National Aeronautics and Space Administration Goddard Space Flight Center Greenbelt, MD Information contained in this document may be subject to U.S. export.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

Rosetta Magnetic Field PDS Review B. J. Anderson.
Lorentz force detuning measurements on the CEA cavity
Implement a 2x2 MIMO OFDM-based channel measurement system (no data yet) at 2.4 GHz Perform baseband processing and digital up and down conversion on Nallatech.
HAWCPol / SuperHAWC Software & Operations J. Dotson July 28, 2007.
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
STARLight PDR 3 Oct ‘01C.1 Hansen STARLight Peter Hansen PROJECT OVERVIEW.
Aquarius/SAC-D Mission Error Validation and Early Orbit Corrections Gary Lagerloef 6 th Science Meeting; Seattle, WA, USA July 2010.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
March 2004 At A Glance ITOS is a highly configurable low-cost control and monitoring system. Benefits Extreme low cost Database driven - ITOS software.
Exemplar CFS Architecture
NASA Goddard Space Flight Center Direct Readout Laboratory NPP/JPSS HRD/LRD Status Patrick Coronado NASA Goddard Space Flight Center directreadout.sci.gsfc.nasa.gov/ipopp.
TECHNOLOGY DEMONSTRATOR OF 7-CHANNEL DIGITAL FLIGHT DATA RECORDER AS AVIONICS TEACHING AID USING STATIC MODEL AIRCRAFT Authors 1. Wg Cdr Nikhil Verma,
0 - 1 © 2010 Texas Instruments Inc Practical Audio Experiments using the TMS320C5505 USB Stick “FIR Filters” Texas Instruments University Programme Teaching.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
2013 GOES-R AWG 2 nd Validation Workshop January 2014 Status of Activities and Plans for the GOES-R Core Ground System 1 Satya Kalluri Ph.D. GOES-R.
Aquarius Algorithm Meeting To Do Lists. From Frank Wentz:  Implement Ruf RFI flagging  Implement other QC flags  Further test review, and finalize.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
1 of 22 Glaciers and Ice Sheets Interferometric Radar (GISIR) Center for Remote Sensing of Ice Sheets, University of Kansas, Lawrence, KS
Aquarius Project Status 7 th Aquarius/SAC-D Science Team Meeting 11 April 2012.
Yimin Ji - Page 1 October 5, 2010 Global Precipitation Measurement (GPM) mission Precipitation Processing System (PPS) Yimin Ji NASA/GSFC,
MERMAG-M/MGF MGF-OS MGF-IS MAST-MGF MAST-SC PWI-SC Credit : RISH, Kyoto Univ.
1 Lunar Reconnaissance Orbiter (LRO) CRaTER Technical Interchange Meeting C&DH Flight Software April 14, 2005.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
Aquarius Algorithm Workshop Santa Rosa, CA 9 March 2010 College of Engineering Department of Atmospheric, Oceanic & Space Sciences Chris Ruf University.
National Aeronautics and Space Administration Scatterometer Algorithm Simon Yueh, Adam Freedman and Greg Neumann Jet Propulsion Laboratory Aquarius Science.
University of Kansas 2004 ITTC Summer Lecture Series Network Analyzer Operation John Paden.
1 JWST Functional Flow Diagrams and Schematic Block Diagrams.
22 March 2007 Science Simulator Overview and Status ICDS Susie Kennison.
Workshop Agenda: Day One 9:30 IntroductionLagerloef / Le Vine 9:45 Workshop objectivesG. Feldman 10:00 Overview of the Aquarius Data Processing System:G.
Control & Data Handling, Operator Control, Aircraft Interface to C&DH Steve Musko Space Physics Research Laboratory University of Michigan Ann Arbor, MI.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Science instruments data pipeline G. Martucci.
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
ISUAL Data Formats & Science Data Processing S. Geller.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
Mission Operations Review February 8-10, 2010 Cordoba, ARGENTINA SECTION 16.x Aquarius Science Commissioning and Acceptance Draft 2 Prepared by: Gary Lagerloef,
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
March /5/2016 At A Glance STARS is a real-time, distributed, multi-spacecraft simulation system for GN&C technology research and development. It.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
National Aeronautics and Space Administration The SMAP mission has not been formally approved by NASA. The decision to proceed with the mission will not.
Aquarius Simulation Studies Gary Lagerloef Aquarius Principal Investigator Algorithm Workshop 9-11 March 2010.
ADPS Science Software Development Bryan Franz NASA Ocean Biology Processing Group Aquarius Data Processing Workshop, NASA/GSFC, March 2007.
Evolution of the JPSS Ground Project Calibration and Validation System Patrick Purcell, Gyanesh Chander and Peyush Jain JPSS Ground Project NASA, GSFC.
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
6th Aquarius/SAC-D Science Meeting July 2010 Seattle, Washington, USA MWR Calibration pre-launch & post launch Juan Cruz Gallo (CONAE) Linwood Jones.
Aquarius Level 0-to-1A Processing Rule #1: save everything from the Level 0 data. Rule #2: never forget Rule #1! The objective is to ensure that the Level.
Radiometer Calibration: Implementation of Counts to TA Processor Frank Wentz and Thomas Meissner Aquarius Algorithm Workshop, Santa Rosa, CA, March 9-11,
Introduction to LabVIEW
Mission Operations Review 08 – 10 February 2009 Falda del Carmen, Córdoba, ARGENTINA SECTION 16 Aquarius Launch and Commissioning Operations Ron Boain,
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Architectural Description The Wind application is based on the JDDAC platform. The system is comprised of a network of weather stations responsible.
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Synthetic Data and Data Formats for the GPM GMI Radiometer
Exemplar CFS Architecture
ESA GSE.
GLAST Large Area Telescope:
Alternating Polarization ´Single´ Look Complex Product Status
Neurochip3.
Low Level RF Status Outline LLRF controls system overview
Launch and On-orbit Checkout
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
Low Level RF Status Outline LLRF controls system overview
Multichannel Link Path Analysis
Presentation transcript:

National Aeronautics and Space Administration Goddard Space Flight Center Greenbelt, MD Information contained in this document may be subject to U.S. export control laws and regulations (22 C.F.R and 15 C.F.R ). To the extent that the information contained within is subject to U.S. export control laws and regulations, the recipient has the responsibility to obtain export licenses or other export authority as may be required before exporting such information to foreign countries or providing access to foreign nationals. Aquarius Science Algorithms Workshop March 21-22, 2007 NASA’s Goddard Space Flight Center Radiometer Pre-Launch Calibration J. Piepmeier

Calibration Aquarius Sci. Alg. Workshop 2 of xx March 21-22, 2007 Outline Radiometer Off-line Analysis System Algorithm Theory – a couple of changes in works since CDR Pre-Launch Calibration Testing – Cal Plan draft 2 in review Radiometer Hardware Simulator – Matlab code written

Calibration Aquarius Sci. Alg. Workshop 3 of xx March 21-22, 2007 Radiometer Off-line Analysis System EM Version –File based running on WAMP, MySQL and Matlab on WinXP64 –Input: Files of DPU packets with LabView timestamp and serial number from last ICDS hardware simulator reset. –Output files (all Matlab except first set)  Raw SA, LA, and (packed) HK DN’s – block based formatting  Unpacked SA, LA, and HK temps DN’s – frame based formatting  DN-to-EU converted HK temps and frame-averaged DN’s of SA and LA  Frame-averaged TA’s (v and h) in K w/out physical temperature dependence FM Version –Same SW tools and I/O for now. Will update TA alg after I&T at GSFC –Input still file based –Output now stored in database storage indexed by timestamps

Calibration Aquarius Sci. Alg. Workshop 4 of xx March 21-22, 2007 Radiometer Calibration Model L #,v,h Losses for zone # and polarization v or h Loss for each thermal zone. Temperature dependent. T#T# Physical temperature for zone # Match available housekeeping telemetry TxTx Radiometric antenna temperature Stokes vector M Mueller matrix S Two-port S-Parameter matrix Need to update: L6 not separable from TND. Might move to here

Calibration Aquarius Sci. Alg. Workshop 5 of xx March 21-22, 2007 Current ATB Inverse model Internal calibration at RFE Loss corrections applied upstream to reflector Polarimetric corrections depend on instrument performance

Calibration Aquarius Sci. Alg. Workshop 6 of xx March 21-22, 2007 Alternate Inverse model Pre-launch calibration of ND’s and DL’s referred to OMT-coupler inputs Move Z-mismatch correction forward in model to between OMT-couplers and OMT Loss corrections applied upstream from there to reflector ---- (T Af’ ) X [v,h,U] or [v,h,p,m]

Calibration Aquarius Sci. Alg. Workshop 7 of xx March 21-22, 2007 Calibration Testing

Calibration Aquarius Sci. Alg. Workshop 8 of xx March 21-22, 2007 Radiometer Hardware Simulator What is it: Matlab code to mimic behavior of radiometer hardware Purpose –Predict hardware behavior over temperature –Pre-run T/V calibration testing –Re-run tests in software for troubleshooting anomalies Inputs –Hardware constants (gains, losses, phases, ENR’s, temp. coeff’s, etc.) –Thermal zone temperatures –Antenna temperature Stokes vector –Radiometer switch state (DL, ND, CND, blank) Output –VFC frequency in kHz for four channels Plans –Working with Susie to integrate in e2e simulator –Format data into DPU output stream –Feed data into GSFC I&T/Cal ground system

Calibration Aquarius Sci. Alg. Workshop 9 of xx March 21-22, 2007 Radiometer Hardware Constants rad.OMTcouplers.L0=10.^([0 0]/10); rad.OMTcouplers.T0=296; rad.CND.dphi=0*pi/180; %phase imbalance in CND network rad.CND.L=[2 2]; %loss factors in cables and rat-race rad.CND.Fc=[20 20]; %coupling coefficients rad.CND.Fc_cT=[.001/30.001/30]; %cT coupling coefficients rad.CND.TENR=(10^(23/10)-1)*295/10^(8/10); rad.CND.TENR_cT=.001; %cT TENR rad.CND.T0=296; %room temperature rad.diplexers.L0=10.^([ ]/10); rad.diplexers.T0=296; %room temperature rad.Dicke.L0=10.^([ ]/10);; rad.Dicke.T0=296; %room temperature rad.NDcouplers.L0=10.^([ ]/10); rad.NDcouplers.T0=296; rad.ND.Fc=[20 20]; %coupling coefficients rad.ND.Fc_cT=[0 0]; %cT coupling coefficients rad.ND.TENR(1)=(10^(23/10)-1)*295/10^(11/10); %23 dB ENR, 11 dB atten rad.ND.TENR(2)=rad.ND.TENR(1); rad.ND.TENR_cT=[0 0]; %cT TENR rad.ND.T0=296; %room temperature rad.isolators.L0=10.^([ ]/10); rad.isolators.T0=296; %room temp rad.LNA.G=10.^([30 30]/10); rad.LNA.G_cT=[ ]; rad.LNA.Tlna=[50 50]; rad.LNA.T0=296; rad.BW=30e6; rad.RBE.G=10.^([ ]/10); rad.RBE.G_cT=[ ]; rad.RBE.T0=296; rad.DET.cD=[ ]; rad.DET.cD_cT=[ ]; rad.DET.T0=296; rad.VFC.G=[ ]; rad.VFC.vinoff=[ ]; %mV rad.VFC.vinoff_cT=[ ]; %mV/C rad.VFC.voffset=[ ]; %V rad.VFC.T0=296; rad.VFC.vfs=[10e3 10e3 10e3 10e3]; %mV rad.VFC.fmax=[100e3 100e3 100e3 100e3]; %Hz rad.VFC.sf= rad.VFC.fmax./ rad.VFC.vfs ; %kHz/mV rad.tau = 8e-3; %seconds equiv integration time

Calibration Aquarius Sci. Alg. Workshop 10 of xx March 21-22, 2007 Radiometer Timing Sequence Timing –10-ms steps –12 steps make 1 subcycle –12 subcycles make one block Radiometer Sequencing –Antenna samples  70 ms per sub-cycle  3 x 10- and 2 x 20-ms bins –Internal calibration  3-state asymmetric Dicke switching  4-state sequence for polarimetric RFE calibration  Averaged over 10 samples/block –CND for polarimetric efficiency calibration once a subcycle –Null offset (blank) measured every block

Calibration Aquarius Sci. Alg. Workshop 11 of xx March 21-22, 2007 Instrument Block Diagram Deployed Solid reflector Feed/OMT1 1H 1V coupler CND Diplexer Radiometer Front End 1 (RFE1) Diplexer Radiometer Back End (RBE) Radiometer Digital Processing Unit (DPU) Radiometer Subsystem (GSFC) Antenna Subsystem (JPL) Scatterometer Front End (SFE) SSPA LVPS Scatterometer Back End (SBE) Chirp Generator Scatterometer Subsystem (JPL) Instrument Control and Data Subsystem (ICDS) (JPL) Aquarius Power Distribution Unit (APDU) (JPL) SAC-D Service Platform (S/P) (CONAE/INVAP) Feed/OMT2 Feed/OMT3 RF cable Ctrl./telem Pwr distr. Pyros control Survival heaters Mechanical S/S & Thermal Control (JPL)