IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for.

Slides:



Advertisements
Similar presentations
LQ Winding and Curing Tooling Internal Review F. Nobrega, N. Andreev April 9, 2007.
Advertisements

CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
UPDATE of RFCC MOUDLE Derun Li, Steve Gourlay Lawrence Berkeley National Laboratory MICE MICO Meeting December 21, 2011.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
19 Nov 08,ILC08Cherrill Spencer Rotating Coil System Description 1 Short description of the SLAC rotating coil system used to measure the CIEMAT-made prototype.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
INTRODUCTION to the DESIGN and FABRICATION of IRON- DOMINATED ACCELERATOR MAGNETS Cherrill Spencer, Magnet Engineer HOMEWORK PROBLEM for Lecture # 2 of.
ATF2 Magnets Summary of the Session on Magnets, Movers and Magnet Installation. ATF2 5 th Project Meeting, at KEK Cherrill Spencer, Magnet Designer and.
Magnet designs for Super-FRS and CR
ATF2 Magnets ATF2 Magnets 21 Mar 2007Cherrill Spencer, SLAC. Progress & Plans: ATF2 Magnets 1 Progress Report & Future Plans for the ATF2 FD Quads, FF&FD.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
ATF2 Magnets ATF2 Magnets 3rd July 2007Cherrill Spencer, SLAC. Info on top of FD ATF2quad for D. Urner 1 Information on top of the QC3 style quads that.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
ATF2 quads status 22Nov05- Cherrill Spencer 1 Status Report on the Design and Fabrication of 29 quads for ATF2 By Cherrill Spencer, SLAC, for ILC-BDS weekly.
Suggestion Directive from Magnet Systems Group for how to name ILC magnet types Cherrill Spencer, ILC 2 nd May 2006.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
F James T Volk June Permanent Magnets for Linear Colliders James T Volk Fermilab.
BPM support and beam pipe length FD support status A.Jeremie.
ATF2 Magnets ATF2 Magnets 22 May 2007Cherrill Spencer, SLAC. Progress on New ATF2 Magnets 1 Progress Report on ATF2 New Magnets 22 nd May 2007 Cherrill.
ATF2 Magnets ATF2 Magnets 27/28 Feb 2007Cherrill Spencer, SLAC. Info for QC3 machining discussion 1 Information for discussion about how to enlarge the.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
ATF2Quad Fab & Measurement Status Cherrill Spencer 02/28/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads and Spencer’s Trip to IHEP,
ATF2 Magnets ATF2 Magnets 7 Oct 08,ATF2 weekly meeting Cherrill Spencer Report ATF2 FD Quads: Mech Msts 1 Report on the mechanical measurements of ATF2.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
PASI OsC meeting 12th July 2012
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
19 Dec 2007Water manifolds for FD magnets 1 Installation Questions abut the cooling water manifolds for the FD quads& sextupoles. Questions for Araki,
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
Cherrill Spencer, SLAC. MDI Workshop Jan '05 1 Impact of Crossing Angle Value on Magnets near the IP Overview of several unusual quadrupole designs that.
SBS Magnet and Support Status Robin Wines June 2013.
ATF2 Magnets ATF2 Magnets 26May'08, NanobeamsMtg Cherrill Spencer Status Report ATF2 FD Magnets 1 Status Report on the ATF2 “Final Doublet” magnets: 2.
ATF2Quad Fab & Measurement Status Cherrill Spencer 01/31/06 1 Brief Status Report on Fabrication & Measurement of ATF2 Quads By Cherrill Spencer, SLAC,
ATF2 Magnets ATF2 Magnets 2 Oct 2007Cherrill Spencer Info for ATF2 magnet alignment discussion 1 Information on Alignment Issues for ATF2 magnets: for.
ATF2 Magnets ATF2 Magnets KNU,Korea ATF2 mtgSpencer & Lam SLAC Lessons learned 1 Lessons learned from designing, fabricating & installing ATF2 magnets.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
Linac4 MAC 29 th January 2008 Thomas Zickler AT/MCS/MNC/tz 1 Magnets for Linac4 Th. Zickler CERN Linac4 Machine Advisory Committee 28 th - 30 th January.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
S-BPM Support Issues to be discussed with LAPP and KNU
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Yingshun Zhu Design progress of QD0 in CEPC Interaction Region
Procurement, Measurement and Installation of 2 Octupoles for ATF
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Development of the Canted Cosine Theta Superconducting Magnet
Halbach Magnets: Design, Prototypes & Results
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Ramesh Gupta Brookhaven National Laboratory
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
ELENA Magnet Installation Planning
Brief Status Report on Fabrication of ATF2 Quads
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
High Precision Magnet Production for NSLSII at IHEP
LARP Rotatable Collimators for LHC Phase II Collimation
Budker Institute of Nuclear Physics,
ESS MEBT Quadrupole magnets
Electron Collider Ring Magnets Preliminary Summary
Presentation transcript:

IHEPTrip Cherrill Spencer 12/20/05 1 Report on my December 2005 Trip to IHEP, Beijing to Monitor Fabrication of ATF2 Quads By Cherrill Spencer, SLAC, for ILC-BDS weekly meeting on 20 th December 2005

IHEPTrip Cherrill Spencer 12/20/05 2 ATF2 quadrupoles : QEA-D32T180 Recap on Activity from June – November 2005 Are 8 quadrupoles in the extension of the ATF extraction line Are 6 quads in matching section of ATF2 beamline Are 14 quads in final focus section of ATF2 ( aside from QF1&QD0) Decided an existing KEK quad called the TOKIN 3390 (“QB4” style) would be basis of the design for the 28 ATF2 quads listed above. Contract signed in early July with the Magnet Shop of the Institute of High Energy Physics (IHEP) in Beijing, China to make new drawings and fabricate 29 quads (1 spare) by March 31 st July-Sept: Spencer wrote very detailed specifications for this quad, new name: QEA-D32T180. IHEP drew new drawings for all parts and assemblies. Mostly approved in late September. Sept-Oct: Spencer continues negotiating changes in fabrication processes and materials to accommodate capabilities of IHEP magnet shop and availability of materials, so tight schedule can be met. Mid-Late October: IHEP designing and fabricating coil winding forms October-Late November: IHEP machining first magnet’s 4 steel core pieces Hollow copper conductor delivery delayed by ~ 1 month to December 20th

IHEPTrip Cherrill Spencer 12/20/05 3 ATF2 quadrupoles : QEA-D32T180 Spencer’s activities during trip to IHEP, 6 th -14 th Dec ‘05 Observe completed main and trim coil winding forms Observe and inspect coil winding shop Inspect first 4 wound trim coils: size, resistance and inductance OK Observe and inspect coil potting shop Observe the brand new Electric Discharge Machine (EDM) Inspect 4 quadrants of the first quad’s steel core: before EDM’ing of the hyperbolic-shaped poletips Assembled core’s 4 poletips machined over the weekend Toleranced dimensions near the poletips measured with micrometer All toleranced dimensions are within tolerance (see later slide) Detailed discussions of OPERA 3D computer model of quad: appears model not predicting accurately. Spencer will try modelling it with our own new OPERA program which is due to arrive 21 st Dec. Detailed discussions of POISSON 2D model: shows inefficiencies Observe Magnet Measuring Laboratory; see drawings of new rotating coil

IHEPTrip Cherrill Spencer 12/20/054 3 ). Detail of coil 3. Coil manufacturing NOT FINAL COIL DRAWING: DO NOT USE

IHEPTrip Cherrill Spencer 12/20/05 5 Trim coil winding form (left) and main coil winding form set-up on winding machines

IHEPTrip Cherrill Spencer 12/20/05 6 IHEP film potting apparatus (left); Dr Xuwen Dai measuring dimensions of first trim coils

IHEPTrip Cherrill Spencer 12/20/057 1). Overview of general assembly: QEA-D32T General Assembly NOT FINAL DRAWING. DO NOT USE 32mm bore 180mm core length 47 turns per water cooled coil Max gradient 55 T/m

IHEPTrip Cherrill Spencer 12/20/05 8 First quad’s core before poletips been EDM’d; IHEP’s new EDM machine

IHEPTrip Cherrill Spencer 12/20/05 9 First core after all machining finished, in the IHEP Machine Shop.

IHEPTrip Cherrill Spencer 12/20/05 10 ATF2 quadrupoles : QEA-D32T180 First core’s poletip measurements HERE ARE THE MEASUREMENTS OF THE FIRST CORE: Diameters at 4 different Z in mm To be compared with 32 +/- 0.05mm What matters is the spread of the values — their spread is less than the +/-0.05 tolerance It is OK that the absolute diameters are a little larger than 32mm Four spaces between adjacent poles, measured at 3 different Z, mm: 10.27, 10.26, (between poles 1 and 2) 10.23, 10.23, (between poles 2 and 3) 10.21, 10.21, (between poles 3 and 4) 10.26, 10.26, (between poles 1 and 4) To be compared with / All values meet the tolerance.

IHEPTrip Cherrill Spencer 12/20/05 11 IHEP’s ATF2 QUAD team (left); view from my Guest House Room

IHEPTrip Cherrill Spencer 12/20/05 12 My IHEP liaison/escort/guide: Dr Jianbing ZHAO at the Great Wall near Beijing

IHEPTrip Cherrill Spencer 12/20/05 13 At the Summer Palace (note the frozen lake) and the Tiananmen Gate to the Palace Museum

IHEPTrip Cherrill Spencer 12/20/05 14 Next steps: late December ’05- January ‘06 First core being measured on a CMM- results will be sent out Hollow conductor should arrive today (20 th Dec) Five main coils will be wound and potted First coil will be cut in half so we can inspect the turn’s pattern and quality of impregnation of the epoxy Video conference on 3 rd /4 th January amongst IHEP, KEK and SLAC to inspect the cut coil via TV If first coil OK they will continue to wind coils By ~ 9 th January - first magnet will be assembled By ~ 25 th January first magnet will be measured at IHEP by new, custom designed rotating coil. If first quad looks OK production will be given go-ahead.