1 Camden Cycling Campaign, February 2014 Clerkenwell Boulevard Bloomsbury Way -Theobalds Road - Clerkenwell Road - Old Street roundabout for Camden officers.

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
1 Camden Cycling Campaign, February 2014 Cycle segregated junctions Transport Liaison Public Meeting Wednesday 19 February 2014 Jean Dollimore Coordinator.
Transport, Access and Safety Trevor Mason Safe and Sustainable Journeys Manager.
London's superhighways and the 'Go Dutch' Campaign Gerhard Weiss Cycling Development Officer London Cycling Campaign Over 11,500 paid up members About.
Redwood Road & 35th Avenue Traffic Study. Problems Observed: High collision rate along the corridor was found at McArthur Boulevard intersection, with.
Making Our Roads Safer Blackburn with Darwen Good Health Fund
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
OVERVIEW AND SCRUTINY COMMITTEE SCRUTINY OF 20MPH SPEED LIMITS Rupert Thacker Team Leader – Forward Planning and Rail Liaison.
Traffic Signal Warrants
Strategic Cycle Routes in Portsmouth Jon Spencer CTC Right-to-Ride Representative Portsmouth 19 th November 2009.
Re-timing Deliveries Consortium Quiet Cities Global Summit Natalie Chapman, Freight Transport Association 26 November 2014.
Cycle Skills Network Audit Mark Strong Managing Consultant Transport Initiatives LLP 145 Islingword Road Brighton BN2 9SH
Brighton & Hove Least car dependant city (outside of London) Cllr Ian Davey Deputy Leader & Transport Committee Chair September 2013.
Implementing SAFE Junctions for walkers and cyclists without delaying drivers or cyclists or walkers LCC / JRG Oct’14.
A Brief Comparison on Traffic System Between London and Shanghai Allen Liu, Shanghai Feb. 16 th 2012.
Welcome to London Head of Delivery Planning, TfL Lilli Matson.
SafeZone Martin Baker Road Safety Team Leader Poole Borough Council Kevin Jones UK Product Sales Manager Siemens.
| Road Safety at the heart of cycling promotion: Examples from Europe Paul Curtis Polis THE PEP Workshop: Green and Health-Friendly Sustainable Mobility.
Toronto: Gardiner Expressway Study Paramics 2009 UGM: Newark October 5, 2009.
VISSIM and Mn/DOT’s INTERSECTION CONTROL EVALUATION (ICE) VISSIM USER’S GROUP MEETING MAY 15-16, 2008 Philadelphia Dennis Eyler, P.E., P.T.O.E. Vice President.
Cycling Scotland Revamping Cycle Guidelines Photo by Patrick Lingwood Cycling Scotland Revamping Cycle Design Guidelines with New Innovations.
ITS and Hackney Understanding the User; ITS and Hackney: Cycle Hackney app- Your phone builds better routes Moving Session A:1 Understanding the user:
Sustainable mobility in Lviv mobility.lviv.ua. Sustainable mobility – any type of transportation that can help reduce environmental impact. This may include.
Congestion Charging London
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
59 ½ Southwark Street London SE1 0AL (UK) ++44 (0) / Land Use Planning and Mobility Management Securing travel.
Roads & Traffic Department College Green Public Transport Priority measure.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Southall Traffic Congestion and Parking Provision Specialist Scrutiny Panel 21 November 2006 Transport Planning for Southall.
16 October London Borough of Merton Transport Liaison Robert Pontin.
Oxfordshire County Council has exciting plans to transform the centre of Oxford’s transport and pedestrian experience.
Lecture 6: Stop Sign Control & Signalized intersections & Design LOS Explain there is hierarchy of intersection control Use the warrants for 2-way stop.
Strategic Cycle Routes in Portsmouth Jon Spencer CTC Right-to-Ride Representative Portsmouth 14 th April 2010.
Assen town square today: completely redesigned to favour pedestrians and cyclists: traffic and parked cars removed.
WEBINAR Cycle Transport Improvements in Monza Simonetta Vittoria Monza Site Manager.
Southwark Cycling proposals TRRA Discussion Meeting SCST Pavilion 18 April 2015.
Improving Streets and Public Spaces In SE15 Presentation by Southwark Living Streets to Nunhead & Peckham Rye Community Council 8th November 2010 Presentation.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
Elliot Road Extension design critique and recommendations Petition to the Town of Chapel Hill Bicycle and Pedestrian Advisory Board March 25, 2014 Geoffrey.
Transport Committee Leading the way Travelling with a sensory impairment in London.
Delivery and Servicing Plans Central London FQP 16 th February 2011 Ian Wainwright – Freight Policy Officer Better Routes and Places Transport for London.
Commission on Improving the Delivery of Transport and Pedestrian Infrastructure  Dealing with Traffic Growth &  Considering the needs of all Road Users.
Huston, Texas | June Jing Zhang, AICP, PTP, LCI, LEED AP ND AccommodatingCyclists in Accommodating Cyclists in Highway Maintenance Projects -- an.
Nixon Road Corridor Study: Findings & Options
Implementing SAFE Junctions for walkers and cyclists
Place Standard How Good is Our Place?
Peckham & Nunhead Community Council: Important Issues For Pedestrians
The I-465 West Leg Reconstruction Project
Dartmouth Road Public Realm Enhancements – Preliminary Design
Bristol’s 20 mph experience Peter Mann Service Director, Transport
Milton Road LLF Design Engagement Paul van de Bulk 12 September 2017.
North Lamar Boulevard Project
Sources of Road Danger and a Vision Zero approach
Freight Logistics Expo
Technical and Public Advisory Committee Meeting #3
A Vision For Camberwell – Improving Streets and Public Spaces In SE5
Place Standard How Good is Our Place?
FM 518 By-pass Traffic Review
City Connect 2 LEEDS CITY CENTRE IMPROVEMENT JOHN WHITE – PROJECT LEAD
Eliminating Left & Right Secondary X-roads where only 2 lanes possible without delaying traffic , nor cycles , nor pedestrians LCC July’15.
Data led road safety enforcement
City of Wilmington Bike Plan Update
Engineered Scoring System for Bicycle Lane Mapping Development Pedro Zavagna, Mena Souliman  The University of Texas at Tyler, Departments of Civil Engineering.
E+C December 2013 version from TfL Peninsular3t.pdf NKR – New Kent rd
Low Traffic Neighbourhoods
Glossary of regularly used cycling terms
Cambourne to Cambridge Better Bus Journeys: On Road Option
Presentation transcript:

1 Camden Cycling Campaign, February 2014 Clerkenwell Boulevard Bloomsbury Way -Theobalds Road - Clerkenwell Road - Old Street roundabout for Camden officers Tuesday 18 February 2014 Jean Dollimore Coordinator Camden Cycling Campaign

2 Camden Cycling Campaign, February 2014 Position in the CLCG it is part of the east-west route network – alignments supported by both Camden and Islington

3 Camden Cycling Campaign, February 2014 Origins and support a Bicycle Boulevard from Shoreditch to Fitzrovia. – Andrea Casalotti, on CycleScape Nov From TfL CLCG consultation Dec 2013 –... one of the most heavily-cycled routes in London... busy with other traffic.. no quiet side-street alternative. Segregation will be difficult... narrow road... bus stops – The councils (Camden, Islington) and TfL will study how cycle facilities can be safely implemented... address the impacts of traffic. No options have been ruled in or out

4 Camden Cycling Campaign, February 2014 Characteristics - cyclists numbers Cyclist ’ s share of flows: AM WB peak: » 64% Theobalds » 59% Clerk ’ well(W) » 49% Old Street PM EB peak: » 53% Theobalds » 50% Clerk ’ well » 46% Old Street

5 Camden Cycling Campaign, February 2014 Characteristics - casualties Data collected by Sam Longman (6 years to 2013) – Fatalities at the Southampton Row junction 2008, 9 and 2013 plus two in the Islington section in 2007 and – Serious in 2012: 6 in Camden and 2 in Islington parts

6 Camden Cycling Campaign, February 2014 Characteristics - conditions The motor traffic is a blight on the area – it must be removed to make way for a cycle priority route and improve the area – a route is only 'quiet' enough for cycles and motor traffic to mix if motor traffic volumes are less than 2000 PCUs per day and actual speeds below 20mph

7 Camden Cycling Campaign, February 2014 Characteristics - motor flows Motor flow >> 2000 PCUs per day – it must be reduced below that level for sharing the road Buses alone: – Theobalds Road buses are too numerous for sharing the road – Bloomsbury Way has even more routes than Theobalds Road the excess EB routes need to be relocated onto the roads where the WB ones run From April 2013 cycling census

8 Camden Cycling Campaign, February 2014 Characteristics - road widths

9 Camden Cycling Campaign, February 2014 Fitting things in...

10 Camden Cycling Campaign, February 2014 Opportunities After allocating road space for buses, cycles, local access and delivery Space will be left for: – bus stops – and for important “ extras ”, e.g. seating, tables plants, trees We can do much more than just remove the blight of motor traffic and make space for cycling...

11 Camden Cycling Campaign, February 2014 The challenges Filtering out through motor traffic to a level where there is room in the road for cycling Doing major junction improvements e.g. – Southampton Row and Grays Inn Road (in Camden) Deciding how best to use the space gained from traffic reduction Dealing with bus stops, buses and passengers Making a consistent “ boulevard ” from end to end

12 Camden Cycling Campaign, February 2014 Two boroughs, one boulevard CCC and ICAG would like to see a single design team – e.g. we hear Islington has started a study of filtering whereas the entire route needs to be studied as one – in the later stages this will be even more essential – to get a consistent look and functionality throughout as in Royal College Street – and to grasp all possible opportunities for inserting “ extras ” in an interesting way