Workstream 1: Project Management – System Configuration and Business as normal Andrew Heed Kathy Wallis 17 June 2013.

Slides:



Advertisements
Similar presentations
Steve Fuller InforMedix Marketing Research, Inc. Medical-Surgical Market Research Group April 3, 2008.
Advertisements

Burn Injury Jo Myers BSc (hons), RGN, Dip(He)RSCN Lead Nurse
Rapid Admission of Palliative Patients. Hospital Macmillan Specialist Palliative Care Nurse. Lung Cancer Specialist Palliative Care Nurse. September 2008.
1 e-Discharge Summary Mark Pepperrell, Principal Pharmacist Nilesh Patel, eRecords Project Analyst.
Safer Wards, Safe Hospitals Technology Fund A successful bid approach Christine Walters Director of IM&T, The Pennine Acute Hospitals NHS Trust.
Effective Integration of HIPAA Information Security with Privacy Compliance Richard B. Boyer, Privacy Officer Jody S. Hawkins, Information Security Officer.
How do you get nursing staff involved?
EPMA: Approaches to Training
Medication Reconciliation
EPrescribing Project ePrescribing Policy Summary May 2012.
EPMA electronic Prescribing and Medicines Administration ePMA Update April 2014.
EReconciliation A Tasmanian Perspective Rory Gilmour Nov 2014 Department of Health and Human Services.
PPCI – National Update NCBC Workshop Jim McLenachan, National Clinical Lead for PPCI, NHS Improvement, England. London, 24 th November, NCBC Annual.
Consultation on changes to hospital services in North Kirklees and Wakefield District Dewsbury public meeting – 21st May 2013.
Safe and Effective Prescribing 2014 Pharmacy Department.
Protecting patients- now and in the future Linda Matthew Senior Pharmacist National Patient Safety Agency.
Developing a Trust wide framework to support Nurse Facilitated Discharge to reduce length of stay Kate Pound and Sue Haines Service Redesign Manager Assistant.
23 hour surgery Beth Jackson Senior Clinical Nurse Specialist Breast Unit The Royal Marsden Hospital NHS Foundation Trust.
Medication Reconciliation Networking Session Steve Rough, MS., RPh. Director of Pharmacy University of Wisconsin Hospital and Clinics.
Oxford Radcliffe NHS Trust
Some unanticipated consequences of the implementation of a hospital IT system: learning from a case study Sabi Redwood Joel Minion Mary Dixon-Woods Anna.
The Royal Wolverhampton Hospitals NHS Trust Induction ELECTRONIC DISCHARGE NOTIFICATION Presented by: IT System Trainer.
Medication Safety Standard 4 Part 3 – Documentation of Patient Information, Continuity of Medication Management Margaret Duguid, Pharmaceutical Advisor.
EPMA electronic Prescribing and Medicines Administration ePMA Testing June 2014.
Winter Planning in Dumfries and Galloway. CHP involvement Dumfries and Galloway has single CHP covering acute, community and mental health settings Historically.
Discharge planning – reducing admissions/re- admissions Jo Clarke, CPPE tutor 1.
Infusion Management Implementation
Solution Overview for NIPDEC- CDAP July 15, 2005.
Service 19 TH JUNE 2014 /// SEPTEMBER 4, 2015 ALISON CLEMENTS.
‘How statistics are being used to impact on service delivery’ Rory Farrelly Director of Nursing NHS Greater Glasgow and Clyde Scottish Government Annual.
EMedicines Administration: Practical Implications Chris Fokke RGN, BA Hons, MSc. IT Chief Clinical Information Officer Hampshire Hospitals NHS Foundation.
Benefits of the Hampshire Health Record Hugh Sanderson Clinical Lead HHR.
Medication Reconciliation in the Medical Floor A Patient Safety Quality Improvement Initiative Medication reconciliation is defined as a formal process.
 Definitions  Goals of automation in pharmacy  Advantages/disadvantages of automation  Application of automation to the medication use process  Clinical.
IMPLEMENTING GUIDELINES AND REDUCING PATIENT RISK OF VENOUS THROMBOEMBOLISM IN A LARGE UK TEACHING HOSPITAL Sharron Millen, Head of Clinical Pharmacy and.
IMPLEMENTING EPMA Experience at Kings College Hospital
A Regional Approach to Improvement Julie Branter Associate Director for Clinical Governance and Patient Safety 21 September 2010 South West Strategic Health.
Hospital Pharmacy In Canada Report 2013/14 Kevin Hall and Jean-Francois Bussieres Future Trends In Hospital Pharmacy Practice.
Standard 4: Medication Safety Advice Centre Network Meeting Margaret Duguid Pharmaceutical Advisor February 2013.
Hospital Operational Standards Jennie Hall, Chief Nurse Dr Ros Given-Wilson, Medical Director Martin Wilson, Director of Delivery and Improvement.
The Impact of EPMA on Day to Day Working for Clinical Staff
Electronic prescribing in mental health Peter Pratt Chief Pharmacist Sheffield health & social care NHS FT Trust
Implementing Iatrics PDI for Medication Reconciliation July Veronica Breadner RN Marie Descent BSc.Phm., RPh.
Northern Ireland Electronic Care Record #NIECR #NIPECICT13 Innovation + Commitment = Transformation NIPEC Annual Conference Gary Loughran Nicky Brown Margaret.
Auditing an evolving Pre-operative Assessment Service : Completing the cycle Paul Knight, Consultant Anaesthetist Joanna Gordon, ST3 Anaesthetics.
HIMSS at Croydon Health Services Charlie Stockman. Clinical Nurse Lead for Informatics Tony Newman-Sanders. CCIO.
Newcastle upon Tyne Hospitals NHS Foundation Trust Audit results for NAOG meeting 19 April 2013 The Newcastle upon Tyne Hospitals NHS Foundation Trust.
Implementing a 24 hour telephone triage system for Haematology patients following chemotherapy and bone marrow transplant. Presented by: Paul Hickey.
St Mary’s patient pathway project Stephan Brusch – Service Development Manager Westminster PCT Mark Sheen - Community Nurse Specialist Kensington and Chelsea.
Grantham Children’s Services A Problem or an Opportunity?
A Hospital without a Pharmacy - building a first class pharmacy service Anne Cope Associate Director of Pharmacy University Hospital Birmingham NHS Foundation.
EPMA - Benefits Realisation at Harrogate Paul Golightly Acting ePMA Lead Pharmacist Harrogate District NHS Foundation Trust.
Introducing ePMA into a Paediatric ITU Will Hall - Lead Pharmacist for ePMA.
EPR – A work in progress. Advances in medical science have revolutionised how we treat illness. Today we can cure illnesses that previously would have.
Agenda BupaPrivate and Confidential Implementing a training and accreditation scheme for TTA pre-pack dispensing R Betmouni, N Gillani Pharmacy Department,
EPMA- Learning from Serious Incidents STAT dosing Iain Davidson Chief Pharmacist Feb 16.
Methotrexate Never Event Presentation Date November 2015 Christine Dodd Medication Safety Pharmacist Martin Shepherd Medicines Information & Clinical Economy.
 Friends and Family Test (FFT) -single question ‘would you recommend…’  The Adult National Inpatient Survey (AIPS) - AIPS uses validated questions based.
Andrew Batchelder Specialty Registrar in Surgery & NIHR Academic Clinical Fellow in Medical Education University Hospitals of Leicester NHS Trust Using.
GB.DRO f, date of preparation: January 2010 Dartford and Gravesham NHS Trust Pharmacy Services in Hospital.
The National Programme for Information Technology Patrick McGahon – Director of Service and Commercial Development University Hospitals of Morecambe Bay.
Dr. Andrew Foulkes Medical Director Surrey and Sussex Area Team Clinical Senate Summit A&E, Acute Medicine and the Medical Specialties.
E-Prescriptions Krishi. E-Prescriptions Overview One major contributor to PAEs is patient medication errors, and the implementation of e-prescription.
Audit Opioid use in palliative patients on general hospital wards
Outpatients.
2.13 Copyright UKCS #
Closing the loop EPR-PHARMACY INTERFACE Bhulesh Vadher
Reducing Medication Errors with ePMA: 7 Years Experience
Claire Vaughan- Head of Medicines Optimisation, Salford CCG
Insulin safety – shared learning
Presentation transcript:

Workstream 1: Project Management – System Configuration and Business as normal Andrew Heed Kathy Wallis 17 June 2013

Agenda Some background to us – Trust and ePrescribing Project Workshop structure –Pre-Go Live planning –Roll-out considerations –Maintenance and Support Any questions??

University Hospital Southampton 1100 beds Provides services for 1.3M people in Southampton and south Hampshire specialist services such as neurosciences, cardiac services and children's intensive care to more than 3 million people in central southern England and the Channel Islands major centre for teaching and research in association with the University of Southampton and partners including the Medical Research Council and Wellcome Trust treat around 140,000 inpatients and day patients, including about 50,000 emergency admissions

Project timeline

Newcastle upon Tyne Hospitals Freeman Hospital Transplantation, Cancer Centre, Cardiothoracic Surgery, ENT, Vascular…… Royal Victoria Infirmary Neurosciences, Emergency care, Children’s Services, Plastic Surgery, Ophthalmology, Dermatology, Maternity Beds – 1792 (Inpatient) & 205 (Day case) Activity –Inpatients – 192,000 –Outpatients – 870,000 –Lab/ Rad requests – 3 million –ePrescriptions – 1.7 million –eAdministration – 7.2 million

ePx Project Cerner Millennium system –ePx, electronic orders, A+E, Theatre scheduling, PAS, documentation. Project timelines: –Work started April 2008 –Go-live November 2009 –Adult In-patient rollout completed March 2011 –Paediatric ward Feb 2013 (ongoing) –Starting 2 nd system upgrade. –Documentation ongoing. –Never-ending story

Workshop Session 1 Pre-Go Live Planning Design Considerations Testing Hardware Roll-out plan Training ….

Workshop Session 1 Feedback / Discussion

Design Considerations The drug catalogue –VTM, AMP, AMPP Terminology –Routes, forms, frequencies. Decision support. –Dosing sentences. –Alerts (interaction / dose checking / allergy others) –Order sets Future -proofing

Scope What can you actually do? –System limitations –Do you need documentation Where can you do it? –Other systems? What can you afford / support.

Hardware Can you ever have enough? What kind? Dispensing trolley? Security / cleanliness / durability. People will have better hardware at home –Or even in their pocket. –But what can an App actually do?

Training Who to train? When to train? What to train on? How many people? How to get bums on seats? What about the night shift? Who will do this in the long term? Should we even bother?

Workshop Session 2 Roll-Out Considerations Support Mixed Media Prescribing Bank and Agency Staff Real time PAS / ADT issues ….

Workshop Session 2 Feedback / Discussion

Roll Out planning Start upstream or downstream? Time between wards go lives – transfer of patients and outliers Dual systems – paper and electronic

Roll Out planning Big Bang vs staggered rollout. –What can you support? Staggered: –Arranged by directorate, patient flow –How does geography affect things –What is your transfer mechanism –Is it realistic –Too fast or too slow.

Dedicated ePrescribing support 24/7 ePrescribing team manager (Pharmacist) plus 5 full-time team members (Nurses or Pharmacy Technicians) On-site 24 hour support for 7 days post go live; otherwise 0730 – 2300 on site and on-call over night Used extra support for Theatres when surgical wards first went live (anaesthetists and recovery staff) Bank staff to support staff shortages Moving to be able to provide less on-site support over weekends Key success area for the project: awarded ‘Hospital Heroes’ team prize of Education and Support

Agency nurses and locum doctor access Use NHS professionals and multiple other agencies High agency usage – wards could not operate if agency staff not able to use the system Agreed process where agency nurses (and locum doctors) access and complete training before starting their first shift Agencies responsible for completing System Access Forms Built into the performance metrics for the agencies Difficult for first few wards, but easier as more wards are live

Real-time ADT Was an on-going issue for the Trust to have a accurate electronic bed-state – not a clinical task With ePrescribing: –Patient must be admitted to be able to administer medications (can prescribe if pre-admitted) –If patient not admitted or transferred to the correct ward, they do not appear on the list of patients due medication –If patient not discharged, they will continue to appear on list of patients due medications – each ward needs to clear all non-administered medications overnight to be able to administer medications the next day Nursing staff now complete ADT when ward clerk not on duty (also have a central ADT team to support) ADT available on the drug trolleys – therefore can complete transfers etc ‘on the fly’ Also supports the use of other systems (e.g. Doctors Worklist; Bed Management tools

Workshop Session 3 Maintenance and Support Responding to incidents Handling prescription errors On-going maintenance of the system Training Managing Expectations Reporting Data for audit Upgrades Downtime

Workshop Session 3 Feedback / Discussion

Responding to Incidents We now have something to blame! Who does this now? Who does this after go-live? System fault? or user fault? But what is the system? –software, user, computer, Wi-Fi, power cable, the workmen digging the road up 3 miles away? Trend monitoring. Feedback to users / training central team or department.

Consultant review of the drug chart / Drug Chart Viewer surgical consultant ward rounds anaesthetist review pre procedure (Demo)

On-going modification of build Link to stock control system limits naming of prescribable items: –Inclusion of strength and formulation Modification of existing protocols – general prescribing practice is more open Increasing list of protocols – standardise care and ease of prescribing

On-going maintenance Everything goes through the system –New policies –Clinical trials –Who designs or build this –Can the system / team become a bottleneck? How do we handle changes to the system? –En masse change vs drip feed. –How does the system handle change? –Change control Do we need a down-time.

Future Proofing Try to plan for every area you will be going to….. Or you potentially have a large rebuild / renaming process Try to take the long view and avoid short cuts. ???

Benefits: Error rates

Benefits: Drug Round times Drug Round pre / post eprescribing Avg time / patient (Mins) Avg difference (mins / patient Ward 1Ward 2Ward 3Ward 4Ward 5Ward 6Ward 7Ward 8 am pre post lunch pre post Eve pre post Night pre post

Questions?