Superconducting Undulator R&D Proposal for LCLS-II Paul Emma (SLAC) Superconducting Undulator R&D Review Jan. 31, 2014 please MUTE your microphones or.

Slides:



Advertisements
Similar presentations
SCU Development at LBNL Soren Prestemon Lawrence Berkeley National Laboratory Superconducting Undulator R&D Review Jan. 31, 2014.
Advertisements

LCLS-II Scientific Opportunities Workshops LCLS-II Status David Schultz 9-12 February 2015.
DELTA Project Overview Heinz-Dieter Nuhn – LCLS Undulator Group Leader Presented at LCLS-II Physics Meeting Tuesday, October 11, 2011.
Undulator R & D Jim Clarke STFC Daresbury Laboratory, UK BAW-2 SLAC Jan 2011.
Status of the UK Superconducting Undulator Studies Jim Clarke ASTeC, STFC Daresbury Laboratory FLS 2012, March 2012.
SCUs for the LCLS-II HXR FEL SCUs for the LCLS-II HXR FEL P. Emma, et. al. July 9, 2014 Hard X-Ray (HXR) FEL for LCLS-II must cover 1-5 keV (4-GeV) SASE.
SCU Measurements at LBNL
Hard X-ray FELs (Overview) Zhirong Huang March 6, 2012 FLS2012 Workshop, Jefferson Lab.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
1 Enhancements to the Linac Coherent Light Source.
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
October 12, 2006 Heinz-Dieter Nuhn, SLAC / LCLS Undulator Good Field Region and Tuning Strategy 1 Undulator Good Field Region and.
Undulator Physics April 29, 2004 Heinz-Dieter Nuhn, SLAC / SSRL Facility Advisory Committee Meeting Undulator Physics Diagnostics.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Overview of Proposed Parameter Changes Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Superconducting Undulator (SCU) Development at ANL Efim Gluskin on behalf of the APS/ANL team Superconducting Undulator R&D Review Jan. 31, 2014.
Superconducting Undulator R&D Review SLAC, LBNL, ANL Jan. 31, :00 AM (PST) Kings River Room (B ), SLAC or “Go-To-Meeting” teleconference.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
DELTA R&D Project at SLAC
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
Undulator Working Group Summary Heinz-Dieter Nuhn – Alexander Temnykh Presented at Friday, March 9, 2012.
P. Emma, …for the SCU R&D collaboration: ANL, LBNL, SLAC August 28, 2014 P. Emma, N. Holtkamp, H.-D. Nuhn, SLAC C. Doose, J. Fuerst, Q. Hasse, Y. Ivanyushenkov,
SuperConducting Undulator (SCU) R&D Motivation and Status P. Emma For the SCU R&D collaboration: ANL, LBNL, SLAC June 27, 2014.
The impact of undulators in an ERL Jim Clarke ASTeC, STFC Daresbury Laboratory FLS 2012, March 2012.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Cost Estimate Marion White (Argonne) SCU 3-Lab Review Meeting December 16, 2014.
Paul Emma, et. al. Sep. 18, 2013 Paul Emma, et. al. Sep. 18, 2013 Design Considerations for the NGLS (Next Generation Light Source) NGLS.
LCLS-IISC Parameters Tor Raubenheimer. 2 Operating modes keV (120 Hz) keV (100 kHz) keV (100kHz) 4 GeV SC Linac Two sources:
The Future of Photon Science and Free-Electron Lasers Ingolf Lindau Lund University and Stanford University MAX-Lab and Synchrotron Light Research KTH,
Option – 5m Undulators What is the optimum length for an LCLS undulator?  XFEL is using 5m undulator segments.  Is this optimum?  What are the advantages.
LCLS-II Capabilities & Overview LCLS-II Science Opportunities Workshop Tor Raubenheimer February 10 th, 2015.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
External Seeding Approaches: S2E studies for LCLS-II Gregg Penn, LBNL CBP Erik Hemsing, SLAC August 7, 2014.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
LCLS-II Design and FEL R&D
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
LCLS-II: Accelerator Systems LCLS SAC Meeting P. Emma et al. April 23, 2010.
Preliminary Tracking Results through LCLS-II P. Emma et al., Oct. 23, 2013 Thanks to Mark Woodley and Yuri Nosochkov for MAD design work Use Christos Papadopoulos.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Design and Measurement Results for the Permanent Magnet Undulators for the Linac Coherent Light Source Facility II D. Arbelaez BeMa2014, 01/02/2014.
G. Penn SLAC 25 September 2013 Comments on LCLS-IISC Design.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
1 0.1-nm Hard X-ray XFEL  Project Period: 2011 ~ 2015  Total Budget: 400 M$  10-GeV Electron Linac (Normal Conducting S-band, 60 Hz)  Total Length:
LCLS-II options: CuRF → SXR, VPU, HXR harmonics G. Marcus 5/13/2015.
Harmonic Generation in a Self-Seeded Soft X-Ray LCLS-II J. Wu Feb. 24, 2010.
FEL SCU development at APS/ANL
Summary of Session: Magnets and undulators for light sources 2
Challenges of vacuum chambers with adjustable gap for SC undulators
SCU R&D Motivation P. Emma …for the SCU R&D collaboration: ANL, LBNL, SLAC Close-Out Review Mar. 3, 2016.
Undulator Tolerances for LCLS-II using SCUs
SCUs for the LCLS-II HXR FEL P. Emma July 8, 2014
LCLS Instrument Development
LCLS-II-HE FEL Facility Overview
LCLS-II-HE FEL Facility Overview
Phase Adjustments: K vs
A Cold SCU Phase-Shifter
TW FEL “Death-Ray“ Studies
Two-bunch self-seeding for narrow-bandwidth hard x-ray FELs
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
LCLS FEL Parameters Heinz-Dieter Nuhn, SLAC / SSRL April 23, 2002
Heinz-Dieter Nuhn – LCLS Undulator Group Leader May 14, 2009
Achieving Required Peak Spectral Brightness Relative Performance for Four Undulator Technologies Neil Thompson WP5 – 20/03/19.
Undulator Physics Diagnostics / Commissioning Strategy Heinz-Dieter Nuhn, SLAC / SSRL August 11, 2004 Undulator Overview FEL Parameters Diagnostics and.
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

Superconducting Undulator R&D Proposal for LCLS-II Paul Emma (SLAC) Superconducting Undulator R&D Review Jan. 31, 2014 please MUTE your microphones or turn down volume

SCU R&D Review, Jan. 31, 2014 Outline of Presentation Meeting Agenda LCLS-II Performance Requirements and Issues Superconducting Undulators (SCU’s) compared with permanent magnet undulators SCU impact on LCLS-II Hard X-Ray (HXR) FEL performance SCU impact on LCLS-I performance (using Cu linac) Brief SCU R&D Plan (more from other speakers) Review Charge and Committee This is a review of the R&D Proposal which leads up to a possible design baseline change in 2015, and not an evaluation of that decision.

SCU R&D Review, Jan. 31, 2014 DRAFT Agenda for Jan. 31 Review * (2014) * Carried out by teleconference to save travel. Chairman assembles committee response in writing within 2 weeks (Feb. 14, 2014) Meeting Site at (no password needed): Review Agenda (all times Pacific/SLAC): 07:00 AM (5 min)Welcome and ChargeNorbert Holtkamp (SLAC) 07:05 AM (30 min)SCU Advantages in LCLS-IIPaul Emma (SLAC) 07:35 AM (20 min)Undulator Tolerance EstimatesHeinz-Dieter Nuhn (SLAC) 07:55 AM (50 min)SCU Development at ANLEfim Gluskin (ANL) 08:45 AM (10 min)(break)- 08:55 AM (50 min)SCU Development at LBNLSoren Prestemon (LBNL) 09:45 AM (20 min)SCU Field MeasurementsDiego Arbelaez (LBNL) 10:05 AM (25 min)(executive session)Committee Only 10:30 AM(adjourn)-

SCU R&D Review, Jan. 31, 2014 LCLS-II Design Summary New 4-GeV CW linac (1 MHz) and 2 new FELs (~2020) 2 New Permanent Magnet (PM) adjustable gap undulators SXR FEL: keV (SASE and self-seeded) HXR FEL: keV (SASE and self-seeded?) PM for HXR undulator barely allows 5.0 keV in SASE (no self- seeding unless 4 keV or less) – existing und. hall is 150 m Will also replace existing LCLS-I und. with adj.-gap PMU (HXR) Radiation damage to PM’s is a major issue at 1 MHz (gap?) HXR FEL based on 150-m long PM-undulator at 4 GeV is very sensitive to e  emittance when tuned above 3.5 keV (risk) Schematic of the LCLS-II facility with the new SCRF linac and two new undulators, along with the existing copper (Cu) linac, undulator and experimental halls. The “Cu Linac” is in the 3 rd km of the SLAC tunnel. HXR FEL SXR FEL

SCU R&D Review, Jan. 31, 2014 Superconducting Undulator Motivation Using an SCU for the LCLS-II HXR undulator… …allows full LCLS-II performance to 5 keV (SASE & self- seeded) and with m less undulator (or more taper) …has orders of mag. less sensitivity to rad. dose …is much less sensitive to e  emittance (new high-rate gun) …produces very low pressure in a small vacuum chamber (gas scattering at 1 MHz) …enhances LCLS-I FEL power, whereas a new PM degrades it.

SCU R&D Review, Jan. 31, 2014 SCU’s Provide Real Performance Enhancement SCU (Nb 3 Sn) SCU (NbTi) PM (NdFeB) PM (in-vac) gap = 7.5 mm (5.7 mm for in-vac  same stay-clear) Much higher fields for a given period and gap (planar undulators) LCLS-II PMU u = 26 mm B pk = 1.0 T gap = 7.2 mm

SCU R&D Review, Jan. 31, 2014 Examine Field’s Impact on LCLS-II Undulator Length The next 2 slides assume the following: 4-GeV electron energy (1 kA,  = 0.45  m,  E = 500 keV, etc.) keV photon tuning range (SASE & self-seeded) Full-height magnetic gap of 7.5 mm (chamber gap is 5.7 mm) Und. period set by lower-limit photon energy (1.2 keV) for FEL resonance at highest field possible for this gap and technology Und. length set by max. photon energy (4 keV), assuming 18L G (based on beam brightness), plus 50% longer for self-seeding Compare in-vacuum and out-of-vacuum Permanent Magnets (NdFeB), and SCUs (NbTi & Nb 3 Sn) – all with same chamber gap Und. length includes 1.15-m breaks, 3.4-m segments, +20% for margin, and 4-m extra space for self-seeding monochromator Examine total length sensitivity to main parameters (see next)…

SCU R&D Review, Jan. 31, 2014 Undulator Length vs. e  Energy for LCLS-II HXR PM In-Vac NbTi Nb 3 Sn u = 27.5 mm, 24.8 mm, 20.3 mm, 18.7 mm (4 GeV) keV Self-Seeded (SS) u = 16.3 mm u = 20.3 mm u = 18.7 mm g = 7.5 mm  = 0.45  m I pk = 1 kA  E = 500 keV  = 15 m g = 7.5 mm  = 0.45  m I pk = 1 kA  E = 500 keV  = 15 m Period varies with energy to maintain lower-limit tuning range (1.2 keV)

SCU R&D Review, Jan. 31, 2014 Und. Length Comparison for LCLS-II HXR Self-Seeded + 20% PM In-Vac NbTi Nb 3 Sn u = 27.5 mm, 24.8 mm, 20.3 mm, 18.7 mm PM sensitive to  x,y 5 keV SS not possible stay-clear = 5.7 mm abc def  -bunching not incl. u defined by this

SCU R&D Review, Jan. 31, 2014 Compare Baseline LCLS-II with LCLS-I (Cu linac) PM, u = 26 mm (project baseline) LCLS-I LCLS-I FEL Performance Compromised with new PMU H.-D. Nuhn

SCU R&D Review, Jan. 31, 2014 Compare Nb 3 Sn ( u = 20 mm) LCLS-II with LCLS-I Nb 3 Sn, u = 20 mm LCLS-I FEL Further Enhanced with 20-mm SCU H.-D. Nuhn

SCU R&D Review, Jan. 31, 2014 SCU R&D Plan in Brief ANL… Builds 2-m test cryostat (based on existing design at APS) Build & test 1.5-m long NbTi prototype planar undulator ( u  21.0 mm) LBNL… Build & test 1.5-m long Nb 3 Sn prototype planar undulator ( u  18.5 mm) Develop and tune each of the NbTi and Nb 3 Sn undulators Both Labs… Develop field measurement and field correction techniques Demonstrate predicted field, field quality, end-field corrections, field measurement and tuning, cold mass fiducialization, and integration of cold mass into cryostat Goal: Within 18 months deliver 2 fully functional, 1.5-m long, SC prototype undulators which meet LCLS-II specifications

SCU R&D Review, Jan. 31, 2014 SCU R&D and LCLS-II Construction Time-Line 17-Month SCU R&D (to ~May 2015) 3-Year production cycle for 33 SCU segments (~3 m/ea) Installation of LCLS-II undulator starts mid-2018 Start SCU R&D End R&D Start Und. Installation Production UndulatorProduction SCU R&D Linac and Cryo Install Complete

SCU R&D Review, Jan. 31, 2014 Review Committee and Charge NameInstitute AddressConfirmed Mikael Eriksson, chairMax – 12/18/13 Sara – 12/18/13 David – 12/17/13 Joachim – 12/18/13 Johannes – 01/08/14 Review Committee: Charge to the Committee: 1.Is the SCU R&D plan technically sound, and is it well enough defined in scope, schedule, and cost so as to produce definitive results that can support a baseline design change to the hard x-ray LCLS-II undulator, by May 2015? 2.If the plan appears insufficient, what recommendations can the committee make to improve the chances for supporting a baseline change within 18 months? 3.What further alterations might be made to solidify the plan and move it forward in time or reduce costs?

SCU R&D Review, Jan. 31, 2014 End

SCU R&D Review, Jan. 31, 2014 Compare Nb 3 Sn ( u = 18.5 mm) LCLS-II with LCLS-I Nb 3 Sn, u = 18.5 mm LCLS-I LCLS-I FEL Performance Enhanced with New SCU H.-D. Nuhn

SCU R&D Review, Jan. 31, 2014 Und. Length with 4-mm Stay Clear (5.8 mm gap)PM In-Vac NbTi Nb 3 Sn u = 25.0 mm, 22.0 mm, 18.6 mm, 17.0 mm stay-clear = 4.0 mm

SCU R&D Review, Jan. 31, 2014 Prototype Undulator Parameters