University of Southampton Science Park

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

Millets Farm Centre T240 Big Hanna provided by Susteco AB Introduction Millets Farm Centre is a restaurant, farm shop, conference centre and garden centre.
FOOD WASTE Food Waste from Kitchen & Canteen Food Waste is placed into 25ltr Caddy. The liner within the caddy is then placed into 240ltr Eurocart ready.
Background Case Study page 1 forward London Borough of Enfield: Flats as part of a commercial building Recycling and waste collection arrangements for.
The Remeha µ-chp based on a combi boiler with stirling engine Ir. P.Gelderloos Ing. M.J.Bijkerk.
Dartington Primary School Ridan Introduction Dartington C of E Primary School in Devon has approximately 340 pupils from ages A grant provided by.
The SunAirCool Eco Power Station
Background Case Study page 1 forward City of London: Door to door collections of food and dry recycling from flats Recycling collection arrangements for.
Oregon’s Methane Project - Experience and Potential Mike Gamroth Oregon State University Dept. of Animal Sciences.
Biogas typically refers to a gas produced by the biological breakdown of organic matter in the absence of oxygen. Biogas is comprised primarily of methane.
Food waste collections: Research and evidence Chris Mills Programme Area Manager- Food Waste Collections.
CARBERY MILK PRODUCTS BALLINEEN Co. Cork Energy Saving Programme Application of “Pinch” Technology.
Installation of New CHP system at the Old Aberdeen Campus.
Please call the office for a quote One-stop-shop Hazardous Waste disposal Clinical Waste disposal Confidential Waste disposal Effluent/Bulk.
Food & Beverage Sector Group Enterprising Manukau Sustainable Management Fund Food & Beverage Sector Organic Waste Project.
INTEGRATED RECYCLING AND RENEWABLE ENERGY SERVICES PDM GROUP Suzanne McDermott Commercial Team Leader.
Waste Management (Food Waste) Regulations 2009
G LASGOW R EGIONAL L ANDFILL M ETHANE R ECOVERY TO E LECTRIFICATION P ROJECT GOVERNOR’S ENERGY CONFERENCE By Mayor Rhonda Riherd Trautman.
University of Bradford A700/A900 Rocket supplied by Tidy Planet Introduction The University of Bradford is situated close to the city centre on a 32 hectare.
Anaerobic Digestion (AD) A sustainable energy production and waste management solution for your business Robert Crow 30 September 2014.
Her Majesty’s Prisons In-vessel composter Introduction In-vessel composters (IVCs) are installed in nearly 50 out of 120 of Her Majesty’s prisons. The.
Dallas Water Utilities Southside Wastewater Treatment Plant Cogeneration and Co-Digestion Projects May 9, 2011 Turning Waste Into Energy.
Eriska Hotel Jora JK5100 automated composter supplied by Joraform Introduction The Eriska Hotel is a luxurious 25 bedroom 5 Star hotel located on a 300.
THE CONTEXT OF LOGISTICS. Cycle of Supply and Demand Customers Other Inputs Other Outputs Operations Demand for Products Supply of Products passed to.
ISA April 23rd, Reducing Site Energy Costs with Combined Heat and Power Generation.
The Potential for CHP in the Northeast Provided by the Industrial Energy Consumers Group, 1/18/07 Source: Energy and Environmental Analysis, Inc.
1 of 15 Elisabeth v. Münch – UNESCO-IHE Institute for Water Education Heinz-Peter Mang – CAAE-IEEP Georg Schultes – Waldmichelbacher Hof Arne Panesar -
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
DEPT OF ESTATES AND FACILITIES Engineering Team DEPT OF ESTATES AND FACILITIES Engineering Team Too hot, too cold, just right Presented by: Russell Smith.
This project has been assisted by the New South Wales Government through its Energy Efficiency Training Program Prepared by Energy Efficiency through Product.
TRP Chapter Chapter 4.2 Waste minimisation.
Background Case Study page 1 forward City and County of Swansea: Recycling and food collections for flats Collection arrangements for dry recycling and.
Emerald Biogas Ltd the North East’s first commercial food waste anaerobic digestion facility.
Housing 21 Green Johanna provided by Great Green Systems Introduction Housing 21 is a provider of care, health and housing for older people. The composter.
This project has been assisted by the New South Wales Government through its Energy Efficiency Training Program Prepared by Energy Efficiency through Product.
The role of waste management and energy from waste in a circular economy- SITA UK’s proposed Severnside development Sept 2009 Stuart Hayward-Higham.
1 CHP – The Concept Presented At: Methane Recovery from Farm & Food Processing Waste Peru, Indiana June 6 th, 2006 Presented By: John Cuttica Midwest CHP.
Charities Buying Group The Charities Buying is operated by CBG Buying Limited Back Office Services Working together to reduce cost.
Croft Castle Biomass From Harvest to Heat Chatsworth House - 8 th July 2015 Presented by Ed Wood.
Converting Dairy Manure into Energy. An introduction to anaerobic digestion of farm waste Stefan Grimberg Associate Professor Dept. Civil Environ. Eng.
Bill Davidson Dorset Waste Partnership (DWP) Councils Working Together The Service.
Cutting costs and carbon with fuel cell CHP Edinburgh Napier University Merchiston Campus 23 rd February 2015.
Pearse Buckley Sustainable Energy Ireland Energy from Waste.
Anaerobic Digestion – a demonstration programme under the Environmental Transformation Fund 3 rd and 4 th September 2008.
Energy Options for the Farm: An Overview How farmers can increase revenues with energy options.
HYDRO POWER PLANT
HMP Guys Marsh Bioplex Anaerobic Digestion Plant.
‹#› of [total number of slides] This project has received funding from the European Union’s Horizon 2020 research and innovation programme.
Alaska Municipal League 59th Annual Local Government Conference The Programs of the Alaska Energy Authority Energy and Empowerment for Your Communities.
Cotswold Renewable Seminar 2010 Owen Yeatman. BIOGAS-NORD UK.
Jandakot Bioenergy Plant Commercially-viable bioenergy from foodwaste: an Australian success story at Richgro Garden Products November 2015 Joseph Oliver.
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Welcome. Wind Turbines & Solar Farm Update Nationally: What the Government are saying Eric Pickles issued new guidelines stating that local communities.
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
CHP Project Costs Screening Public Utility Commission of Ohio Public Utility Commission of Ohio Combined Heat and Power: Financial.
Yolo County Planning, Resources and Public Works Department 1 Landfill-based Anaerobic Digestion Compost Pilot project at Yolo County Central Landfill.
Estimate your waste costsTalk to your teamMeasure your wasteInvolve your managers Introduction TAKING ACTION ON WASTE; THE BUSINESS CASE FOR HOSPITALITY.
© Clearfleau Advances in Smaller Scale, On-site Anaerobic Digestion - For The Food Industry Dundee - 4 th August
Biofuels Event, Dundee – 04 th September 2013 Industrial & Community AD in Scotland Alison McKinnie Project manager, Organics.
Driving down the Cost of Motoring Robert Wiseman Energy Saving Trust Fenland Supply Chain Network: Transport and Responsible Purchasing 15 th October 2010.
Content 1.The main flowchart and technology 2.Advantage and disadvantages of each technology, way to improve. On-Nuch disposal site Group Member: Lu Li.
Biological Wastes Overview The NewVista food system is full-cycle. Farming and daily living create biological "wastes," which are valuable.
Main Presentation Title
Hierarchy to Reduce Food Waste and Grow Community
Victor Valley Water Reclamation Authority Biogas to Energy Project with Omnivore™ Digester Demonstration May 30th, 2013.
WHY ENERGY FROM WASTE? Industry Perspective SEI Perspective
to study potential renewable energy projects
Finding value from waste: Innovating for a circular economy
Commercial Use of Biomass for Generating Electricity in a Small Village Reun Rina.
AD at the centre of the energy and food waste nexus
Presentation transcript:

University of Southampton Science Park Flexibuster Anaerobic Digester supplied by SEaB Energy Introduction This facility operates as a treatment hub serving several organisations. It is a example of a technology that would potentially be suitable for the on-site treatment of organic waste arising from a large hotel or hospital. Southampton University Science Park houses more than 50 companies (900 regular staff members) in 45 acres of landscaped grounds and adjoins the village of Chilworth on the outskirts of Southampton. The Anaerobic Digestion unit is SEaB Energy’s main demonstration facility and accepts organic wastes from a number of local organisations. Businesses at the science park are provided with food waste caddies which are left outside the unit when ready for disposal. A similar arrangement is in place for residents of Chilworth who can use the facility free of charge as long as they deliver waste to the unit. Food waste is also provided by the nearby Chilworth Manor Hotel and The Chilworth Arms public house. Nature and quantity of waste treated on site The Flexibuster treats food waste including cooked and uncooked meat/fish plus grass cuttings from the estate grounds. The majority of the waste collected was previously sent to landfill. Approximately 2.5 – 3.5 tonnes of organic waste is treated per week. Key features Size: 12 x 2.44 x 2.8 m (pasteurisation tanks and digester), 6 x 2.44 x 2.8 m (biogas storage) and Small CHP unit Spatial requirements: Area to contain above with 1m exclusion zone on all sides. Capacity: 350 – 500 kg food waste per day Energy/ Water requirements: 5-10% of output electricity is needed for parasitic load, 60-70% of output heat and ~22m3 grey water/year is used in the process Housing: On hard standing (non-porous) with fencing to form 1m exclusion zone Maintenance: Annual servicing / general maintenance of AD unit and CHP unit Output: Fertiliser, Mulch and biogas generated in 15 days. Biogas burnt to produce heat and power. “We are delighted to work in partnership with SEaB Energy and to reaffirm our commitment to providing the benefit of innovative green technology to tenants” Peter Burkett, Chief Executive, Southampton Science Park SEaB ‘Flexibuster’ MB400AD in Container

How food is separated for treatment University of Southampton Science Park: Flexibuster AD Lessons Learnt Filtration has been installed for the hopper to reduce the smell from input waste; pasteurisation tanks were initially larger than required and have been reduced to match feedstock input; the smallest suitable Combined Heat and Power (CHP) unit was around twice the size needed for this scale of facility, so it only operates ~50% of the time and gas storage is required when CHP not running, heat and electricity output are therefore not continuous. How food is separated for treatment Food waste is delivered in food caddies from local residents and science park businesses. Larger bins are provided by the local hotel and pub. Grass cuttings are collected by grounds maintenance staff and delivered to the unit. The waste is inputted into the facility daily. Food and grass waste is added together, however there is no need to mix or ratio the different wastes. 10 minutes is required for the daily feeding process. Use of outputs from treatment The digestate is used on the science park grounds, with potential to use as fertiliser at a nearby turf growers. Biogas is produced (reported to be between 70-78% methane consistently) and burnt using a 8kW CHP unit to produce 70MWh/annum electricty and 140 MWh/annum heat. Electricity from CHP unit is exported to office developments at the science park. 5 – 10% of electricity is used to operate the unit. Excess heat from CHP unit is intended to be exported to neighbouring greenhouse (c. 10 meters away) and 60% utilised by the process. How the on-site treatment system is managed Approximately 728 hours staff time per year is required to run the digester (~2 hours a day) on-site. Off site support and monitoring is provided by SEaB. Grounds maintenance staff who collect grass cuttings also operate the facility. The waste is fed into a hopper, passed through 2 pasteurisation tanks and a digester tank before the resulting biogas is stored and utilised in a Combined Heat and Power (CHP) Engine every other day. Waste is digested in 15 days and turned into digestate and methane. External assistance is available from SEaB if required and initial training is provided for the operators. No significant health and safety concerns have arisen. Costs Installation and start-up costs for the Flexibuster start at £115,000. A leasing arrangement is available, which includes maintenance and support, for £6,500 per annum for this scale of facility. A significant cost saving is realised from displaced energy costs. Labour costs for the operation of the unit are estimated to be roughly £20/day (2 hours in total for feeding, cleaning and general maintenance). Savings are currently estimated at £150/tonne based on displacement of disposal costs. The production of digestate/fertiliser is seen as a perk rather than a replaced product purchase. Payback period for the digesters is reported to be between 2 and 6 years dependent on waste compositions, existing energy bills, existing waste disposal costs etc.

www.wrap.org.uk/on_site_treatment Waste & Resources Action Programme This case study is part of a series of case studies focussing on the on-site treatment of organic waste. Other case studies in this series are: Eriska Hotel; Housing 21; Millets Farm Centre; Dartington Primary school; University of Bradford; and Her Majesty’s Prison Service www.wrap.org.uk/on_site_treatment While steps have been taken to ensure its accuracy, WRAP cannot accept responsibility or be held liable to any person for any loss or damage arising out of or in connection with this information being inaccurate, incomplete or misleading. This material is copyrighted. It may be reproduced free of charge subject to the material being accurate and not used in a misleading context. The source of the material must be identified and the copyright status acknowledged. This material must not be used to endorse or used to suggest WRAP’s endorsement of a commercial product or service. For more detail, please refer to our Terms & Conditions on our website - www.wrap.org.uk Waste & Resources Action Programme The Old Academy 21 Horse Fair Banbury, Oxon OX16 OAH Tel: 01295 819 900 Fax: 01295 819 911 E-mail info@wrap.org.uk Helpline freephone 0808 100 2040 www.wrap.org.uk