Price signals – do they work? Price signals – do they work? –Price elasticity of demand. –Billing frequency. –How high is meaningful? –Can you develop a cost justification for drought pricing? Accountability – how much, from whom, how used? Accountability – how much, from whom, how used? What is feasible – billing limitations. What is feasible – billing limitations.

FINANCING RESPONSE – COMMISSIONERS’ PERSPECTIVE There is a relationship between price and demand. There is a relationship between price and demand. Control demand first and worry about fairness second, or vice versa? Control demand first and worry about fairness second, or vice versa? Accountability – not for lost revenue, used to pay for “unbudgeted” drought. Accountability – not for lost revenue, used to pay for “unbudgeted” drought. Do it now but have public input. Do it now but have public input. They hear all the individual concerns. They hear all the individual concerns.

FINANCING RESPONSE – CUSTOMERS’ PERSPECTIVE Inside Denver – Charge outside Denver – the water is ours. Inside Denver – Charge outside Denver – the water is ours. Outside Denver – Our rates are already higher than inside. Outside Denver – Our rates are already higher than inside. All – Indoor water, trees and shrubs should not be penalized. All – Indoor water, trees and shrubs should not be penalized. Some - Some - –I have 10 kids. –I am on a fixed income and like to garden. –I have an acre of land. –We provide park area to the public. –We use your water in production of our product (beer and bottled water). Bottom Line – Customers support a drought price signal but none of them personally used too much and their needs were not wasteful. It was someone else who wasted. Bottom Line – Customers support a drought price signal but none of them personally used too much and their needs were not wasteful. It was someone else who wasted.

WHAT WE DID! Originally “basket” of programs, based on restrictions, supported by surcharges and enforced by penalties. Originally “basket” of programs, based on restrictions, supported by surcharges and enforced by penalties. Then summer surcharges became a “belt and suspenders.” Then summer surcharges became a “belt and suspenders.” –Residential – 8 increasing blocks with range of 50% to 500% increase in rate. (Replaced “sissy” surcharge). –Commercial/Industrial/Government/Master Meter – 70% targets relative to –Aggregated Customers – 80% targets relative to Similar entities (e.g. Denver Parks) were combined to allow for management of the entire system.

$1.58 $2.37 $1.90 IndoorOutdoor WaterLarge Outdoor UserExcess Outdoor Use Residential Drought Surcharge Surcharge = $11.85 Total = $14.22

Summer Surcharges by Cycle

% of Customers Receiving a Surcharge 10 – 20%

Summer Surcharges by Cycle % of Customers Receiving a Surcharge 10 – 20% 20 – 40%

Summer Surcharges by Cycle % of Customers Receiving a Surcharge 10 – 20% 20 – 40%

Summer Surcharges by Cycle % of Customers Receiving a Surcharge 10 – 20% 20 – 40% 40 – 60%

Summer Surcharges by Cycle % of Customers Receiving a Surcharge 10 – 20% 20 – 40% 40 – 60% 60 – 80%

Summer Surcharges by Cycle % of Customers Receiving a Surcharge 10 – 20% 20 – 40% 40 – 60% 60 – 80% 40% 70%

Summer Surcharges by Cycle % of Customers Receiving a Surcharge 10 – 20% 20 – 40% 40 – 60% 60 – 80% 79% Highest percentage of customers Receiving a surcharge in one cycle?

Summer Surcharges by Cycle % of Customers Receiving a Surcharge 10 – 20% 20 – 40% 40 – 60% 60 – 80%

Summer Surcharges by Cycle % of Customers Receiving a Surcharge 10 – 20% 20 – 40% 40 – 60% 60 – 80%

2003 Budget Review ItemFinancialPlanBudgetEst.Actual Sources Water Sales SDCSurcharges Bond Proceeds OtherTotal $ $ Uses O&MCapital Debt Service Total $ $ Use of Cash

Post Drought: Financing Concerns Additional costs largely offset by surcharges but not completely Additional costs largely offset by surcharges but not completely A renewed awareness of water and price A renewed awareness of water and price –General opinion that it is a high value and low price product –There are questions of whether our water is under priced –Not all uses are equally elastic There is a desire to avoid the consequences of lack of supply in the future. As a result the Board: There is a desire to avoid the consequences of lack of supply in the future. As a result the Board: –Accelerated the completion of the Recycle Project –Accelerated the timing of the North End Supply Project

Accelerating Capital Projects ($ Millions) $ Plan 2004 Plan Change 1: Acceleration of Recycled Distribution System 2004 Recycle Impact 2004 North End Sol. Impact Change 2: Acceleration of North End Solution 2004 Other Means Financing More and Sooner

Accelerating Capital Costs ($ Millions) $ Plan 2004 Plan $44 $52 $68 $94 $123 $58 $32 $29$ – 10: Add $183 million : Subtract $100 million Means Financing More and Sooner

Demand Changes After A Drought East Bay MUD’s Experience 242 “Normal” 219 “Normal” 199 “Normal” -35% -18% 1961 – 1976 Average = – 1987 Average = 219 Relative to Previous Period = Down 10% Present Average = 199 Relative to Previous Period = Down 9% After each drought “EXPECTED” demand was no longer related to the past “NORMAL” demand This is not a function of restrictions but rather a fundamental change in usage

Denver Water’s Consumption Per Account Three periods of “normal” Drought Metering / Two Forks 1977 – 1990 Demand Down 4% 1990 – Present Demand Down 8% Denver Water has had similar fundamental changes in usage Thousand Gallons per Account

Revenue Forecast Issues If Consumption is at Pre-drought Levels with Existing Rates 2004 Consumption –pre-drought (thous. gallons) 87,500,000 Average 2003 Rate ($/thous. gallons) $ Revenue Without a Rate Adjustment $154,875,000 Consumption at Pre-drought Levels with PREVIOUSLY PLANNED RATE adjustments 2004 Consumption --pre-drought (thous. gallons) 87,500,000 Average 2004 Rate (3.5% Rate Increase) $ Revenue $160,125,000 Consumption is REDUCED and RATES are INCREASED MORE THAN PLANNED 2004 Consumption –Reduced 5% 83,125,000 Average 2004 Rate (5% increase) $ Revenue $154,613,000

Focus on 2004 Item Rate Increases of 5.4-percent Projected Revenue at Reduced Demand (demand reduction of 5%) ($ million) $155.0 Original Revenue Target ($ million) $160.1 Shortfall$5.1 Plan Adjustments: 2004 Inflation Reduction to 2% 2004 Inflation Reduction to 2% 2004 SDC Increase of 20-percent 2004 SDC Increase of 20-percent Unidentified 2004 Budget Reductions Unidentified 2004 Budget Reductions Total Adjustments Total Adjustments$

LESSONS LEARNED Expect controversy. Expect controversy. Don’t simply raise rates, have a surcharge. This makes it easier to be accountable. Don’t simply raise rates, have a surcharge. This makes it easier to be accountable. Surcharge may need to change with seasons. Surcharge may need to change with seasons. If you bill in blocks that are fixed, expect an outcry for individualized billing; (number of people in house and lot size will be key variables.) Also called water budgets. If you bill in blocks that are fixed, expect an outcry for individualized billing; (number of people in house and lot size will be key variables.) Also called water budgets. Understand that customers may conserve and still be assessed a surcharge. Understand that customers may conserve and still be assessed a surcharge. Come to a consensus on the issue of managing to the average vs. the individual. Come to a consensus on the issue of managing to the average vs. the individual. Pray for rain and snow. Pray for rain and snow.

QUESTIONS AND ANSWERS