XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
1 Enhancements to the Linac Coherent Light Source.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Patrick Krejcik LCLS April 7-8, 2005 Breakout Session: Controls Physics Requirements and Technology Choices for LCLS Instrumentation.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Low Emittance RF Gun Developments for PAL-XFEL
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
Machine Protection at the 1MW CEBAF Electron Accelerator and Free Electron Laser Facility Kelly Mahoney Presented at the Workshop for.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
All Experimenters Meeting PIP Report Fernanda G. Garcia on behalf of PIP team 07/01/2013.
Next Linear Collider 8-Pack Project D. Atkinson System Review, April 3 The 8-Pack Project at NLCTA An overview of the status and schedule for the project.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
Overview of NLC X-Band Technology and Applications Including a Compact XFEL Chris Adolphsen SLAC.
Sept 16-17, 2003 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Controls.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
MAX IV linac overview and scope of automation Sara Thorin.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
Heung-Sik Kang Pohang Accelerator Laboratory
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
LLRF development of SSRF RF Group and Linac Group
Areal RF Station A. Vardanyan
An X-band system for phase space linearisation on CLARA
CLEX* Status and Plans CTF3 complex CLEX
12 GHz High Power RF components requirements for CEA activities
CLIC Klystron based. Updates 2017.
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Low Level RF Status Outline LLRF controls system overview
LLRF Control System Outline Scope Requirements Design Considerations
Advanced Research Electron Accelerator Laboratory
Low Level RF Status Outline LLRF controls system overview
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
Linac LLP Outline LINAC Long Lead Procurements
Operational Experience with LCLS RF systems
Low Level RF Status Outline Overview showing hardware instances
Breakout Session SC3 – Undulator
Injector/Linac RF Status
Presentation transcript:

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch

Layout of the Undulator to Dump Beam Line

OTRDMP Simulation example - Yuantao Ding low charge 20pC soft x-rays head FEL ON FEL OFF X-ray “measurement” Current “measurement”

XTCAV Proposed Location PenetrationPenetration to B921

Conceptual sketch of the x-band structure and waveguide on the beam line.

Structure Fabrication One structure built and tested Second structure Support stand, beam line and vacuum installation ~$390k ItemShop labor Direct laborM&S Program supportIndirectsTotal Fab 2nd deflector structure$98,448$16,800$10,000$1,680$61,743$188,671 1 m

B921 and undulator tunnel elevation view showing penetration for waveguide to the XTCAV

Excerpt from the floor plan of B921 with proposed modulator and klystron locations

B921 floor space for modulator and klystron Penetration

B921 cross-section showing available elevation with respect to cable trays and ceiling

Commercially available Modulator installation housing the SLAC XL4 klystron. Much better pulse stability than SLAC modulator: 30 ppm versus 100 ppm Complete system houses klystron, magnet, oil tank and output transformer EPICS controls interface “turn-key” system purchase price ~$650k LCLS motivated to evaluate this modulator for other applications e.g. L1S Also purchased by LLNL, Trieste, CLS, CERN …

Output from the klystron goes through a mode converter to circular waveguide for lower power loss Fabrication and installation of waveguide components: including converters splitters, couplers, loads and vacuum components, all based on existing SLAC X- band designs ~$365k

LLRF Phase reference – Share the low-noise 476 MHz heliax from the linac with the beam phase monitor – Beam based feedback corrects slow drifts 476 MHz Cavity XTCAV

EPICS Controls LLRF - (next slide) Vacuum - status of new pumps, gauges and valves Profile Monitor OTRDMP - present camera is only 10 Hz (upgrade?) Feedback – orbit at BPMUE1, BPMUE2 and BPMUE3 after the XTCAV to stabilize the RF phase of cavity and keep the bunch at the zero phase crossing PPS – Modulator interlocked to Access state – Review to show existing BTMs give adequate coverage BCS – New spoiler at end of XTCAV – Review to show existing PICs give adequate coverage MPS – Set threshold of MPS BLMs lower than BCS PICs

Why PPS, BCS and MPS are important Beam at the wrong phase can be kicked by up to 10 mrad – Lowest energy beam, highest amplitude RF, phase at crest Beam leaves the beam pipe within the XTCAV already Existing safety systems have large acceptance angle.e.g. BTMs

LLRF EPICS Controls Use LCLS PADs and PACs with EPICS IOC and BSA Use either MKSU II for klystron and modulator interlocks, or Scandinova integrated controls In the linac CAMAC PDU still provides timing to the modulator via the PIOP module Consider the LLRF control system as a whole: – The XTCAV will be the first stand-alone RF station with EPICS-only controls – There are choices of platforms on which to implement EPICS Linac Phase I upgrade with EPICS driver for CAMAC Replace CAMAC modules with VME modules and EPICS timing, similar to existing EPICS architecture. Develop a new mTCA platform – Need to be able to this in < 2 years – The choice we make here will set a precedent for the LCLS-2 injector project

Cost Summary SystemEstimated Cost Including Indirects Fabrication of second XTCAV structure $126,928$188,671 Mechanical and vacuum installation$390,240 Waveguide system$365,200$564,900 Klystron and focusing magnet$492,227$690,675 Modulator and klystron tank$745,000$855,000 Electrical AC Service$115,000$168,130 Cooling systems$128,000$157,564 LLRF Drive system$271,500$334,295 LLRF controls$352,000$505,027 PPS, BCS and MPS$100,000$150,000 Profile Monitor$20,000$30,000 Total$3,106,095$4,034,502 Including 25% Contingency $5,043,128