Stephen Molloy RF Group ESS Accelerator Division

Slides:



Advertisements
Similar presentations
Introduction to RF for Accelerators
Advertisements

Since Therefore Since.
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Chapter 4 DC to AC Conversion (INVERTER)
Wind Turbine Session 4.
Lorentz force detuning measurements on the CEA cavity
30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
Electromagnetic Oscillations and Alternating Current
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
Power Requirements for High beta Elliptical Cavities Rihua Zeng Accelerator Division Lunds Kommun, Lund
1 ALICE rf project meeting Kai Hock, Cockcroft / Liverpool 19 May 2008.
Electronics Principles & Applications Sixth Edition Chapter 7 More About Small-Signal Amplifiers (student version) ©2003 Glencoe/McGraw-Hill Charles A.
AC Circuits III Physics 2415 Lecture 24 Michael Fowler, UVa.
Problem Solving Part 2 Resonance.
Eric Prebys, FNAL.  As you’ll show in homework, the synchrotron tune (longitudinal oscillations/turn) is generally
Alternating-Current Circuits Chapter 22. Section 22.2 AC Circuit Notation.
Antennas and Propagation
LECTURE 2. IMPEDANCE MATCHING
Alternating Current Circuits
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Room temperature RF Part 2.1: Strong beam-cavity coupling (beam loading) 30/10/2010 A.Grudiev 5 th IASLC, Villars-sur-Ollon, CH.
Impedance Matching and Tuning
Beam tolerance to RF faults & consequences on RF specifications Frédéric Bouly MAX 1 st Design Review WP1 - Task 1.2 Bruxelles, Belgium Monday, 12 th November.
RF Cavity Simulation for SPL Simulink Model for HP-SPL Extension to LINAC4 at CERN from RF Point of View Acknowledgement: CEA team, in particular O. Piquet.
LLRF Cavity Simulation for SPL
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
Travelling Wave Tube For Broadband amplifier helix TWTs (proposed by Pierce and others in 1946 ) are widely used For High average power purposes the.
W. 3rd SPL collaboration Meeting November 12, 20091/23 Wolfgang Hofle SPL LLRF simulations Feasibility and constraints for operation with more.
Anders Sunesson RF Group ESS Accelerator Division
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
RF Cavity Simulation for SPL
ECE 662 – Microwave Electronics
Double RF system at IUCF Shaoheng Wang 06/15/04. Contents 1.Introduction of Double RF System 2.Phase modulation  Single cavity case  Double cavity case.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
7-1 McGraw-Hill © 2013 The McGraw-Hill Companies, Inc. All rights reserved. Electronics Principles & Applications Eighth Edition Chapter 7 More About Small-Signal.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
F AcceleratorDivision Introduction to RF for Particle Accelerators Part 2: RF Cavities Dave McGinnis.
Frequency-domain study of acceleration & beam loading based on a circuit model by raquel fandos.
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
Sensitivity of HOM Frequency in the ESS Medium Beta Cavity Aaron Farricker.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
POWER REQUIREMENTS FOR THE LHC HARMONIC CAVITIES WITH THE FULL-DETUNING SCHEME P. Baudrenghien, T. Mastoridis, CERN BE-RF 2nd LHC Harmonic Cavity meeting,
TESLA DAMPING RING RF DEFLECTORS DESIGN F.Marcellini & D. Alesini.
Managed by UT-Battelle for the Department of Energy Vector Control Algorithm for Efficient Fan-out RF Power Distribution Yoon W. Kang SNS/ORNL Fifth CW.
LLRF Control Simulations for SPL Cavities Simulink Model for SPL Extension to LINAC4 at CERN from RF Point of View Acknowledgements: CEA team, in particular.
Operated by the Southeastern Universities Research Association for the U. S. Department of Energy Thomas Jefferson National Accelerator Facility 6 March.
20/3/2014 MEW weekly meeting Summary on high efficiency klystron design Chiara Marrelli.
Group Meeting October 15 th 2012 Lee Carver. Outline Multi-Harmonic Cavity (MHC) Design Project - Cavity Designs, Couplers, HOM analysis Electron Two.
Aaron Farricker 107/07/2014Aaron Farricker Beam Dynamics in the ESS Linac Under the Influence of Monopole and Dipole HOMs.
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
Linac RF System Design Options Y. Kang RAD/SNS/NScD/ORNL Project – X Collaboration Meeting April , 2011.
A CW Linac scheme for CLIC drive beam acceleration. Hao Zha, Alexej Grudiev 07/06/2016.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
Higher Order Modes and Beam Dynamics at ESS
Cavity Theory Feng QIU.
Physics design on Injector-1 RFQ
Outlook of future studies to reach maximum gradient and current
High Efficiency X-band Klystron Design Study
Update of CLIC accelerating structure design
Advanced Power Systems
Implications of HOMs on Beam Dynamics at ESS
Part2: Cavities and Structures
Alternating Current Circuits
Accelerator Physics Particle Acceleration
Accelerator Physics Particle Acceleration
USPAS Course on Recirculated and Energy Recovered Linear Accelerators
Presentation transcript:

Stephen Molloy RF Group ESS Accelerator Division RF Systems Design Stephen Molloy RF Group ESS Accelerator Division AD Seminarino 17/02/2012

Outline Some basic concepts Steady-state analysis Transient (Hopefully not *too* basic…) Steady-state analysis Optimising a cavity Optimising the linac Transient Filling a cavity Commissioning the machine Protecting the machine

RF System Concepts

Lumped elements: RF cavity Parallel LCR circuit, where L, C, & R, depend on geometry & material. Resonant with a certain quality factor, Q0.

Lumped elements: RF system Generator current after transformation by the coupler Transmission line impedance seen from “the other side” of the transformer. Note it is in parallel with the cavity resistance, R. Note that loaded R & Q both scale in the same way when shunted by the coupler. Therefore R/Q is unchanged. R/Q is a function of the geometry only, and so the circuit resistance, (R/Q)QL, is set by choosing the coupler loading.

Optimising a cavity for RF power Equivalent circuit allows tuning of parameters Loaded quality factor, QL Transformer ratio of the coupler Location and dimensions of coupler & conductor Frequency Inductance & capacitance Dimensions of the cavity Coupling to beam, R/Q Also the inductance & capacitance Cavity dimensions

Optimising the coupling How best to squeeze RF into the cavity? Minimise QL to speed power transfer from klystron? Maximise QL to improve efficiency of the cavity? Match voltages excited by klystron & beam Requires a specific value for QL For a specific forward power… Thus, steady state signals are equal

Tuning the frequency: Why use the wrong frequency? Vcav= Vforward + Vreflected Vbeam Ibeam φb Vforward=Vg/2 Vg= Vcav - Vbeam Vcav A non-zero synchronous phase angle will always lead to reflected power, unless…

Break the phase relationship Driving a resonator off-resonance leads to a drop in the amplitude and a rotation of the phase of the excited signal. The higher power required to achieve the same cavity field could be easily compensated by the elimination of the reflected power

Tuning the frequency: Why use the wrong frequency? Ibeam Vg ψ φb ψ Vforward Vbeam Vcav Forward voltage can be made equal to the cavity voltage  no reflected power!

Linac & cavity optimisation For a single cavity Reflected power can be eliminated Correctly choose: Detuning QL due to the coupler For a linac, it is not so simple Detuning is easy Forgetting about Lorenz detuning for the moment Coupler Prohibitively expensive to design individual couplers for each cavity So, optimise the QL for the total reflected power

An aside: Beam cavity coupling Coupling composed of 2 signals Cavity field vector (depends on position) Cavity phase (depends on time) Magic Integration by parts (twice) Cosine is an even function Sine is an odd function π phase advance per cell Five-cell cavity Magic! See ESS Tech Note: ESS/AD/0025

Discussion Velocity bandwidth may be approximated by the closest zeros of the cosine: That the optimum β is greater than β0 is a well known phenomenon. This curve agrees very well with simulation/measurement. R/Q depends on square of V. β=β0 may seem problematic as the cosine will go to zero, however the denominator also goes to zero. In this limit:

Additional spatial harmonics? 2nd term is negligible Result is the same as for 1 spatial harmonic No advantage in velocity bandwidth 12.5% improved acceleration With no increase in peak voltage!

Transit-time factor conclusions Note assumptions: Fixed cell length No significant velocity change π-mode cavity Observed voltage dependent on lots of things Cavity β, particle β, peak voltage, frequency, etc. Velocity bandwidth depends…. Only on the number of cells! Increase effective voltage: Increase number of cells Increase 1st order spatial component Add additional components to maintain reasonable peak field

Optimising the SC linac

Goals, technique, assumptions Minimise the total reflected power Vary the QL’s, and sum the reflected powers Nominal beam  50 mA, 2.8 ms Each section has a single QL Spoke, medium/high beta Each cavity detuned optimally Velocity dependence of impedance included Theoretical for elliptical cavities Spoke based on field profile from S. Bousson

Result of optimisation Note the large reflected power from the spoke cavities

Why are the spokes problematic? R/Q

Spoke reflected power Fixes: Redesign spokes for a lower beam velocity Begin spoke section at a higher beam energy Use multiple coupler designs in the spoke section

Re-optimise

Dynamic (not steady state) performace

Klystron control & linac commissioning Choose klystron current to achieve correct phase & amplitude Vg + Vbeam = Vcav Only in steady-state! Must ensure that phase & amplitude are correct at beam arrival Vforward must change phase at beam arrival Due to synchronous phase angle In addition: How much power is reflected when commissioning with low current beam?

Beam trip! In reality, LLRF would detect the incorrect cavity amplitude & phase, and the large reflected power, and act to prevent this.

Dynamic effects – work in progress Nominal beam Control klystron to achieve required RF conditions Commissioning Shorten RF pulses to match beam duration Lower peak current will cause problems QL matching done for 50 mA Preferable to run with same bunch charge Machine faults How much power can we reflect back to the loads? Klystrons tripped by MPS within a pulse?

Conclusions Steady-state analysis Transient analysis Linac optimised using 5 families of couplers Mismatches between the voltage profile and R/Q profile are simple to fix Reflected power per cavity reduced to <10 kW Transient analysis A work in progress… Reflected energy/pulse calculated for all cavities Begun investigating: Commissioning strategies Fault scenarios